|
| 1 | PART-A :- Construction of 11 KV O/H line of 0.08 CKM using 55 Sq.mm. XLPE AAAC Covered Conductor along with cutpoint arrangementNo. of Cut Point with 180 Degree Angle(Ref. Drawing No.- TPCODL-MVD-0004)WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 2 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 2 no's Channel(GI) required =( 2x9.56x1.2) |
| 3 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 4 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 2 no'sChannel(GI) required =(2x9.56x0.306) |
| 5 | Danger Plate, 1 no's. |
| 6 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 7 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 8 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's= (4x0.59x0.510) |
| 9 | 11 KV pin insulator polymer |
| 10 | H W fitting(B&S) 70KN, 3Bolt |
| 11 | Disc insulator (B&S) 70 KN polymer |
| 12 | Earthing of Support ( Coil Type ) |
| 13 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 14 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 15 | IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV |
| 16 | GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole) |
| 17 | Black Paint(GIS Numbering & Zebra Stripping) |
| 18 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 19 | Civil & ServicesConcreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 20 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 21 | No. of Cut Point with 90 Degree Angle(Ref. Drawing No.- TPCODL-MVD-0005)WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 22 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required =( 4x9.56x1.2) |
| 23 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280) |
| 24 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no'sChannel(GI) required =( 4x9.56x0.306) |
| 25 | Danger Plate, 1 no's. |
| 26 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 27 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 28 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's= (4x0.59x0.510) |
| 29 | 11 KV pin insulator polymer |
| 30 | H W fitting(B&S) 70KN, 3Bolt |
| 31 | Disc insulator (B&S) 70 KN polymer |
| 32 | Earthing of Support ( Coil Type ) |
| 33 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 34 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 35 | IPC for 55 sq.mm AAA conductor (For covered conductor)-11kV |
| 36 | WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR |
| 37 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 38 | H.T. Stay set (Complete ) |
| 39 | H.T. Stay Insulator Type-C |
| 40 | 7/10 SWG Stay Wire 15kg /stay |
| 41 | GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 42 | Black Paint(GIS Numbering & Zebra Stripping) |
| 43 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 44 | Civil & ServicesFixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 45 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 46 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 47 | 11 Kv Line Length In KM with 40 Mtr. Span(Ref. Drawing No.- TPCODL-MVD-0003)WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 48 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 49 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 50 | Danger Plate, 1 no's. for each pole |
| 51 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 52 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 53 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's= (4x0.59x0.510) |
| 54 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 55 | Earthing of Support ( Coil Type ) |
| 56 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 57 | GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 58 | 55 SQ.MM. AAAC XLPE Covered Conductor |
| 59 | Black Paint(GIS Numbering & Zebra Stripping) |
| 60 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 61 | NON METALLIC TIES -11KV 55SQMM CVRD AAAC |
| 62 | Civil & ServicesConcreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) = 0.45Cu.mtr(Per Pole) |
| 63 | Couping ratio 1:1.5:3(M-20 Grade) with dimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 64 | Part-B :- Construction of 11KV Line Guarding from pole to pole for road crossingGuarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI)length 2.2 mtr., 4 no's Channel(GI) required =( 4x7.14x2.2) ( For Single Pole) |
| 65 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 66 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 67 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 68 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 69 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (10.7 mtr For raising)=10.7x2.36 |
| 70 | Civil & ServicesConstruction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . |
| 71 | Part C :- Installation of One No. of 11KV DP with AB Switch and LA for HT metering unit WPB(GI) 160x152 (11Mtr. Long, 30.44KG/Mtr.) -DP |
| 72 | Top Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 3 mtr., 2 no's Channel(GI) required =( 2x9.56x3) |
| 73 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 74 | AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each Channel(GI) length 3Mtr., 2 no's Channel(GI) required =( 7.14x3x2) |
| 75 | HT MU Mounting Channel(GI) 100X50X6mm, 9.56KG/Mtr, each Channel(GI) length 3 Mtr.,2 no's Channel(GI) required =( 9.56x3x2) |
| 76 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long,2No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14) |
| 77 | Angle(GI) for Cantilever arrrangement for HT MU 50 x 50 x 6 - 1282 mm.each 2nos.(4.5 K.g. per mtr.) |
| 78 | MU and AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., eachChannel(GI) length 0.35 mtr., 4 no's Channel(GI) required =( 9.56x4x0.35) |
| 79 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1) |
| 80 | Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required =( 7.14x3x2) |
| 81 | 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2) |
| 82 | Danger Plate, 2 no's. |
| 83 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2no's = (2x0.59x0.510) |
| 84 | 55mm2 ACSR - PVC Insulated for Jumpering |
| 85 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required (1 Pair) |
| 86 | H.T. Stay set (Complete ) |
| 87 | H.T. Stay Insulator Type-C |
| 88 | 7/10 SWG Stay Wire 15kg /stay |
| 89 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 90 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body,2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36 |
| 91 | GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 92 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 93 | Lightning Arrester(12KV,10KA) (Station Class,class-2) |
| 94 | AB Switch (11KV,200A.3pole,50Hz) |
| 95 | 11 KV pin insulator polymer |
| 96 | H W fitting(B&S) 70KN, 3Bolt |
| 97 | Disc insulator (B&S) 70 KN polymer |
| 98 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 99 | GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch) |
| 100 | POLYCARBONATE BIRD GUARD |
| 101 | Black Paint(GIS Numbering & Zebra Stripping) |
| 102 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 103 | Civil & ServicesFixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 104 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1800mm) =0.45Cu.mtr(Per Pole) |
| 105 | Couping ratio 1:1.5:3(M-20 Grade) with dimension ( 500X500X450)= 0.1125 Cumtr(Per Pole) |
| 106 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe . |
| 107 | Supply and Erection of GI Fencing with Gate |
| 108 | Part D :- Dismentling of MaterialsDismantling of 9/8 Mtr. PCC/Joist Pole |
| 109 | Part- E Supply & Installation of 11/0.4 KV 500 KVA DSSWPB 160x152 (11Mtr. Long, 30.44KG/Mtr.) |
| 110 | Top Channel GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 111 | Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 112 | Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 3.0 Mtr., 2 no's channel required =( 7.14x3x2) |
| 113 | 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr., 2 nos angle required = (4.5x3.512x2) |
| 114 | AB Switch Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 115 | AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35) |
| 116 | Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1) |
| 117 | HG/ DO Fuse Mounting Channel 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 39.98 Kg) |
| 118 | Cantilever Support Channel 75x40x4.8 mm GI Channel (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 119 | Cantilever Support Angle 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 120 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x 2.36= 154.81 Kg) |
| 121 | 500 KVA , 11/ 0.4 KV (Cu) Transformer with Motorisied OLTC & RTCC Panel BIS Energy level II |
| 122 | LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 500 KVA S/S |
| 123 | 55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated (50 Mtr. Each Dtr.) |
| 124 | 1 Cx 400 mm2 LT XLPE Cable(Un-Armoured) |
| 125 | AB Switch(11KV,200A.3pole,50Hz) |
| 126 | H.G.Fuse( 11KV.200A.3Pole) |
| 127 | PG Clamp for 55 sq.mm AAA conductor |
| 128 | Disc insulator (B&S)70 KN polymer |
| 129 | H W fitting (B&S)70KN(3bolted) |
| 130 | Lightning Arrester(12KV,10KA) Station Class 2 |
| 131 | 11KV pin insulator polymer |
| 132 | HT stay set complete |
| 133 | HT stay Clamp (1.9Kg/pair) |
| 134 | HT stay insulator TYPE-C |
| 135 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 136 | 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long |
| 137 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 138 | GI Barbed wire/Anticlimbing device (3Kg /Pole) |
| 139 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's (Each 8x0.59x0.510) |
| 140 | Danger plate 11kv |
| 141 | Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's (Each 2x0.59x0.510) |
| 142 | Name plate |
| 143 | Yellow Colour Paint for Background |
| 144 | Black Colour Paint for numbering |
| 145 | Civil and Services Works-Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.450Cu.mtr |
| 146 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator . |
| 147 | Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.113Cu.mtr |
| 148 | Construction Earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including, installation of 3 Mtr GI pipe 40/50 mm including welding of GI flat around pipe. |
| 149 | LTDB Plinth |
| 150 | DTR Plinth Up to 1000 KVA |
| 151 | Laying of 1.1 KV Cable upto 185 to 400 Sq mm |
| 152 | Supply and Erection of GI Fencing with Gate Please Enable Macros to View BoQ information |