|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 2 | All kinds of soils |
| 3 | Ordinary Rock |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
| 5 | All kinds of soils |
| 6 | Ordinary Rock |
| 7 | Providing and laying of dry stone soling tightly hand packed incl all carriages. |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) |
| 10 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. |
| 11 | Installation , testing, commissioning of Fire Hyurant with dual house to be installed on existing pipe along with required tail pieces connecting pipes upyto 3 mtr as per requirment made of G.I/ M.S pipes, Flanges, bends, Nipple, Valves, Union, Elbow & welding including all carriages etc. complete job. The job includes complete testing of the installation after proper welding & jointing. |
| 12 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded |
| 13 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form work for: |
| 15 | Foundations, footings, bases of columns etc. for mass concrete. |
| 16 | Walls(any thickness) including attached pilasters, buttresses, plinth andstring courses etc. |
| 17 | 12mm Cement plaster finished with a floating coat of neat cement of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 18 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia 4 mm |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work |
| 20 | Carriage of material from source to dumping site at road by mechnical transport. |
| 21 | Cement and Steel Avg.50 km |
| 22 | Sand/ 20 mm Agg. for average lead of 50km |
| 23 | 41 mm Agg. for average lead of 50km Please Enable Macros to View BoQ information |