| 1 | Dismantling asbestos cement corrugated/ semi corrugated/ plain sheets as in roof covering, making good the disturbed portion in CM 1:6 and filling holes if any with PCC 1:2:4 type B0 (using 12.5mm graded crushed stone aggregate) incl necessary formwork complete all as specifeid and directed. |
| 2 | M&L Pre-painted galvalume aluminium zinc coating GI based corrugated steel sheet 0.5mm thick of any colour having tensile strength of 550 Mpa as in roof covering/cladding to wall,fixed with self tapping screws as specified. |
| 3 | M&L for pre painted galvalume aluminium zinc coating GI based Plain steel sheet 0.50 mm thick of any colour having tensile strength of 550 Mpa as in roof covering / cladding to wall, fixed with self tapping screws as specified all as specified. |
| 4 | Dismantling of wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness, including cover fillets |
| 5 | S&F, GI powder coated snap grid of sizes 605 mm x 605 mm frame work for false ceiling with main tee 32x24x1mm thick, cross tee 26x24x1mm thick and wall angle 24x24x1mm thick, flange covered with PVC thin sheet including gypsum board 7-9 mm thick, duly finished surface (thin PVC layer on gypsum board as per manufacturer instructions) size 600mm x 600mm and the same to be placed in snap grid as in false ceiling and Hangers 6mm dia GI (upto 1200mm length) adjusting level fixed to roof slabs by means of ceiling cleats made out of GI flat 40x3mm size 60mm long and expansion hold fasteners 12.5mm dia. 40mm long complete all as specified. |
| 6 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed |
| 7 | Erection and Fixing Rolled Mild steel work in tubular Roof trusses (framed), trussed, purlins, crane gantries, rails andfastenings and heavy bracketframing (Beam, tee, angle, channel or flat sections) including distance pieces, cleats etc NOTE : Material obtained from Item No 6 above to be used |
| 8 | S&F Rolled Mild steel work in tubular Roof trusses (framed), trussed, purlins, crane gantries, rails andfastenings and heavy bracketframing (Beam, tee, angle, channel or flat sections) including distance pieces, cleats etc |
| 9 | M&L preparation of new or previously untreated steel surface of any description not otherwise described over 10 cm width or girth and applying two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and directed. |
| 10 | Taking down carefully copper/aluminum point wiring (light/fan/socket or power) complete including taking out existing unserviceable terminal boxes & conduit with switches/sockets/fan regulators and fittings such as ceiling rose, pendants, tube light fittings, lamp holders, brackets light fittings, rectangular blocks etc. and making good disturbed surface of walls, floors etc. to match with the existing surface etc complete all as specified and directed. |
| 11 | M&L for point wiring for one light point controlled by one, one way switch with 1.50 Sqmm single core PVC insulated and unsheathed multistranded copper conductor FRLS cable 1100 Volt grade including 1.50 Sqmm single core PVC insulated and unsheathed multistranded copper conductor FRLS cable 1100 Volt grade as continuous earth wire in green colour to common earth and connected to earth dolly laid/drawn into and including concealed PVC rigid non metallic conduit 20mm dia medium grade (ISI marked) with all fittings such as tees, bends etc including modular press steel with cover plate and frame, complete, all as specified & directed. |
| 12 | All as per item No. 11 (here-in-before) but one Fan/exhaust fan point controlled by one Number one way switch complete all as specified and directed |
| 13 | All as per item No.11 (here-in-before) but for one 6 Amp socket outlet on independent board controlled by one Number one way switch on independent board. |
| 14 | All as per item No. 11 (here-in-before) but for one 6 Amp socket outlet on the same board controlled by one Number one way switch on same board. |
| 15 | All as per srl item No. 11 (here-in-before) but for 16 Amp socket out let by using 2.50 sqmm PVC insulated unsheathed copper conductor cable FRLS multi strand on independent board including provn of 2.50 Sqmm unsheathed, multi stranded copper conductor cable FRLS continues as earth wire connected to earth dolly etc complete all as specified and directed. |
| 16 | S&F modular type switch piano, flush type, single pole, one way 6 Amp 230 Volts all as specified & directed |
| 17 | S&F modular type switch piano flush type, single pole, one way 16 Amp 230 Volts. |
| 18 | S&F modular type socket outlet multipurpose 3 Pin 6 Amp 230 volts AC complete all as specified and directed. |
| 19 | S&F modular type socket outlet multipurpose 3 Pin 16 Amp 230 volts AC complete all as specified and directed. |
| 20 | S&F ceiling rose surface bakelite 65mm x 50mm, 3 terminals with back plate etc complete all as specified and directed. |
| 21 | S&F in repair of modular type ceiling fan regulator electronic step type of suitable wattage, 230V suitable for 1200/1400 mm ceiling fan etc complete all as specified and directed. |
| 22 | S&F LED light fitting 1x40W, regal batten for LED including ultra bright glass LED Tubelight with very high efficacy, single / double side connection all as specified and directed. |
| 23 | S&F lamp holder, insluated body, with back plate suitable for batten fittings & complete all as specified & directed. |
| 24 | S&F in repair of MCB single pole, 240 volts, 10 Amps to 32 Amp breaking capacity 10KA complete all as specified and directed. |
| 25 | S&F in repair of MCB SPN, 240 Volts, 40-63 Amps breaking capacity 10 KA complete all as specified and directed. |
| 26 | S&F in repair of sheet metal enclosure MCB DB SPN 8 way with 200 amps rated bus bar 240 volts double door with isolated Neutral Bar & Shrouded bus bar IP protection 43 having door earthing complete all as specified and directed. |
| 27 | S&F in repair of MCB TPN, 240 Volts,100 Amps breaking capacity 10 KA complete all as specified and directed. |
| 28 | S&F in repair of sheet metal enclosure distribution board TPN 4 way double door powder coated, protection class IP-42, suitable for mounting MCB,DBs confirming to IS-13032,IS-8632, BS-5484 with min 200 amps rating copper bus bar, complete all as specified and directed. |
| 29 | S&F sub main wiring using two single core 4 sqmm FRLS PVC insulated and unsheathed cable with copper conductor 1100 volts grade ISI marked drawing PVC conduit (as required & directed by Engr-in-Charge) accessories like bends, tee, etc. and connecting to earth dolly and including 6.0 sqmm earth wire, PVC insulated & unsheathed all as directed. |
| 30 | Taking down fan, sealing cable end, down rod, dismantling blades and removing fan and blades to store for Re-Use and complete all as specified and directed by Engr-in- Charge. |
| 31 | M&L for Painting of ceiling fans complete, in situ with synthetic enamel paint by spraying including filling cavities with filler, one coat after cleaning all dust etc and complete all as specified and directed by Engr-in- Charge. |
| 32 | Fixing or Hanging only ceiling fan with down rod suitable for ceiling fans for extension from ceiling of 1meter length and connecting up including provision of cable from ceiling rose or connector to fan and complete all as specified and directed by Engr-in- Charge. |
| 33 | S&F LED luminaire 600 mm x 600 mm, 35/36 watt, 220 V AC recessed type with high efficiency PMMA diffuser soft glare free light complete with driver, holders & LED lamp suitable for roof ceiling inclu ing connecting up with driver three core flexible copper conductor cases of suitable size complete. General Notes : 1. Immediately after commencement of work contractor has to deploy his authorised agent at site for measurement of quantities required for each phase for roof sheeting and false ceiling alongwith Engineer-in -Charge/JE. Total material required in each phase as verified at site shall be procured by contractor & the same shall be intimated to GE & CWE for verification before incorporation in the work.2. Preparatory work shall commence immediately after handing over of site.3. Contractor shall ensure that fixing of roof sheet is done immediately after removal of old sheet to avoid any damage due to any adverse weather. Please Enable Macros to View BoQ information |