| 1 | Revamping and preventive maintenance of entire meter room inconsultation with BEST. Liaison charges to be in the includedrates. Cleaning of meter room, Bus bar retaping or new bus barsprovision etc. complete. |
| 2 | SITC of 30 mA , 63 Amps 4 pole RCCBs at distribution panels. |
| 3 | SITC of 100 mA , 63 Amps 4 pole RCCBs at distribution panels. |
| 4 | SITC of 100 mA , 63 Amps 2 pole RCCBs at distribution panels. |
| 5 | SITC of 30 mA , 63 Amps 2 pole RCCBs at distribution panels. |
| 6 | Preventive maintenance of the main LT panel. Tightening of allthe terminations, cleaning of cable cores, of stencillingdestinations on rear and front sides of the panel. Replacementof rusted hardware etc. |
| 7 | Preventive maintenance of the floor LT panels/ distributionboards of all the Tightening of cable terminations, cleaningcores, of destinations. stencilling of rusted Replacementhardware, dressing of cables/wires, lugs to be provided wherevrrequired etc. |
| 8 | SITC of earthing pits as per the design given in IS 3043 with 50mm X 2Mtr Dia GI earhting pipe and chemical, chmaber makingand pit cover to be provided. All earthing pits to be connected ingrid. |
| 9 | SITC of LT insulation mat 2 mm thick to be spread in front ofpanels. |
| 10 | Supply and laying of 25 x 3 mm GI earthign strips from newearthign pits. |
| 11 | Supply and laying of 16 guage GI wire for extending earthingconnections. All panels/DBs to be provided with two bodyearthing connections. |
| 12 | Dressing of all the hanging wires in the offices on all the floors.All dead wires to be removed. All wires should be laid in PVCconduits. |
| 13 | Making of single line diagrams of the main LT panel and floorpanels. |
| 14 | Attending to all miscelleanous complaints given in electricalsafety audit report. |
| 15 | Replacement of Old Single pole MCBs by new MCBs 6 Amps to32 Amps |
| 16 | SITC of new 4 pole MCBs of 40 Amps capacity |
| 17 | SITC of new 12 way TPN disribution boards in place Including63A 4P RCBO 30mA & 6 to 32A Single Pole MCV of old KIT Katfuse type boards with all TPN and SP MCBs of equvalient size. |
| 18 | Supply and fixing of danger boards of suitble size near electricalpanels. |
| 19 | Supply and fixing of CPR charts as publsihed by National Safetycouncil near electrical panels. |
| 20 | Preventive maintenance of all the switch baords existing in theGIC building. Also all joints on wiring to be remade withconnectors or proper insulation tape. |
| 21 | Supply and laying of 4 sq.mm copper conductor wire in PVCconduits wherever required. (FRLSH) Insulated |
| 22 | Provision of sand buckets with dry fine sand near main electricalroom and lift room. |
| 23 | Sealing of cable entry holes in panels. |
| 24 | Supply and Installation of APFC panel of 200 KVAR withassociated cabling complete. |
| 25 | Supply of LOTO kit with locks and tags for lockingMCB/MCCB/SFU. Lockout Tagout Station-1 No, Osha SafetyPadlock-10 Nos, Vinyl Coated Hasp Small-2 Nos, Vinyl CoatedHasp Premier-2 Nos, Non - Conductive Hasp With 4 Holes-2 Pc. |
| 26 | Supply, Installation, Testing and Commissioning (SITC) of 250Amps FP MCCB-1 Nos. & 125 Amps, 4-Pole MCCB – 2 Nos.,complete with a 300 Amps rated prefabricated copper busbarsystem, for replacement of the existing fuse-type distributionboard. with termination of existing 70 sq.mm/3.5C cablescomplete. |
| 27 | Supply, Installation, Testing & Commissioning (SITC) of 1600Amps, 50 kA 4P Air Circuit Breaker (ACB) enclosure withincluding dismantling and removal of existing old ACB, completereplacement, termination of existing outgoing 400 sq.mm/3.5C x4Nos cables, testing and commissioning as required. |
| 28 | Supply, Installation, Testing & Commissioning (SITC) ofprogrammable timer for automatic control of Air Conditioner inUPS room & lift room, including wiring, mounting,interconnections and complete commissioning. |
| 29 | Revamping of existing changeover switch includingretrofitting/replacement of switch mechanism and HRC fuses,complete with testing and commissioning. |
| 30 | Supply, Installation, Testing & Commissioning (SITC) ofretrofitting switch for UPS input and output MCCB. |
| 31 | SITC of 6 sq.mm/4C 2XFY FRLSH cable wherever required forlooping of distribution board. |
| 32 | SITC of 10 sq.mm/4C 2XFY FRLSH cable wherever required forlooping of distribution board. |
| 33 | Supply, Installation, Testing & Commissioning (SITC) of 250 AmpsFP MCCB-1 Nos & 125 Amps, 4 Pole, MCCB-2 Nos , 63 Amps FPMCB -9 Nos Complete with 300 Amps rated prefabicatedcopper busbar system, for replacement of the existing fuse typedistribution board with termination of existing cables |
| 34 | Providing all materials and labour for painting woodwork, plain steel surfaces, grills, etc including scaffolding, scrapping Existing paint applying one coat primer, filling the crevices and holes with painters putty and finishing with 2/3 coats of approved quality of Synthetic enamel paint on M.S. grills/ M.S shop doors/main gate/M.S structure to support to sintex tank at the terrace level,etc. Please Enable Macros to View BoQ information |