|
| 1 | M&L for preparation of old decorated surfaces of walls including cornices, pilasters etc (plastered or unplastered surfaces) and applying one coat of cement base paint complete all as specified and as directed by Engr in Charge |
| 2 | All as per item No 1.00 (here-in-before) but applying two coats of cement base paint on old surfaces of walls. |
| 3 | M&L for preparation of old decorated surfaces and applying one coat of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm complete all as specified and as directed by Engr in Charge |
| 4 | M&L for preparation of old decorated surfaces and applying two coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm complete all as specified and as directed by Engr in ChargeNote for item No 01, 02 , 03 & 04(i) Use of all scaffolding, trestles, ladders, cradles etc necessary for execution of work and protective measures.(ii) Removing of nails, making good holes, cracks etc. (iii) Work in patches and narrow widths, bands, cornices, plasteres etc and cutting in edges to line where necessary. (iv) Spreading and removing coverings to doors, windows, floors, fittings etc to protect them from splashes.(v) Cleaning of bush, shrubs, vegetation, grass, weed, saplings etc.(vi) Washing floors, cleaning glass, joinery, electric fittings,wiring etc., of drops and splashes and leaving premise, clean and tidy etc. complete all as specified and as directed by Engr in Charge. |
| 5 | M&L for Preparation of old decorated surfaces by washing ,rubbing down and stopping of distempered and painted surfaces on wall and applying one coat of oil emulsion distemper on walls complete all as specified and as directed by Engr in Charge |
| 6 | M&L for Preparation of old decorated surfaces by washing ,rubbing down and stopping of distempered and painted surfaces on wall and applying two coats of oil emulsion distemper complete all as specified and as directed by Engr in Charge |
| 7 | M&L for Preparation of plasterded or un plastered old surfaces of Ceiling and applying two coats of white wash complete all as specified and as directed by Engr in Charge.all as specified and directed |
| 8 | M & L for applying 2 mm thick Birla white putty/JK white wall care putty on walls complete all as specified and as directed by Engr in Charge |
| 9 | M&L for applying one coat of synthetic enamel paint (1st grade) on old decorated wooden surfaces of any description including preparation of old wooden surfaces area over 10cm width & girth complete all as specified and as directed. |
| 10 | M&L for applying one coat of synthetic enamel paint (1st grade) on old decorated steel surfaces of any description including preparation of old steel surfaces area over 10cm width & girth complete all as specified and as directed. |
| 11 | M&L for rendering 10 mm thick on fair faces of brick work or concrete surfaces in cement mortar (1:6) and finished the surfaces even and smooth (without using extra cement) including taking down old plaster from its position complete all as specified and as directed. |
| 12 | M&L for 15 mm thick rendering on fair faces of brick/concrete surfaces in CM (1:4) and finished the surfaces even and smooth (without using extra cement) including taking down old plaster from its position complete all as specified and as directed. |
| 13 | M&L for preparation of new plastered or un plastered surface of walls including cornices, pilasters etc and applying two coats of cement base paint over and including a coat of primer complete all as specified and as directed. |
| 14 | M&L for preperation of new plastered surfaces of wall and applying two coats of oil emulsion distemper over and including a coat of primer complete all as specified and directed. |
| 15 | S&F Sheet glass 3mm thick, ordinary quality and glazing with oil putty in squares not exceeding 0.5sqm in each pane.( the rate including scafolding and labour charge to fix up to 4 storey) including hacking out old unsv one complete all as specified and directed. |
| 16 | S&F 110mm PVC (SWR) pipes single/double socketed in any length with rubber ring joints fixed to floor/wall including demolition of existing pipe of any description set in cement mortar complete all as specified and as directed. |
| 17 | S&F 75mm PVC (SWR) pipes single/double socketed in any length with rubber ring joints fixed to floor/wall including demolition of existing pipe of any description set in cement mortar complete all as specified and as directed. |
| 18 | S&F(SWR) 110mm bore pipe junction single (single T) equal and unequal with access door complete all as specified and as directed. |
| 19 | S&F PVC (SWR) branch piece, double (double Y) equal or unequal 110mm bore complete all as specified and as directed. |
| 20 | S&F 110mm dia PVC (SWR) bends complete all as specified and as directed. Please Enable Macros to View BoQ information |