| 1 | Supply, Installation & Commissioning of 1000 KVA Transformer 11 KV/440V, Three phase Copper wound (i/c ACSR Conductor 50 Sqmm (Rabbit), GSL 85WG GI Nut & Bolts of sizes, eye screw bolt Wt. 0.483 Kg, earthing rod Wt. 6.175 Kg Gl pipe 40 mm dia 6 Mtr. Long earthing set B class, Gl strip 25x6 mm 9 Mtr. For earthing Wt. 10.80 Kg, lighting arrestor 9 KV, HT XLPE cable 3 C x95 Sq mm with TR, Termination Kit O/D 3 C x 95 Sq mm, Wooden Gutka GI channel 100x50x6 mm 2200 mm for holding fuse board, LT fuse board with bus bar & aluminum patti, plinth structure including PCC pole 11 Mtr. Long with half clamp weight 1.47 kg. HVPN Drg. No. 2380, full clamp weight 2.325 Kg HVPH Drg. No. 2349, 11 KV polymeric pin with insulator, 11 KV polymeric disc insulator wtih fitting (T&C type), stay set 8 ft. long complete with X-plate 460 nn of angle 65x65x6 mm elbow rod Wt. 13.80 Kg., stay wire 7/8 SWG, Gi channel 100x50x6 mm 2200 mm for H-pole Wt. 21.032 Kg, GI channel 50x50x6 mm 2400 mm for earth wire Wt. 10.80 Kg. Gl channel 75x40x6 mm 2200 mm for fuse unit Wt. 15.708 Kg, 100x50x5 mm 2200 mm for H-pole Wt. 21.032 Kg, 11 KV GO switch complete with handle, pipe & supporting channel with proper thumbing including construction of transformer platform, fencing & stone gravels & required safety signboards in switch yard area complete in all respect as per site condition & any other leftover items if any as per site requirement and specification approved by DHBVN Department) (All Type of Third party Inspections Charges e. Pre-Dispatch, Final Inspection, M&P, CEI inspection departmetal Inspection, etc. during any state inclusive of rate) at Badhwana 1,2 & 3PH. Please Enable Macros to View BoQ information |