| 1 | E/W in stripping by hydraulic M/C in grade A & B type of soil including morroum soil, soil mixed with kankar, pebbles, boulders upto 300 mm size and disposal of the same along with all organic materials in the country side beyond 150M. upto 500 M in all by tipper including construction & maintenance of haul road etc. all complete as per specification and direction of E/I.(SR No. WRD-5.1.6.1) |
| 2 | Earth work in excavation of foundation trenches of toe wall,spillway,head regulator, outlet, intake well etc. as per designed section in all kinds of soil including moorum soil, soil mixed with kankar, pebbles and boulders upto 300mm size and disposal of the same (beyond 50 m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5 m as per specification and direction of E/l.(Vide Item No. - 5.1.14.1 of WRD Part -B ,Pg No.-99) |
| 3 | E/W in excavation and filling in canal by the hydraulic excavator as per designed section in ordinary soil (vide classification of soil item -A) and making the banks with excavated earth in proper profile and clod breaking and laying earth in 225 mm layers with initial lead of 10 m and all lifts all complete as per specification and direction of E/I (SR No.7.1.43.3)(WRD) |
| 4 | E/W in excavation and filling in canal by the hydraulic excavator as per designed section in ordinary soil (vide classification of soil item -A) and making the banks with excavated earth in proper profile and clod breaking and laying earth in 225 mm layers upto 500 m and all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I.(SR No. 7.1.43.4)(WRD) |
| 5 | E/W in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of the excavated earth as obtained to a distance upto 50 m and average lift of 1.5 m including levelling , ramming the foundation trenches , removing the roots of shrubs etc all complete as per specification and direction of E/I(SR No. WRD-7.1.27 ) |
| 6 | Watering and consolidation of earth laid in 150mm to 225mm layers by manual labour with C.I.hammer to achieve minimum 85% of maximum dry density including supply of water and necessary tools and plants with all leads and lifts all complete as per specification and direction of E/I.(SR No.- WRD-7.1.38) |
| 7 | Supplying and laying sand filter on slope of the dam as per design, drawing, with watering and compaction including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.(SR No.-WRD & Common-5.6.5) |
| 8 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.(SR No.WRD & Common-5.6.8) |
| 9 | Earth work in bed clearance or desilting of canals carrying F.S. discharge between 8.5 cumecs (300 cusecs) and 0.14 cumecs (5 cusecs) and rennovation of pynes etc disposal of excavated earth etc. in ordinary soil including rough dressing with initial lead of 10M and lift of 1.5M as per specification and direction of E/I.(SR Item No. WRD-7.1.20) |
| 10 | Dismantling of masonry structures (dismantling of existing structures like culverts,bridges,retaining walls and other structure comprising of masonary , cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000meters.(SR No.-Common-2.04(iii)B |
| 11 | Providing coarse clean local sand in filling in foundation trenches including ramming, watering, royalty and all other taxes complete job as per specification and direction of E/I.(S.R. Item No. WRD-7.1.37) |
| 12 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering .All work up to plinth level. 1:2:4 (1 cement :2 coarse sand (zone-iii) :4 graded stone aggregate 20mm nominal size as per specification and direction of E/I.(S.R. No. BCD-5.3.1.2) |
| 13 | Providing random rubble stone masonry in cement mortar (1:4) in foundationand plinth with hammer dressed stone of less than 0.03 cum in volume and clean coarse sand of F.M 2 to 2.5 including cost of screening, raking out joints to 20mm depth, curing including royalty and all taxes etc. complete job as per specification and direction of E/I.(SR No. Common-5.2.28) |
| 14 | Providing random rubble stone masonry in cement mortar (1:4) in Superstructure and plinth with hammer dressed stone of less than 0.03 cum in volume and clean coarse sand of F.M 2 to 2.5 including cost of screening, raking out joints to 20mm depth, curing including royalty and all taxes etc. complete job as per specification and direction of E/I.(S.R. No. Common-5.2.31) |
| 15 | Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I. (S.R . No. 5.7.11) (Common) |
| 16 | Providing 25mm thick cement plaster (1:4) with approved quality of sand of requisite F.M.1.5 including screening, curing with all leads and kifts of water, scaffolding taxes and royalty all complete job as per specification and direction of E/I. (S.R . No. Common-5.7.12) |
| 17 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering,finishing and reinforcement.All work up to plinth level. 1:1.5:3 (1 cement :1.5 coarse sand (zone-iii) :3 graded stone aggregate 20mm nominal size as per specification and direction of E/I SR No- 5.3.9.1 BCD |
| 18 | Providing T.M.T reinforcement (tor steel)--do-- complete job as pr specification and direction of E/I. (i) 8mm dia TMT Fe500 per MT (SR No- 5.5.4 BCD)/ 5.3.15i WRD ) |
| 19 | Providing shuttering including strutting proping etc. and its removal after use in foundation as pr Specification and direction of E/I (SR.Item No. 5.3.17 WRD) |
| 20 | Providing Centering including strutting proping etc. and its removal after use in deckslab as pr Specification and direction of E/I (SR.Item No- 6.3.22) |
| 21 | Supply of 150 mm Hume pipeNP2 with collor (SR No-M300(ii) Pg 84 WRD) |
| 22 | Labour for laying, fitting and fixing NP2 150mm dia hume pipe with collars in line, level and grade, as well as providing approved jointing materials and joints properly filled to make them water proof, all complete, as per specification and direction of E/I. (S.R . No. 7.6.1.1) (WRD) |
| 23 | Supply of 250 mm NP2 R.C.C. Hume pipe with collar(S.R. No M-300 (iv)pg-84) (WRD) |
| 24 | Labour for laying, fitting and fixing NP2 250mm dia hume pipe with collars in line, level and grade, as well as providing approved jointing materials and joints properly filled to make them water proof, all complete, as per specification and direction of E/I. (S.R . No. 7.6.1.2) (WRD) |
| 25 | Supply of 600 mm NP2 R.C.C. Hume pipe with collar .(S.R. No M-300(vii) pg-84) (WRD) |
| 26 | Labour for laying, fitting and fixing NP2 600mm dia hume pipe with collars in line, level and grade, as well as providing approved jointing materials and joints properly filled to make them water proof, all complete, as per specification and direction of E/I. (S.R . No. WRD-7.6.1.5) |
| 27 | Earth work in filling foundation trenches or back filling of masonry structures with suitable earth in layers not exceeding 150mm thick well watered, rammed and fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30m and initial lift 1.5m complete as per specification and direction of E/l.(Vide Item No. 6.1.16 of WRD Part -B Pg No.- 120 ) |
| 28 | Carriage of Materials:- Cement - lead 10 km(s)+ 3km (k) |
| 29 | Sand- lead 10 km(s)+ 3km (k) |
| 30 | Chips-lead 20 km(s)+ 3km (k) |
| 31 | Boulder -lead 20 km(s)+ 3km (k) |
| 32 | NP2 RCC Hume pipe (150 MM)-lead 20 km(s)+ 3km (k) |
| 33 | NP2 RCCHume Pipe (250MM)-lead 20 km(s)+ 3km (k) |
| 34 | NP2 RCC Hume Pipe (600MM)- lead 20 km(s)+ 3km (k) |
| 35 | Good and Service Tax @18% |
| 36 | Labour Cess @ 01% Please Enable Macros to View BoQ information |