| Sl. No. | Item Description |
| 1 | Civil works |
| 2 | EXCAVATION upto 1.50 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Dense or Hard soil MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, cutting vegetation up to 1.5m ht if required and disposing off the excavated stuff upto all lead and lift. Note- All types of soil that can be removed by JCB/ Poclain bucket shall be classified under this item. |
| 3 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard Murrum MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift. |
| 4 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Soft rock not requiring blasting but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift |
| 5 | EXCAVATION 3.00 to 5.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Soft rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift |
| 6 | EXCAVATION 3.00 to 5.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift |
| 7 | FILLING with selected & approved available excavated earth (excluding rock) in excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. |
| 8 | FILLING with selected & approved Murrum material brought by Contractor from outside client's premises, including Identification of Borrow pits and including Royalty charges & or duties as per requirement of local authority, in foundations, excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. |
| 9 | Providing and laying RUBBLE SOLING wherever required in foundation and plinth including hand packing fillings interstices with chips and sand. Watering and compacting to consolidated thickness, etc complete as directed by engineer-in-charge |
| 10 | Providing material and labour for laying PLINTH PROTECTION including excavation of 30 cm depth and Filling with dry bricks bats of 20 cm thick and top layers C.C. 1:2:4 ( 1 cement 2 coarse sand: 4 graded stone aggregate 20m nominal size)50mm thk finished in proper grade and slop etc. complete as directed by engineer-in-charge |
| 11 | Carring out plinth treatment to post construction / existing structure by spraying chemical solution for termite control treatmentincluding labour and material consistment with I.S.I specification.Using Chlordene and Chiorpurfiles 20 EC. As Per 6131_paret-II Consentration Weight one percent is recommended i.e one LTR. 20 EC chemical emulsion with 19 liter give 1 % concrentration inclusive of one LTR. chemical emulsion appication at the rate of 5 LTR. chemical / Sqm of surface is recommended as per I.S. treated Plinth area of structure to be measured for payment as directed by engineer-in-charge |
| 12 | Providing and laying Granular subbase (GSB) for preparing base of road, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required by providing close graded Material, mixing in a mechanical mix plant at OMC(Optimum Moisture Content), carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete. |
| 13 | Providing and laying PLAIN CEMENT CONCRETE 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) in foundations and superstructure including, machine mixing, leveling compacting, curing and formwork if any, scaffolding, staging etc. complete as directed and instructed by Engineer-in-Charge. Volume of PCC laid to be measured for payment. |
| 14 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Foundations, footings, Base of columns and Mass concrete, as directions of Engineer in charge Complete.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 15 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Columns, Pillars posts and struts etc complete as directed by Engineer-incharge. Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 16 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Lintels, Beams, Girders and Cantilever etc complete as directed by Engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 17 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.200 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering, scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Slabs, landing, shelves and Cantilever etc complete as directed by engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M20 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 18 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Slabs, landing, shelves and Cantilever etc complete as directed by Engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 19 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering, scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in WALLS from top foundation level to all levels etc complete as directed by Engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 20 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering, scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Staircases, as directions of Engineer in charge Complete.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 21 | Providing, laying and fixing in position REINFORCEMENT High yield deformed bars/TMT/ FE500/FE500D/FE550 for R.C.C. works at all levels including cutting, bending and binding with 16 gauge M.S. annealed wire, providing cover blocks of C.M. 1:2 Embedded with binding wire etc. complete. The reinforcement detailing to IS 456 or, if specified by engineer, shall conform to IS: 13920 (Ductile detailing of R. C. Structures), bars as per IS 1786 the rate shall be inclusive of executing such detailing. Laps to be measured shall be as shown in drawing and for reinforcement length longer than available in market. Chairs, pins and laps other than that specified shall not on be measured and paid for. No extra to be paid for height, rate remains same at all levels, complete as per drawings, specification, direction of engineer-incharge. Make: TATA, SAIL, JSW or as approved by engineer-in-charge Complete. |
| 22 | Providing material & labour for laying Rebar in Existing Column, Beam and Slab including all dia. Of bars 8mm to 32mm as per drawing and specification as directions of Chief Engineer in charge Complete. Make Hilti or Fischer or its equivalent as approved by engineer-in-charge |
| 23 | Providing material and labor for Structural steel work (Confirming to IS 4923-1997) riveted, bolted or welded in builtup, conventional, Hollow section, etc for all type sections, in framed work, railing work, any type of fabrication work, including cutting, hoisting, fixing in position and applying a priming coat &two coat applying synthetic enamel paint of approved steel primer all complete as per the structural designs and as directions of Engineer- in -Charge Complete. |
| 24 | Brick work using common burnt clay building bricks including scaffolding, raking of joints, curing using first class bricks having min. comp. Strength 35 kg/cm2 of approved manufacturer in foundation and plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand)(B)ConventionalAll bricks and shall be soaked in water for at least 24 hours before use. bricks used for masonry work shall be as available locally, but approved before start of work. volume of masonry to be measured for payment. |
| 25 | Providing & fixing LIGHT WEIGHT MASONRY BLOCKS of- Sand Based Autoclaved Aerated Concrete blocks (AAC Blocks) of any thickness using Epoxy based jointing adhesive of approved make, upto all floor level/all heights, masonry walls in jointing mortar, complete as per Technical specification, density of blocks shall not exceed 700 kg/cum, using bonding material supplied by the manufacturer as per their instructions, including necessary scaffolding for fixing, in line & level. Volumne of blocks erected to be measured for payment. R.C.C. coping of size-wall thickness x 100mm ht. at 0.91m intervals shall be provided including reinforced with 2 Numbers 6mm diameter horizontal bars and 8mm diameter at 200 c/c ties. R.C work not to be measured separately but included in rate. other specifications as directions of Engineer in Charge Complete |
| 26 | Providing and laying 10mm thick in single coat CEMENT PLASTER in (i)Cement mortar 1:3 (1-cement:3-sand) at all height/all floors to internal surfaces of all elements, walls, R.C.C. work, Ceiling,[backing coat at places where glazed or ceramic tiles are to be fixed etc]. including hacking of concrete surfaces, racking of joints, scaffolding, curing, providing chicken mesh at all necessary joints, etc. complete. Final finished surface shall be little rough , so it has proper bonding to paint putty.The surfaces to be plastered to be hacked immediately on de-shuttering. The Brick/ RCC surface to be plastered to be cured sufficiently before start of plaster. Initial bare surface area to be Plastered shall be measured for payment unless noted otherwise, etc as directions of Engineer in charge Complete. |
| 27 | Providing and laying 20mm thick SANDFACED CEMENT PLASTER of required grain finishing upto all height/all floors including grooves, pattas etc. in two coats having the the base coat of not less than 12 mm thickness in CM 1:3 (1-cement : 3-sand) & finished coat 8 mm thk, in CM 1:1 (1-cement : 1-sand) to external surfaces of concrete & masonry including hacking of concrete surfaces, racking of joints, scaffolding, curing, providing chicken mesh at all necessary joints, etc. complete. Rate shall include addition of “Impermo” water proofing compound or equivalent as approved by engineer-in-charge, providing, adding & mixing of fine fibrillated 100% virgin polypropylene fibers in cement mortar to form homogeneous mixture @125 gms per a bag of cement in both the coats of plaster, 12mm long fibers shall be used in first coat & 6mm long fibers shall be used in second finished coat. providing drip mould 40mm wide and 12mm thick in cement mortar 1:3 on soffit of chajjas, canopies, gutters etc.complete. as directions of Engineer in charge Complete.The surfaces to be plastered to be hacked immediately on de-shuttering. The Brick/ RCC surface to be plastered to be cured sufficiently before start of plaster. Initial bare surface area to be Plastered shall be measured for payment unless noted otherwise, etc as directions of Engineer in charge Complete. |
| 28 | Providing material and labor for applying Two coats of gypsum upto desired thickness for getting undulation free surface and accurate plumbness in walls. including providing grooves as per architectural drawings at all the edges of windows/Doors with neat finish on new/existing wall surface to give an even shade including thoroughly brushing the surface free from mortar dropping and other foreign matter and sand papered smooth.make the surface uniform and levelled and must be without any undulation as directed by engineer in charge complete.Make: Diamond gypsum or as approved by engineer-in-charge. |
| 29 | Providing material and labor for applying Two coats of acrylic putty upto desired thickness for getting undulation free surface and accurate plumbness in walls. including providing grooves as per architectural drawings at all the edges of windows/Doors with neat finish on new/existing wall surface Work includes surface cleaning, removal of loose particles, minor leveling, and application of putty in one or more coats to accurately achieve the required thickness. After proper curing, the surface will be sanded to a smooth, even finish suitable for painting. Thickness will be checked for accuracy throughout the application to ensure compliance with project specifications. |
| 30 | Providing material & labour for Internal Wall painting (two coats) with Luxury Emulsion of approved brand and manufacture including suitable primer coat on undecorated wall surface to give an even shade including throughly brushing the surface free from mortar droppings and other foreign matter and sand papered smooth. as directed by engineer in charge complete. One component waterborne 100% pure acrylic interior eggshell emulsion that must offer protection against different varieties of bacteria and fungus. Paint should free of HCHO, APEO and have crack bridging property of min 0.9 mm with class 1 flame spread resistance The product shall have a Volume Solids of minimum 35%The product shall be independently tested and approved for properties alike resistance to bacterial and fungal species, crack tolerance and flame spread resistance.The coating shall contribute to satisfying the following credit(s): Indoor Environmental Quality (IEQ) under LEED® 2009 Environmental Quality (EQ) and Materials and Resources (MR) under LEED® v4This product shall have a VOC limit not more than 24 g/lit. The product can be like Asian paint Royale series or approved equivalents.Two Coats of above paint should be applied using conventional Roller / Airless spray at the site after application and drying of applied Putty-Primer. For measurement of painting items the area painted shall be considered without any multiplication factor for different kinds of surfaces painted. Rate shall be quoted accordingly. All painting items final finish shall be as per manufacturer'sspecification as per acceptance of Engineer in charge /Architect. No extra payment shall be made for extra/over coat if required.The rate shall be inclusive of providing bamboo scaffoldingMake: Jotun,Asian Paints, Berger Paints, Dulux Paints or equivalent.Guidelines for application1. Surface Preparation - Inspection: Assess the wall surface for defects like cracks, moisture, or old paint layers. All imperfections must be fixed before starting the painting process. - Cleaning: Clean the wall to remove dust, grease, and loose particles. Use a mild detergent solution or a vacuum to ensure a clean surface. - Repair: Fill cracks, holes, and other imperfections with a suitable filler (e.g., putty or spackle). Sand the area smooth after drying. - Priming: Apply a suitable primer to the wall to ensure proper adhesion of the artistic paint. Choose a primer based on the wall material (e.g., masonry, drywall, plaster). Allow the primer to dry according to the manufacturer's instructions. 3. Application Process - Base Coat: - Apply a base coat of paint, using a roller for large areas and a brush for edges and corners. Choose a base color that complements the final artistic design. - Allow the base coat to dry completely - Artistic Painting: - As per details provided by architect, Plan the design by sketching it lightly on the wall with a pencil or chalk & get necessary approval from architect or engineer-in-charge. Post approval proceed for final application. 4. Finishing - Sealing (Optional): Apply a clear sealer or varnish over the artwork for added protection, a matte, satin, or gloss finish based on the desired effect.6. Quality Standards - Adhesion: Paint should adhere firmly to the wall without peeling or flaking. - Finish: The final surface should be even, free of brush marks, and match the intended artistic design. - Durability: The painted surface should withstand normal wear and cleaning without damage |
| 31 | Providing and Applying Acrylic Washable Emulsion Paint with work includes providing and applying acrylic washable interior emulsion paint on internal plastered wall surfaces, in required shade, complete as directed by the Engineer‐in‐Charge. The paint shall be of approved brand, having low VOC, anti‐fungal properties, washable and suitable for high-traffic areas such as schools, offices, hospitals, and institutional buildings. Shade shall be pre-approved before application.Before application, the surface shall be thoroughly cleaned to remove dust, dirt, grease, soot, laitance, algae, loose paint and any other foreign matter. Surface cracks, dents, pores and undulations shall be repaired with approved wall putty or plaster of Paris. The surface shall then be rubbed and smoothened by sandpapering to obtain an even and uniform surface. All loose dust shall be removed afterwards.One coat of approved primer compatible with acrylic washable emulsion system shall be applied after proper surface preparation. The primer must be allowed to dry fully before applying the next coat. After the primer dries, the surface shall again be lightly sanded wherever necessary to ensure smooth finish.Two or more coats of approved acrylic washable emulsion paint shall then be applied using brush or roller as per manufacturer’s recommended dilution. The coats shall be applied uniformly to achieve even colour shade and smooth matt, soft sheen or satin finish as specified. The finished work shall be free from streaks, chalking, patchiness, pinholes, loose particles or brush marks. Any additional coats required to achieve uniform shade and finish shall be done by the contractor at no extra cost.The rate quoted shall include cost of all materials, tools, primer, emulsion paint, putty, labour, scaffolding and necessary protective covering to furniture, fixtures, floors, windows, switchboards and adjacent surfaces. Any stains, splashes or paint marks shall be cleaned immediately and the area shall be handed over in neat condition after completion of work.Measurement shall be made in square metres of the finished painted surface. The rate shall include complete work including cleaning, surface preparation, primer, putty, and applying multiple coats of acrylic washable emulsion paint with all incidentals to complete the job as directed.The rate shall be inclusive of providing bamboo scaffoldingMake: Jotun,Asian Paints, Berger Paints, Dulux Paints or equivalent. |
| 32 | Providing material & labour for Internal Wall painting (two coats) with Premium Emulsion of approved brand and manufacture including primer coat on undecorated wall surface to give an even shade including throughly brushing the surface free from mortar droppings and other foreign matter and sand papered smooth. as directed by engineer in charge complete. emulsion that must offer protection against different varieties of bacteria and fungus.The product shall be independently tested and approved for properties like resistance to bacterial and fungal species, crack tolerance and flame spread resistance.The coating shall contribute to satisfying the following credit(s): Indoor Environmental Quality (IEQ) under LEED® 2009 Environmental Quality (EQ) and Materials and Resources (MR) under LEED® v4This product shall have a VOC limit not more than 24 g/lit. The product can be like Asian apcolite emulsion or Jotun Paints or approved equivalents.Two Coats of above paint should be applied using conventional Roller / Airless spray at the site after application and drying of applied Putty-Primer. For measurement of painting items the area painted shall be considered without any multiplication factor for different kinds of surfaces painted. Rate shall be quoted accordingly. All painting items final finish shall be as per manufacturer'sspecification as per acceptance of Engineer in charge /Architect. No extra payment shall be made for extra/over coat if required.The rate shall be inclusive of providing bamboo scaffoldingMake: Jotun,Asian Paints, Berger Paints, Dulux Paints or as approved by chief engineer. |
| 33 | Providing and Applying Lustre Paint with work includes providing and applying lustre finish paint on internal wall surfaces in required shade, complete as directed by the Engineer-in-Charge. The material shall be oil-modified or synthetic enamel-based washable lustre paint, with smooth sheen finish. The paint shall conform to Indian Standards IS: 101 (for testing of paint) and IS: 2932 (for enamel paints) or equivalent specifications. The brand and shade shall be approved before execution.The surface shall be properly cleaned by removing loose paint, dust, dirt, grease, algae and foreign matter. All cracks, dents and surface irregularities shall be filled using approved wall putty or plaster of Paris to make the surface even and smooth. The finished surface shall be prepared by rubbing with sandpaper and cleaned.The work shall include applying one coat of approved primer suitable for lustre paint system. After the primer dries, the surface shall again be smoothened by rubbing with sandpaper. A synthetic enamel undercoat or base coat shall then be applied as per the manufacturer’s recommendation. Finally, two coats of approved quality lustre paint shall be applied uniformly using brush or roller to achieve a smooth, even, washable finish free from brush marks, patches or streaks. Additional coats, if required for uniformity, shall be carried out by the contractor at no extra cost.All materials, labour, scaffolding, tools, masking tapes and necessary protection to electrical fixtures, flooring, furniture, windows and adjoining surfaces shall be included in the rate. After completion, stains shall be cleaned and the area handed over in proper condition.Measurement shall be taken in square metres of finished painted surface. The rate shall be inclusive of entire work including cleaning, surface preparation, primer, putty, undercoat, lustre paint, labour and all incidentals required to complete the work..Make: Jotun,Asian Paints, Berger Paints, Dulux Paints or as approved by chief engineer. Please Enable Macros to View BoQ information |
| 34 | Providing and Applying Lustre Paint with work includes providing and applying lustre finish paint on internal wall surfaces in required shade, complete as directed by the Engineer-in-Charge. The material shall be oil-modified or synthetic enamel-based washable lustre paint, with smooth sheen finish. The paint shall conform to Indian Standards IS: 101 (for testing of paint) and IS: 2932 (for enamel paints) or equivalent specifications. The brand and shade shall be approved before execution.The surface shall be properly cleaned by removing loose paint, dust, dirt, grease, algae and foreign matter. All cracks, dents and surface irregularities shall be filled using approved wall putty or plaster of Paris to make the surface even and smooth. The finished surface shall be prepared by rubbing with sandpaper and cleaned.The work shall include applying one coat of approved primer suitable for lustre paint system. After the primer dries, the surface shall again be smoothened by rubbing with sandpaper. A synthetic enamel undercoat or base coat shall then be applied as per the manufacturer’s recommendation. Finally, two coats of approved quality lustre paint shall be applied uniformly using brush or roller to achieve a smooth, even, washable finish free from brush marks, patches or streaks. Additional coats, if required for uniformity, shall be carried out by the contractor at no extra cost.All materials, labour, scaffolding, tools, masking tapes and necessary protection to electrical fixtures, flooring, furniture, windows and adjoining surfaces shall be included in the rate. After completion, stains shall be cleaned and the area handed over in proper condition.Measurement shall be taken in square metres of finished painted surface. The rate shall be inclusive of entire work including cleaning, surface preparation, primer, putty, undercoat, lustre paint, labour and all incidentals required to complete the work..Make: Jotun,Asian Paints, Berger Paints, Dulux Paints or as approved by chief engineer. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail