| 1 | [10.30.1]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 1. Light shade pigment using white cement [Through Rate] |
| 2 | [10.51]Providing and fixing granite stone in all shades 15mm to 18 mm thick in skirting /dado, risers of steps, pillars and wall facing, laid in any pattern as specified over base of 12mm thick cement coarse sand mortar 1:3 and jointed with white cement slurry mixed with pigment to match the shade of Granite including labour for fixing cramps pins and dowels etc. [Through Rate] |
| 3 | [10.99]Providing and fixing covel stone/garden stone of size 150 mm x 150 mm laid in 20 mm thick cement mortar 1:3 including grouting the joint with white cement and matching pigment complete in all respect (Covel/Garden stone to be as per manufacturer`s specifications to be got approved from Engineer-in-charge) [Through Rate] |
| 4 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] |
| 5 | [11.8.1]12 mm cement plaster of mix : 1. 1:4 (1 cement: 4 coarse sand) [Through Rate] |
| 6 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 7 | [4.15.1]Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. 1. Ordinary rock [Through Rate] |
| 8 | [4.5.1]Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same. 1. All kinds of soil [Through Rate] |
| 9 | [4.6]Extra for levelling and neatly dressing of disposed soil completely as directed by Engineer-in-charge. [Through Rate] |
| 10 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] |
| 11 | [6.8.1]Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 1. 50 mm thick [Through Rate] |
| 12 | [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] |
| 13 | [7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] Please Enable Macros to View BoQ information |