| 1 | Shifting of main tank of 63 MVA T/F from unloading point to T/F plinth (approximate upto 40mtr.) |
| 2 | Additional shifting of 10 meter on all part there (63 MVA T/F main tank) |
| 3 | Complete erection of 63 MVA T/F by erection of radiators, conservator tank, HV/LV/N bushing and its turrets, connecting all pipe lines erection of fans, control cables, motor drive mechanism of RTCC panel, cooling fans etc and all other associated work for satisfactorily completion of work |
| 4 | Filing of Transformer oil from oil drums to main tank of 63 MVA T/F |
| 5 | Centrifuging of complete Transformer oil in main tank of the Transformer taking the IR/BDV value of Transformer oil at an interval of 4 Hrs as per norms till the desired valve of BDV/PPM are obtained (Centrifuging machine along with operator shall be arranged by the contractor at his own cost) |
| 6 | Erection of RTCC panel of 63 MVA T/F in control room . The job includes its fitting, cutting & earthing etc. |
| 7 | Laying of control cable for New 63 MVA T/F, OLTC, RTCC, control/relay panel, 132/33 KV CB, 132/33 KV CT, 132 KV BI and new 33 KV Bay etc. |
| 8 | 2Cx2.5 sqmm |
| 9 | 4Cx2.5 sqmm |
| 10 | 6Cx2.5 sqmm |
| 11 | 10Cx2.5 sqmm |
| 12 | Termination of cable connections in cooling fans/ RTCC/Marshelling box including re-dressing/ferruling etc as per drawing. |
| 13 | Earthing of 63 MVA 132/33 KV Transformer body, MB, OLTC, RTCC with 75X10mm, 50x6mm MS flat as per required and its joining with already laid earth mat at 2 places with necessary modification in existing support structure for earthing green colour in two coats and complete all other associated work satisfactory. (MS flat and angle will be provided by the departmetnt). |
| 14 | Making Delta earthing with 03mtr long electrodes which is to be provided by department and connecting with neutral of 63 MVA T/F and green bus painting of MS flat size 75mmx10mm (each for HV & LV Neutral) |
| 15 | Making Delta earthing of 120 KV LA consisting of 03 mtr. long electrodes which is to be fabricated and piercing inside the ground and connecting all the electrodes with 75mmx10mm MS flat below 700mm from ground level including excavation of earth/RCC floor. |
| 16 | Making Delta earthing of 30 KV LA consisting of 03 mtr. long electrodes which is to be fabricated and piercing inside the ground and connecting all the electrodes with 75mmx10mm MS flat below 700mm from ground level including excavation of earth/RCC floor. |
| 17 | Following test to be performed for insulating oil testing of T/F after centrifuging of oil. (i) Break down voltage (BDV) (ii) Water content (PPM) (iii) Disolved gas analysis (DGA). Report of testing results to be submitted in hard copy to EE and SDO office. |
| 18 | Erection of following equipments/substation structures at 132 KV substation Azadnagar, Kanpur. The job includes all other associated works to complete the job satisfactorily as per instruction manual, job also includes fabrication and earthing if required or as per the direction by the supervising engineer. |
| 19 | Main and auxilary structrure |
| 20 | 63 MVA Transformer control panel & Relay panel |
| 21 | 145 KV CT with junction box |
| 22 | 145 KV CB with structure |
| 23 | 145 KV Bus Isolator (with post insulator) |
| 24 | 145 KV PT including connecting jumper from 132 KV main bus |
| 25 | 145 KV PT Junction box |
| 26 | 120 KV LA |
| 27 | 36 KV CT with junction box |
| 28 | 36 KV CB with structure |
| 29 | 36 KV Bus isolator/Section isolator/Line isolator |
| 30 | 36 KV PT with junction box |
| 31 | 30 KV LA |
| 32 | Earthing of all equipments with different size MS flat provided by UPPTCL. |
| 33 | Earthing by 75x10mm MS flat |
| 34 | Earthing by 50x6mm MS flat |
| 35 | Earthing by 25x6mm MS flat |
| 36 | Painting of M.S. flat 75x10mm, 50x6mm, 25x6mm by one coat red oxide and two coat bus green colour enamel paint after cleaning work. |
| 37 | Complete termination of Transformer HV side, LV side and 33 KV new bay (CB, CT) with proper dressing of control cable at both ends as per cable schedule including making necessary hole in the gland plate at box where required including all associated works like providing ferules, lugs, etc. |
| 38 | Jumpering of 132 KV bay including main bus with zebra/moose/panther conductor with the help of PG clamps/connectors to BI, CB, CT,LA and bushing.The job includes cutting, measuring strengthening and all other associatec work to complete the job satisfacrorily. |
| 39 | Jumpering of 33 KV bay including main bus with tarantulla/zebra/panther conductor with the help of PG clamps/connectors to BI, CB, CT,LA and bushing.The job includes cutting, measuring strengthening and all other associated work to complete the job satisfacrorily. |
| 40 | Destringing of 132 KV main bus R,Y & B phase with using single moose/zebra conductor (every phase length approximate 30 mtr.) along with 03 nos. connected isolator jumper including opening of gun fitting etc. including shifting of dismantled material upto S/S store during arrange shutdown period. |
| 41 | Stringing of 132 KV main bus R,Y & B phase with using single moose conductor (every phase length approximate 12 mtr.) cutting, bending & gun fitting and connected to 03 nos. isolator jumper which are connected from 132 KV main bus at 132 KV S/S Azadnagar to complete the work during arrange shutdown period. |
| 42 | Jumpering of 132 KV Bus isolator (R,Y & Bph) with using suspension string which are connected to 132 KV Bus after dismantling of old jumper at 132 KV S/S Azadnagar to complete the work during arrange shutdown period. |
| 43 | Jumpering of 132 KV New Bus isolator (R,Y & Bph) with using PI as per site required after dismantling of old jumper from 132 KV Bus to CB at 132 KV S/S Azadnagar to complete the work during arrange shutdown period. |
| 44 | Loading, unloading and carriage of different materials (MS round bar, MS flat, CT,CB ,BI etc) from various substations under ETC-I Kanpur and ETC-II Kanpur to 132 KV Substation Azadnagar, Kanpur (approximate-200Km) under ETD-I Kanpur with the help of skilled labour and T&P. |
| 45 | Loading of Main and Auxilary structures (approximate 15MT) after stacking and checking in private vehcile at EFU Naini, Allahabad and unloading to 132 KV Substation Azadnagar, under ETD-I Kanpur with the help of skilled labour abd T&P. |
| 46 | Safe carriage of Main and Auxilary structures from EFU naini Allahabad to 132 KV Substation Azadnagar Kanpur under ETD-I Kanpur. |
| 47 | Fixing, Installation and earthing of new LT ACDB ( 3 phase 415 V AC Distribution board indoor type) as per direction of supervisor/engineer and all associated works for 132 KV Substation Azadnagar, Kanpur under ETD-I Kanpur. |
| 48 | Laying of power cable size (3.5x95sqmm) approximate 55mtr suitable for outdoor 132 KV side old ACDB to 3 phase 415 V AC Distribution board indoor ype . The job including excavation of earth size of 150x500mm for making trench with digging of soil (as per site requirment) and proper laying inside cable trench with the help of clamping & connecting of cement, brick and sand work. |
| 49 | Laying of power cable size (3.5x95sqmm) approximate 50mtr suitable for outdoor 132 KV side old ACDB to 33 KV side outdoor old ACDB . The job including excavation of earth size of 150x500mm for making trench with digging of soil (as per site requirment) and proper laying inside cable trench with the help of clamping & connecting of cement, brick and sand work. |
| 50 | Laying of power cable size (3.5x300sqmm) approximate 100mtr suitable for 33/0.4 KV station transformer to3 phase 415 V AC Distribution board indoor type . The job including excavation of earth size of 150x500mm for making trench with digging of soil (as per site requirment) and proper laying inside cable trench with the help of clamping & connecting of cement, brick and sand work. |
| 51 | Termination work both side of power cable (size 3.5x95 sq mm) and control cable for above 02 Nos. AC cubical box as per site requirement with punching proper size of Aluminium lugs of dowell/Jackson make (lugs will be provided by contractor) and earthing work of above AC cubicle box with MS flat as per site requirement. . The job including laying of control cable different equipment light, T/F fan, compressers, C.B's etc. from 2 Nos. AC cubicle box) and all other associated works to complete the job (control cable & MS flat provided by department). |
| 52 | Erection of 250 KVA, 33/0.4 KV Transformer including shifting of T/F and connecting of jumper with the help of connector & proper earthing of T/F and connecting of power cable (3.5x300sqmm) for LV terminal and 3 phase 415 V AC Distribution board indoor type including punching proper size of aluminium lugs (lugs will be provided by contractor) etc work which are installed at control room and all other associated work to complete the job satisfactorily. |
| 53 | Modification of various type substatio structure of 75mm long cleat with 50x6mm Angel & welding at cross joints including cost of all material, including cutting, welding, labour and T&P etc. |
| 54 | Laying of 40/36mm dia M.S. round bar as per available of department 600mm below ground level including cutting, strenthening, welding & painting at joints and connecting the substation grid after execavation of trench its back filling and all other associated work to complete the work satisfactory as per technical specification. |
| 55 | Fabrication of 3mtr long electrode with 40mm dia round bar having 150mm long conical shape as per available of department and then it piercing vertically inside the ground with top 500mm below ground level and its connecting and welding with substation grid earthmat, excluding the cost of MS bar as per technical specification. |
| 56 | Fabrication of 75mm long cleat with 50x6mm angle and welding at cross joints with paint including cost of all material including cutting, welding, labour and T&P etc. |
| 57 | Making Delta earthing of 30 KV LA consisting of 03 mtr. long electrodes which is to be fabricated and piercing inside the ground and connecting all the electrodes with 75mmx10mm MS flat below 700mm from ground level including excavation of earth/RCC floor. |
| 58 | Stringing of 33 KV main bus by using Taramtulla/zebra/moose conductor, cutting, bending & gun fitiing for main bus at 132 KV Azadnagar, Kanpur to complete the work during arranged S/D period (Required conductor and clamps provided by department). |
| 59 | Dismantling of following equipment/structure as per instruction manual and technical specification including cutting of earthing MS flat and shifting of material up to site of work including all associated work to complete the job. |
| 60 | Main and auxilary structrure |
| 61 | 03 nos. 33 KV CT and junction box with structure |
| 62 | 33 KV Line isolator with structure |
| 63 | 33 KV Bus isolator with structure |
| 64 | 03 Nos. 36 KV PT with structure |
| 65 | 33 KV CB with structure |
| 66 | 145 KV PT with structure including opening of jumper from 132 KV main bus |
| 67 | Providing and fixing of 63 MVA T/F and 33 KV bay name plate of 2 mm thick alluminium sheet plate size 400x200mm with covering retro reflecting sheet base yellow colour and write feeder name plate per equipments. |
| 68 | Providing and fitting of new generation energy & environment friendly long aluminium outdoor beam street light with high power 120 watt LEDs as light source & exclusively designed polycarbonate cover along with electronic driver complete fitting suitable for 230 volt AC input supply of CGL/Havells/Surya/Philips/Bajaj etc including wiring from junction box to light fitting point and checking of healthiness of LEDs light. |
| 69 | Laying of 2, 4x2.5 sqmm PVC control cable for periphery lighting the job also including the excavation for trench and below 0.5mtr. and laid the cable in the trench and filling the sand on the cable then covering the same by using first class brick and after then filling of the trenches. (control cable provided by department) |
| 70 | Fixing of 6, 10, 25 amp. Single phase MCB in lighting cubical/ junction box. The job includes proper wiring work etc. including cost of all material labour T&P etc. for proper completion of work. |
| 71 | Providing & fixing of double door type junction box MCB type with the structure for cable lighting termination work. |
| 72 | Fixing, Installation, termination and earthing of Outdoor type 3 phase AC cubical box for connecting ACDB after dismantling of old ACDB (which are installed in switch yard) as per direction of supervisor/engineer and all associated works for 132 KV Substation Azadnagar, Kanpur under ETD-I Kanpur. |
| 73 | Providing and fixing of Updated single line diagram of PVC sheet of size 4x6 feet of complete 132/33 KV switchyard of 132 KV S/S Azadnagar, Kanpur as per instruction by concerning JE/SDO |
| 74 | Providing and fixing of 2 Ton O-General/Voltas make window type air conditioners in window. |
| 75 | Providing and fixing of stablizer 5 KVA single phase having copper wound of blue world/logic star/guard make ISI mark. |
| 76 | Cutting of wooden window for fitting 2 Ton window AC (make O-Genral/voltas) of suitable size. The job includes making and fixing of wooden frame on the window properly after mounting AC and painting of above ac window from by one coat red oxide paint and two coat creame colour enamled paint after cleaning work including cost of all material laobour T&P etc. |
| 77 | Providing and fixing of AC box with MCB rating 25 Amp 230Volt on the wall for the ac power supply including cost of material. |
| 78 | Wiring for window AC by 2X4 mm copper wire with fixing of PVC strips on the wall as per site requirement including cost of wire and PVC strips. |
| 79 | Providing, fixing and replacement of hose box for fire hydrant system size 600x600x250mm hose box of 20 SWG MS sheet having glass window on front side of the box and painted with post office red colour enamel paint inside the box. |
| 80 | Making foundation and grouting of M.S. pipe for hose box. All the materials shall be arranged by the agency only desired M.S. pipe provided by department . |
| 81 | Obtaining No Objection Certificate from office of Electrical safety Directorate, Lucknow for first time energisation of 63 MVA 132/33 KV Transformer (including payment of fee as per challan) |
| 82 | Supply of Materials (all material provided by contractor as per sample) |
| 83 | Single suspesion fitting for ACSR Panther |
| 84 | Single tension fitting suitable for AAC Tarantulla |
| 85 | Single tension fitting suitable for ACSR Zebra |
| 86 | PG clamps suitable for Tarantulla/Panther |
| 87 | PG clamps suitable for Zebra/Panther |
| 88 | PG clamps suitable for Panther/Panther |
| 89 | 145 KV PT clamps suitable for ACSR Panther |
| 90 | 145 KV CT clamps suitable for ACSR Panther |
| 91 | 145 KV BI clamps suitable for ACSR Panther |
| 92 | 36 KV CT terminal connectors for ACSR panther |
| 93 | 36 KV Bus Isolator Terminal connector for ACSR Tarantulla |
| 94 | 36 KV PT clamp for ACSR Panther |
| 95 | 36 KV PT clamp for ACSR Panther |
| 96 | 36 KV Jaw suitable for 2000A |
| 97 | 36 KV Jaw suitable for 1250A |
| 98 | Portable discharge earthing rod of F-class insulation suitable for working on transmission network having system voltage 132/33 KV (CPRI Type Tested) with total length of 7.20 meter & consisting of following items in each set. (a) Earthing pole in 4 sections of length 1.8 mtr duly made of FRP. The dia of all four poles will be 50mm & innner dia 45mm, shall be connected with overlapping with inner FRP pipe between two section. (b) Spring loaded type line earthing clamp made of electrolitic copper duly crome pated & other parts such as nut,bolts and washers shall be made of stainless steel suitable for ACSR moose/zebra/panther and fitted on top section of the earthing pole. (c) Earthing cable 25 meter long duly made of PVC insulated 5 mm sq.size multi strands flexible copper cable with lugs etc. pressed at both end fitting with earthing pad.(d) Canvas carry bag for the above. |
| 99 | Portable AFF mechanical foam type fire extinguisher complete with intial charge hose pipe and all other accessories and fittings as per IS1024 trolly/wheel mounted 45/50 Ltr. Capacity (Agni/Safepro/Finish/fire/Kanex make) |
| 100 | CO2 type fire extinguisher 22.5 Kg. Capacity trolley mounted along with accessories as per IS 2878/1986 and as per technical specification (Agni/Safepro/Finish/fire/Kanex make) |
| 101 | Copper Bond |
| 102 | GI Nut bolts with washer suitable size (10x62)mm |
| 103 | 1-Note- All T&P and crane along with operator, cable glands, ferules, lugs etc required to complete the job shall be arrange by the contractor at his own cost. |
| 104 | 2-Note All associated works required to complete the job satisfactorily shall be done by the contractor. Please Enable Macros to View BoQ information |