| 1 | Removing old lime or cement plaster from walls including raking out joints 12 mm. Deep (1/2) stackiong the useful materials for reuse and removing the debris within 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge.in Ground Floor |
| 2 | Removing old lime or cement plaster from walls including raking out joints 12 mm. Deep (1/2) stackiong the useful materials for reuse and removing the debris within 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge.(in First Floor) |
| 3 | Removing old lime or cement plaster from walls including raking out joints 12 mm. Deep (1/2) stackiong the useful materials for reuse and removing the debris within 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge.(inSecond Floor) |
| 4 | 16 mm thick cement plaster of proportion (1:6) finished smooth to inside brick work after racking out joints including watering and curing, cost, conveyance, royalities of all materials with all labour, labour cess and T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge (In ground floor) |
| 5 | 16 mm thick cement plaster of proportion (1:6) finished smooth to inside brick work after racking out joints including watering and curing, cost, conveyance, royalities of all materials with all labour, labour cess and T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge(In First Floor) |
| 6 | 16 mm thick cement plaster of proportion (1:6) finished smooth to inside brick work after racking out joints including watering and curing, cost, conveyance, royalities of all materials with all labour, labour cess and T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge (In Second Floor) |
| 7 | Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges up to 5m height with cost of all labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. |
| 8 | Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charges above 5m height and upto 8mtr height with cost of all labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. |
| 9 | Wall painting two coats to wall surface with any approved Plastic Emulsion paint of approved shade over a coat water bound cement primer on new work to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. (In Ground Floor) |
| 10 | Wall painting two coats to wall surface with any approved Plastic Emulsion paint of approved shade over a coat water bound cement primer on new work to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. (In First Floor) |
| 11 | Wall painting two coats to wall surface with any approved Plastic Emulsion paint of approved shade over a coat water bound cement primer on new work to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. (In Second Floor) |
| 12 | Dismantling and removing old Tiled flooring including removing the base course and stacking the useful materials for reuse and removing the debris within 50 m including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge. (In Ground Floor) |
| 13 | Dismantling and removing old Tiled flooring including removing the base course and stacking the useful materials for reuse and removing the debris within 50 m including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge. ( In First Floor) |
| 14 | Dismantling and removing old Tiled flooring including removing the base course and stacking the useful materials for reuse and removing the debris within 50 m including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge. ( In Second Floor) |
| 15 | Supplying, fitting and fixing of Vitrified tile in floors of size 600mm x 600mm of plain (Ivory) in approved make conforming to IS 13756 laid on 20mm thick cement mortar (1:4) (1cement:4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour, labour cess and T&P etc. required for the work all complete as per direction of the Engineer-in-charge. (In Ground Floor) |
| 16 | Supplying, fitting and fixing of Vitrified tile in floors of size 600mm x 600mm of plain (Ivory) in approved make conforming to IS 13756 laid on 20mm thick cement mortar (1:4) (1cement:4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour, labour cess and T&P etc. required for the work all complete as per direction of the Engineer-in-charge. (In First Floor) |
| 17 | Supplying, fitting and fixing of Vitrified tile in floors of size 600mm x 600mm of plain (Ivory) in approved make conforming to IS 13756 laid on 20mm thick cement mortar (1:4) (1cement:4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour, labour cess and T&P etc. required for the work all complete as per direction of the Engineer-in-charge. (In Second Floor) |
| 18 | Providing and fixing Vitrified tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles as directed by the Engineer-in-charge. (In Ground Floor) |
| 19 | Providing and fixing Vitrified tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles as directed by the Engineer-in-charge.(In First Floor) |
| 20 | Providing and fixing Vitrified tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles as directed by the Engineer-in-charge. (In Second Floor) |
| 21 | Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Ceosetory window s & other Frames/Chowkhat size 75mm X 45mm or 90mm X 50mm including 2 coats of Enamel paint and one coat of wood primer fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 750 kg/cum, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge) , minimum compressive strength of 58 N/mm2, modulus of elast icity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with m.s hold fast/ lugs/ SS dash fastner of required dia & length complete as per the direction of engineer-in-charge. |
| 22 | Providing and fixing of 30mm thick WPC Door shutter with hinges, tower bolt handle, stainless steel screws etc. including the cost of all materials, hardware fittings cost of all labour conveyance taxes loading unloading T&P etc. complete as per the direction of Engineer-in charge. |
| 23 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the materials for reuse and removing the debris within 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge. |
| 24 | Supplying and fitting fixing of Un-plasticised Poly vinyl chloride (UPVC) (FENESTA / NCL VEKA LTD) TwoTrack – Two Panel sliding window – 60 series duly manufactured using UPVC reinforced profiles of 108 mm X 45mm X 2.5mm for outer frames and window sash of 39mm X 58mm X 2.5mm capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.5 mm prefabricated and welded through fusion welding the window, frame shall be fitted with 6 mm thick clear toughened glass of SAINT – GOBAIN make duly fixed with EPDM weathering seal resistant and the system is to be installed using Reinforced Large Coupler at the site using anchor fasteners , silicon rubber sealant, easy glazing/ deglazing at site etc. including cost and conveyance of all materials, accessories, labour charges, materials and product conforming to ASTM D 638-14, EN-477-95 and other applicable codes and standards. |
| 25 | Supplying, fitting & fixing in all floors of M.S. grills, grill gates, M.S. gates, garage door, collapsible gates with top and bottom rails, steel windows, critical frames for windows, stair case and parapet railing made out of M.S Square bar/ flat including stair case hand railing with 40mm. dia G.I.pipe etc. including painting two coats over a coat of redoxide primer as per approved drawing and design with cost of all materials & labour, labour cess, T&P, sundries etc. complete in all respect as per specification & direction of the Engineer-in-Charge. |
| 26 | Painting two coats with any approved enamel paint over a coat of priming to new iron work including cost of the primer and paint sand papering polishing the surface with cost conveyance of all materials, labour and labour cess with T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge. (In Ground Floor) |
| 27 | Painting two coats with any approved enamel paint over a coat of priming to new iron work including cost of the primer and paint sand papering polishing the surface with cost conveyance of all materials, labour and labour cess with T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge. (In First Floor) |
| 28 | Painting two coats with any approved enamel paint over a coat of priming to new iron work including cost of the primer and paint sand papering polishing the surface with cost conveyance of all materials, labour and labour cess with T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge. (In Second Floor) |
| 29 | Supplying, fitting and fixing Granite tiles of size above 0.40sqm. (20mm thick) in floors on 20 mm thick cement mortar (1:4) (1 cement :4 coarse sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of E.I.C. |
| 30 | Wall Painting two coats with any approved weather coat paint of approved shade over a coat water bound wall cement primer on new work to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. ( In Ground Floor) |
| 31 | Wall Painting two coats with any approved weather coat paint of approved shade over a coat water bound wall cement primer on new work to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. (In First Floor) |
| 32 | Wall Painting two coats with any approved weather coat paint of approved shade over a coat water bound wall cement primer on new work to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. (In Second Floor) Please Enable Macros to View BoQ information |