| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) |
| 2 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge. 25 mm average thickness |
| 3 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.110 mm diameter |
| 4 | Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. (1) Single tee with Door 110x110X110 mm |
| 5 | Single without Door110x110X110 mm |
| 6 | Bend 87.5 110mm bend |
| 7 | Providing and applying waterproofing treatment to sound, moisture free concrete surface using liquid applied single component pitch free polyurethane coating capable of bridging substrate cracks up to 2mm. It shall be applied in two coats at coverage rate of 2kg/sqm to a achieve a minimum DFT of 1.3 mm. the membrane formed shall confirm to following minimum properties : 1. Elongation : 400% as per ASTM D 4122. Tensile Strength : 2.5N/mm 2 as per ASTM D 4123. Adhesion in –peel test : 50 N as per ASTM C-8364. Recovery from 350% elongation : 95% as per ASTM D 4125. Water Vapor Transmission 2.3mm film : 0.6 g/m2/hr6. Initial Hardness Shore A : min 60 as per ASTM D 22407. Root resistant : Protection screed requiredSystem included supply, application and termination of coating all complete as per the manufacturer methodology.Clean the RCC slab/screed surface & wall for treatment by removing dust, dirt and layers of concrete over the surface etc. by mechanical tools and wire brushing. Pressure grouting at construction joints or honeycombs with non shrink cementations grout by mixing shrinkage compensating admixture per bag of cement as per manufactures’ recommendations. Providing and apply in liquid applied single component pitch free polyurethane coating in 2 coats at coverage rate of 2kg/sqm to a achieve a minimum DFT of 1.3 mm. (Fiber cloth…./reinforcement should not be used in between two coats of PU as it has adverse effect on elongation property and also affects bonding with slab). Termination shall be done 300 mm above vertical wall by providing groove cut of 30mm x 30mm & seal it with shrinkage compensated polymer modified mortar. Membrane shall be protected using 8mm thick dimple board for protection as per manufacture’s recommendation followed by backfilling. The rates are inclusive of surface preparation, crack filling, injection grouting at honeycombed areas, coving, priming all complete as per manufacturer methodology excluding the cost of protection board. |
| 8 | Grading roof for water proofing treatment withCement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) |
| 9 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete. |
| 10 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect. Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make |
| 11 | Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge.Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2). 12 mm average thickness . |
| 12 | Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical means, including loading ,transporting and unloading the same at any C&D waste management site within 25 kms lead i.e. Shastri park/ Burari/ Mundka including weighing at plant etc complete as per direction of Engineer in charge. Weighing and unloading at plant shall be as per procedures/rules of the plant management. The rates are inclusive of all operations, labours, lead and lifts from site of work to the C&D waste plant. The processing fee of C&D management at prescribed rates will be deposited by the agency and the same shall be reimbursed by department on production of only original cash receipts. Please Enable Macros to View BoQ information |