| 1 | Supply of Decentralized material as per UPCL Norms. |
| 2 | LT Bare N. Conn. PG Clamp L-L 120-120mm² |
| 3 | LT CLAMP FOR PCC POLE WITH N&B |
| 4 | STAY CLAMP WITH N&B PCC POLE 8.5MTR |
| 5 | SUSPENSION CLAMP EYE HOOK LT ABC CABLE |
| 6 | LT CLAMPS FOR DISTRIBUTION BOX |
| 7 | Shackle Insulator |
| 8 | STAY INSULATOR 100X115 |
| 9 | LT Distribution Box |
| 10 | PRC 120-120 |
| 11 | AL. CRIMPING TYPE LUGS 120 SQ.mm |
| 12 | DEAD END CLAMP WITH NUT & BOLTS |
| 13 | Following work as per UPCL norms & site requirement. |
| 14 | EXCAVATION OF PIT FOR STAY SET |
| 15 | ERECTION OF LT STAY SET |
| 16 | GROUTING OF STAY SET |
| 17 | EXCAVATION OF PIT FOR POLE |
| 18 | ERECTION OF SINGLE PCC POLE |
| 19 | DISMANTLING OF LT LINE 1 P 2 W(WEASEL) |
| 20 | DISMANTLING OF LT LINE 3 P 4 W(WEASEL) |
| 21 | LAYING OF 3P 4W LT LINE (WEASEL) |
| 22 | LAYING OF 1P 2W LT LINE(WEASEL) |
| 23 | CARTAGE PCC POLE, 21-50 KM |
| 24 | CARTAGE OF PETTY MATERIAL,21-50KM |
| 25 | HEADLOAD CARTAGE PCC POLE(1-3 KM) |
| 26 | DISCONNECTION & RECONNECTION OF CONSUMER |
| 27 | REALIGNMENT OF TILTED POLE |
| 28 | SUPPLY AND FIXING 3PH. DISTRIBUTION BOX |
| 29 | INSTALLATION OF 120 SQ. MM LT AL LUGS |
| 30 | FIXING OF PG CLAMP 120-120 SQMM |
| 31 | DISMANTALING & REJUMPERING OF CONDUCTOR |
| 32 | SUPPLY & FIXING 1PH. LT DISTRIBUTION BOX |
| 33 | LAYING/ERECTION & COMM. LT AB 3X120+95SQ Please Enable Macros to View BoQ information |