| 1 | Repairing and rewinding of burnt(if required) damage transformer cooling fan of various ICT and transformer installed at 220 KV s/s rania of size 24 inch 3 phase 5 HP 415 volt RPM 2870 fan motor with replacement of their ball bearing and copper winding along with repair of broken or damage body of motor. |
| 2 | 220 KV S/S Rania Kanpur Dehat |
| 3 | 132 KV S/S Azadnagar Kanpur |
| 4 | 132 KV S/S Jainpur Kanpur Dehat |
| 5 | 132 KV S/S Pukhrayan Kanpur Dehat |
| 6 | Overhauling/Servicing of different make T/F cooling fans (size 18\\"/24\\"\\") cooling fans. The job includes dismantling of fans from T/F, cleaning of blades, replacement of both side bush/bearing and their oiling/greasing work along with refixing of fans on T/F radiator after overhauling & checking for smooth operation of cooling fans with all the cable connection work complete in all respect (All material will be arranged by contractor). No. of T/F cooling fans at the following substation- |
| 7 | 220 KV S/S Rania Kanpur Dehat |
| 8 | 132 KV S/S Azadnagar Kanpur |
| 9 | 132 KV S/S Jainpur Kanpur Dehat |
| 10 | 132 KV S/S Pukhrayan Kanpur Dehat |
| 11 | Supply and installation of auxilary contact for T/F cooling cubicle (2NO+2NC) standard make as per sample/installed. |
| 12 | 220 KV S/S Rania Kanpur Dehat |
| 13 | 132 KV S/S Azadnagar Kanpur |
| 14 | 132 KV S/S Pukhrayan Kanpur Dehat |
| 15 | Dismantling of defective 33 KV VCB of 33 KV feeder by opening of all connected jumpers cable connection and cutting of earthing strip of circuit breaker as per site requirement at 220 KV S/S Rania Kanpur Dehat. |
| 16 | Modification of foundation by MS channel / angles as per side requirement from 33 KV ABB, stelmec,Siemens,Shreem make VCB foundation to 33 KV ABB, Stelmec, Shreem, Siemens make vcb foundation as per side requirement at 220 KV S/S Rania Kanpur Dehat. |
| 17 | Shifting and Erection of 33 KV VCB Stelmec, Shreem,ABB, at above dismantled place and modified foundation safely and carefully at 220 KV S/S Rania Kanpur Dehat. |
| 18 | Making of earthing by MS flat as per side requirement at 220 KV S/S Rania Kanpur Dehat. |
| 19 | Cable termination,wiring with new lugs and ferrule as of above circuit breaker at 220 KV S/S Rania Kanpur Dehat. |
| 20 | Making of Jumper by ACSR panther conductor with the help of terminal connector( 6 jumpers each job) at 220 KV S/S Rania Kanpur Dehat. |
| 21 | Shifting of dismantled 33 kv VCB from working place to store as per direction of junior engineer at 220 KV S/S Rania Kanpur Dehat. |
| 22 | Opening of connected jumpers from damaged 33 KV bus during arranged shut down period. |
| 23 | 132 KV S/S Azadnagar Kanpur |
| 24 | 132 KV S/S Jainpur Kanpur Dehat |
| 25 | 132 KV S/S Pukhrayan Kanpur Dehat |
| 26 | Dismantling of defective 33 KV bus section including opening of gun fitting etc. including shifting of dismantled material upto S/S store during arranged shutdown period. |
| 27 | 132 KV S/S Azadnagar Kanpur |
| 28 | 132 KV S/S Jainpur Kanpur Dehat |
| 29 | 132 KV S/S Pukhrayan Kanpur Dehat |
| 30 | Stringing of 33 KV main bus by using Taramtulla /Moose/Zebra conductor, cutting, bending & gun fitting for main bus at 132 KV S/S Azadnagar to complete the work during arranged S/D period (Required conductor and clamps provided by department) |
| 31 | 132 KV S/S Azadnagar Kanpur |
| 32 | 132 KV S/S Jainpur Kanpur Dehat |
| 33 | 132 KV S/S Pukhrayan Kanpur Dehat |
| 34 | Re-jumpering by old/new (as per required) conductor at 33 KV feeders, associated T/F & section of 33 KV main bus during arranged S/D period. |
| 35 | 132 KV S/S Azadnagar Kanpur |
| 36 | 132 KV S/S Jainpur Kanpur Dehat |
| 37 | 132 KV S/S Pukhrayan Kanpur Dehat |
| 38 | Dismantlling of defective 110V 200AH Battery Charger (JVV make). The job including shifting of above charger in S/S store after tracking of all cable connection dismantle of earthing and wiring very carefully with skilled technician at 132 KV Substation Jainpur, Kanpur Dehat. |
| 39 | Installation of new charger 110V 200AH Battery Charger (JVV make) after shifting of above charger S/S store to site at 132 KV Substation Jainpur, Kanpur Dehat.The job including of all wiring shifted to new panel with carefully alongwith earthing properly. After completion of all work done testing & checking properly. Please Enable Macros to View BoQ information |