| 1 | Earth work in excavation of foundation in all kinds of soil including levelling the bed and depositing excavated earth away from site with 50 mtr initial lead.1.5 mtr initial lift. Comp. As per direction of EIC |
| 2 | Supplying,filling of sand in foundation and plinth base of road surface including cost of material with taxes,watering,ramming and required for the work etc complete as per direction of EIC |
| 3 | Cement concrete (1:4:8) using 40mm size CBHG metal mixing with concrete mixture laying,compacting including cost of all material with taxes,watering,curing,labour required for the work etc comp. As per direction of EIC |
| 4 | Brick work with Fly Ash Brick having crossing strength between 100kg/cm2 to149kg/cm2 in C.M.( 1:6) in foundation and plinth. |
| 5 | Brick work with Fly Ash Brick having crossing strength between 100kg/cm2 to149kg/cm2 in C.M.( 1:6) in super structure. |
| 6 | 16mm thick cement plastering in CM(1:6) over brick masonary including cost,conveyance,royalty etc comp. |
| 7 | 12mm thick cement plastering in CM(1:6) over brick masonary including cost,conveyance,royalty etc comp. |
| 8 | PCC work in(1:2:4) with 12mm size crusher broken HG chips mixing with concrete mixture laying,compacting including cost of all material with taxes,watering,curing,labour required for the work but excluding centering/shuttering comp. as per direction of EIC |
| 9 | Fixing Tiles in Floor, treads or steps on 25mm thick bedof C.M. (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tile including rubbing & polishing including cost of precast tiles. |
| 10 | Fixing Tiles in Floor, treads or steps on 25mm thick bedof C.M. (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tile including rubbing & polishing including cost of precast tiles. Granite Tiles ( above 0.10 sqm andup to 0.40 sqm ) |
| 11 | Providing fitting and fixing of false ceiling with Aluminium anodised T section No 3215 with 2'.00\\" center to center, L section No. 1705 upto 15 micron on 4 walls to be fixed by means of steel screw and PVC plug and the Aluminium grid 2'-0\\"x2'-0\\" with 12.5mm. thick Gypsum Board suspended from ceiling etc. complete. |
| 12 | Cement concrete M-20 with 20mm down graded size crusher broken hard granite chips for RCC work including Hoisting,lowering,laying and compacting concrete,watering excluding centering and shuttering with cost,conveyance,royalty of materials and all labour charges |
| 13 | Straightening bentup or coiled MS Rod or HYSD steel(Fe-415) cutting,bending,cracking,hooking, welding or jointing if required,the MS rod or HYSD steel and binding,tying the grills,hoisting,lowering and placing in proper position as required in proper position as required for RCC works including cost,conveyance,taxes of MS Rod or HYSD steel and binding wires of 18 to 20 gauges and labour charges reqd for the work etc comp. as per direction of EIC |
| 14 | Rigid & smooth centering & shuttering for RCC works including false work & dismantling them after casting including cost of materials complete |
| 15 | Cost of Fabricated 01 no MS door,02 no s of fabricated MS windows,04 no skylight etc comp. |
| 16 | Supplying all Materials,labour,T&P for providing Artistic Paint with super grade weather coatwith glushy finish including cost of cleaning the wall surface by scrapers / sand paper / hard brushes including one coat of primer over two coat of wall putty finished smooth using Berger/Asian /JK or equivalent paint including cost of scaffolding and other T & P ,materials etc. allcomplete as per the specification including all taxes & labour cess |
| 17 | Wall painting two coat with Plastic Emulsion Paint of approved shade on new work with two coats to give an even shade over one coat of wall priming including cost of paint & primer & cost of all labour etc comp. |
| 18 | fixing GCI sheet(Durasine coloured sheet) in roof drilling Holes in wind tiles including fixing of ridges valleys wind tiles etc including cost of fitting per sqm.(vide AR-125/32 |
| 19 | Labour for fitting and fixing GCI sheet in ridges or valleys per 1 mtr |
| 20 | Providing and fixing CPVC pipes confirming toIS:15778 having thermal stability for hot & cold water supply,including all CPVC plain and brass threads fitting including fixing the pipe with clamps at 1.0 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement & testing of joints comp. as per direction of EIC |
| 21 | Providing & fixing water closet,squatting pan(indian type WC pan) confirming toIS:2556: Part 3-2004 dully embeded in cement concrete(1:4:8) using hard granite metal 4cm nominal size all comp. As per specification |
| 22 | Providing and fixing PVC low level flushing cistern with manually controlled delivery(handle liver) confirming to IS:7231 with all fittings and fixtures comp. |
| 23 | Fixing wash kitchen sink confirming to IS 2556:part5-1994 with cast iron or MS brachet painted white including cutting holes inwalls and making good the damages etc all comp as per specification |
| 24 | Fixing piller taps capstain head screw down high pressure lettered hot & cold with long screws, shank and back nurs of following nominal diameter |
| 25 | Fixing pedestal for wash basin complete recessed at the back for the reception of pipes and fittings all comp. As per direction of EIC |
| 26 | Fixing PVC wastepipe of following nominal diameter for wash basin or sink including brass check nut Please Enable Macros to View BoQ information |