| 1 | TSU 315 KVA , 3.3kV/570V of NCPH SA |
| 2 | 99.96% electrolytic new copper conductor TGC for replacement of old and damaged primary winding |
| 3 | 99.96% electrolytic new copper conductor TGC for replacement of old and damaged secondary winding |
| 4 | Other Insulation materials for coil formation, overall insulation , heating and varnish class-H (@15% of Sl. No. 1.1 to 1.2) |
| 5 | Labour Charges (02 unskilled + 02 skilled) x 04 days |
| 6 | Less Scrap Material (-) (to be subtracted) |
| 7 | Contractor Profit @10% of {1.1 to 1.5} |
| 8 | 150 KVA, 3.3kV/440V Transformer of NCPH SA |
| 9 | 99.96% electrolytic new copper conductor DPC for primary coil |
| 10 | Re-insulation & re-coiling of damaged secondary winding |
| 11 | Other Insulation materials for coil formation, overall insulation , heating and varnish class-H (@15% of Sl. No. 2.1 to 2.2) |
| 12 | Labour Charges (02 unskilled + 02 skilled) x 04 days |
| 13 | Less Scrap Material (-) (to be subtracted) |
| 14 | Contractor Profit @10% of {2.1 to 2.5} |
| 15 | 100 KVA, 3.3kV/440V Transformer of NCPH SA |
| 16 | 99.96% electrolytic new copper conductor DPC for primary coil |
| 17 | Re-insulation & re-coiling of damaged secondary winding |
| 18 | Other Insulation materials for coil formation, overall insulation , heating and varnish class-H (@15% of Sl. No. 3.1 to 3.2) |
| 19 | Labour Charges (02 unskilled + 02 skilled) x 04 days |
| 20 | Less Scrap Material (-) (to be subtracted) |
| 21 | Contractor Profit @10% of {3.1 to 3.5} |
| 22 | Repairing/Rewinding of Marson Electrical Pvt. Ltd. Make 250 KVA, 3.3kV/440V, Sl. No. 24144 Oil Cooled Lighting Transformer installed at Regional Hospital Substation , Kurasia Colliery , Kurasia SA |
| 23 | 99.96% electrolytic copper conductor DPC for primary coil |
| 24 | Re-insulation & re-coiling of damaged secondary winding |
| 25 | Insulation material cost (@15% of Sl. No. 4.1 to 4.2) |
| 26 | Labour Charges (@10% of Sl. No. 4.1 to 4.3) |
| 27 | Less Scrap Material (-) (to be subtracted) |
| 28 | Testing & Supervision Charges (@10% of Sl. No. 4.1 to 4.5) |
| 29 | Replacement of bushing with nut bolt and washer |
| 30 | Repairing/Rewinding of Calson Make 400 KVA, 3.3kV/440V, Sl. No. CE 2604 Oil Cooled Lighting Transformer installed at Water Filter Plant, Kurasia Colliery , Kurasia SA |
| 31 | 99.96% electrolytic grade bare copper conductor rectangular strip for replacement of primary winding |
| 32 | Triple Paper Insulation of the above new primary conductor |
| 33 | Re-insulation with triple paper insulation of existing conductor (rectangular strip) secondary winding (03 nos. coil, each coil weighing 50.0 Kgs) |
| 34 | Insulating materials for coils formation and overall insulation including heating and varnishing with Class \\"B\\" Varnish |
| 35 | Labour Charges (@10% of Sl. No. 5.1 to 5.4) |
| 36 | Less Scrap Material (-) (to be subtracted) |
| 37 | Testing & Supervision Cost including contractor profit (@10% of Sl. No. 5.1 to 5.6) |
| 38 | Repairing/Rewinding of Electroteknica Make 315 KVA, 3.3kV/570V, Sl. No. TSU 1050 TSU installed at Kurasia UG Mine , Kurasia SA |
| 39 | 99.96% electrolytic new copper conductor TGC for replacement of old and damaged primary winding |
| 40 | 99.96% electrolytic new copper conductor TGC for replacement of old and damaged secondary winding |
| 41 | Other Insulation materials for coil formation, overall insulation , heating and varnish class-H (@15% of Sl. No. 6.1 to 6.2) |
| 42 | Labour Charges (@10% of Sl. No. 6.1 to 6.3) |
| 43 | Less Scrap Material (-) (to be subtracted) |
| 44 | Contractor Profit @10% of {6.1 to 6.5} |
| 45 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |