|
| 1 | Design, detail engineering, manufacturing/packaging, assembly, calibration of instruments, factory testing/inspection, supply of skid mounted DRS including packaging, insurance, handling, transportation, loading/unloading at MNGL Stores/sites, erection including transportation of DRS from MNGL’s stores to designated site, hookup with existing pipeline, performance testing, all related services including configuration of instruments, site acceptance testing, trial run and commissioning along with all accessories, consumables & commissioning spares as per Material Requisition and specifications and training on Operation & Maintenance of MNGL O&M Staff on DRS including supply of other mandatory spares like Integral PCV/SSV Springs, Diaphragm for Integral PCV / SSV, etc., as per tender terms & conditions. |
| 2 | 5000 SCMH (150#) TWIN STREAM SMART DRSDRS with USM at downstream of regulator with 10-19 bar inlet & 4 bar outlet pressure. |
| 3 | CO2 Fooding System for 5000 SCMH (150#) TWIN STREAM SMART DRS. |
| 4 | Supervision during Installation, Testing and Commissioning of 5000 SCMH (150#) TWIN STREAM SMART DRS. |
| 5 | Design, detail engineering, manufacturing/packaging, assembly, calibration of instruments, factory testing/inspection, supply of skid mounted DRS including packaging, insurance, handling, transportation, loading/unloading at MNGL Stores/sites, erection including transportation of DRS from MNGL’s stores to designated site, hookup with existing pipeline, performance testing, all related services including configuration of instruments, site acceptance testing, trial run and commissioning along with all accessories, consumables & commissioning spares as per Material Requisition and specifications and training on Operation & Maintenance of MNGL O&M Staff on DRS including supply of other mandatory spares like Integral PCV/SSV Springs, Diaphragm for Integral PCV / SSV, etc., as per tender terms & conditions. |
| 6 | 5000 SCMH (300#) TWIN STREAM SMART DRSDRS with USM at downstream of regulator with 12-49 bar inlet & 4 bar outlet pressure. |
| 7 | CO2 Fooding System for 5000 SCMH (300#) TWIN STREAM SMART DRS. |
| 8 | Supervision during Installation, Testing and Commissioning of 5000 SCMH (300#) TWIN STREAM SMART DRS. |
| 9 | Design, detail engineering, manufacturing/packaging, assembly, calibration of instruments, factory testing/inspection, supply of skid mounted DRS including packaging, insurance, handling, transportation, loading/unloading at MNGL Stores/sites, erection including transportation of DRS from MNGL’s stores to designated site, hookup with existing pipeline, performance testing, all related services including configuration of instruments, site acceptance testing, trial run and commissioning along with all accessories, consumables & commissioning spares as per Material Requisition and specifications and training on Operation & Maintenance of MNGL O&M Staff on DRS including supply of other mandatory spares like Integral PCV/SSV Springs, Diaphragm for Integral PCV / SSV, etc., as per tender terms & conditions. |
| 10 | 10000 SCMH (300#) TWIN STREAM SMART DRSDRS with USM at downstream of regulator with 12-49 bar inlet & 4 bar outlet pressure. |
| 11 | CO2 Fooding System for 10000 SCMH (300#) TWIN STREAM SMART DRS. |
| 12 | Supervision during Installation, Testing and Commissioning of 10000 SCMH (300#) TWIN STREAM SMART DRS. Please Enable Macros to View BoQ information |