|
| 1 | M&L for complete removal of existing treatment on ceiling and applying two coats of OBD over a coat of primer complete all as specified and as directed by Engineer-in-Charge. |
| 2 | M&L for applying 2 mm thick wall care putty on ceiling/wall complete all as specified |
| 3 | Preparation of old decorated plastered surfaces of walls and applying one coat of oil bound distemper complete all as specified and as directed by Engineer-in-Charge. |
| 4 | M&L for complete removal of existing treatment on wall and applying two coats of oil bound distemper over a coat of primer complete all as specified and as directed by Engineer-in-Charge. |
| 5 | Preparation of old decorated plastered surfaces of walls and applying one coat of cement base paint complete all as specified and as directed by Engineer-in-Charge. |
| 6 | Taking down cement or cement lime plaster, any description on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc |
| 7 | M&L Rendering 15mm thick Cement plaster 1:4 on fair faces of brick work or concrete sur faces finished even and smooth (without using extra lime or cement) complete all as specified and directed by Engr-in-charge. |
| 8 | Preparation of new plastered surfaces of walls Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces |
| 9 | M&L Rendering 10 mm thick Cement plaster 1:6 on fair faces of brick work or concrete sur faces rendering is to be finished even and smooth (without using extra lime or cement) complete all as specified and directed by Engr-in-charge. |
| 10 | M&L Preparation of new plastered surfaces of walls and applying two coat of OBD white or tinted on walls over a coat of chalk whiting on plastered surfaces ,preparatory to distempering complete all as specified and as directed by Engineer-in-Charge. |
| 11 | M&L for complete removal of existing treatment on wall Two or more coats applied @1.43 ltr/10 sqm of Premium Acrylic Smooth exterior paint with Silicone additives of required shade, over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm complete all as specified and as directed by Engineer-in-Charge. |
| 12 | Preparation of old painted wooden surfaces of any description exceeding 10 cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed by Engineer-in-Charge. |
| 13 | M&L for French polishing on wooden surfaces of any description, width or girth, cleaning & preparation of surfaces, applying wood filler putty to fill depressions and applying two or more coats of polish until glossy look is achieved complete all as specified and as directed by Engr-in-Charge. |
| 14 | Preparation of old painted steel surfaces of any description over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed by the Engineer-in-Charge. |
| 15 | Preparation of old painted surfaces of brick/stone/concrete/floor/asbestos cement/plastered surfaces of any description over 10cm girth or width not otherwise described and applying one coat of synthetic enamel paint complete all as specified and as directed by Engineer-in-Charge. |
| 16 | Preparation of old painted surfaces of brick/stone/concrete/floor/asbestos cement/plastered surfaces of any description over 10cm girth or width not otherwise described and applying one coat of Terracotta exterior emulsion paint complete all as specified and as directed by Engineer-in-Charge.Note for all items mentioned here in before : It is informed that the material incorporated in this work shall be purchased by contractor before starting of work at site as per make approved by GE. At least 75% of total material will be deposited to the custody of Engineer-in-charge and will be opened at the presence of Engineer-in-charge or the rap of EIC. This aspect shall be monitored by EIC. The purchase voucher of the same shall be kept on record duly defaced. Please Enable Macros to View BoQ information |