| 1 | Npp School Computer Lab Work |
| 2 | Borring of 30 cm dia and 3.50 m depth D.U.R pile on B.C. soil i/c all complete. |
| 3 | R.C.C. work with 1:2:4 cement sand & 20 mm stone grit. I/c all material labour t/p etc complete in pile work. |
| 4 | Earth work excavation in foundation B.C. Soil in Bundel Khand area for foundation of grade beam work cI/c all labour t/p etc complete. |
| 5 | Sand Filling in foundation of grade beam work I/c all labour, material T&pP etc complete |
| 6 | C.C.work 1:4:8 with cement,sand & 40 mm stone bailast I/c all material labour t/p etc complete on base wok complete. |
| 7 | R.C.C. work with 1:1.5:3 cement sand & 20 mm stone grit. I/c all material labour t/p etc complete in grade beam work |
| 8 | 150 class brick work in boxing work bellow plingth with 1:6 cement sand mortar I/c all material labour t&p etc complete. S.I. 303 |
| 9 | 2.5 cm thick D.P.C. with 1: 1.5: 3 concreet with aproowed water proof compound I/c all material labour t/p etc complete. |
| 10 | 150 class brick work with 1:6 cement sand mortar on s/s work I/c all material labour t&p etc complete. |
| 11 | R.C.C. work with 1:1.5:3 cement sand & 20 mm stone grit. I/c all material labour t/p etc complete in Lintle Bend work. |
| 12 | R.C.C. work with 1:1.5:3 cement sand & 20 mm stone grit. I/c all material labour t/p etc complete on slab & slab beem work. |
| 13 | Steel Reinforcement for R.C.C work including straigthening , cutting , bending ,placing in position and binding all complete upto plinth level. DSR No. 5.2.2.1 |
| 14 | S/F of angle iron and bar made Window Ventilator grill i/c all complete |
| 15 | S/F of 40 mm thick seetapur made door & Window shutter i/c all alluminium fitting etc comlpete complete |
| 16 | 12 mm thick plaster work with 1:4cement sand mortar I/c all material labour t/p etc complete. |
| 17 | 15 mm thick plaster work with 1:6 cement sand mortar I/c all material labour t/p etc on outer side of wall work complete |
| 18 | Supply and fixing of 100 mm dia A C down pipe complete with rose heads bend with bye hole shoes and gratings etc fixed to wall with sutable clamps as directed by engineer-in-chargf |
| 19 | Finnishing wall with water prrof cement paint on new work three coat to give an even shade I/c all material; labour t/p etc complete |
| 20 | On priming coat and three coat oil destemer painting on new work I/c all material labour t/p etc complete. Luck S.I 649+650 |
| 21 | Painting of wood and iron work on door and window work complete |
| 22 | P/F of 8 to 10 mm thick ivory or light shade vitrified tile 600 X600 mm size on flooring with 1:3 Cement sand mortar , joint filled with white cemant with all complete |
| 23 | P/F of 6 mm thick china white glazed tile wall with 1:3 Cement sand mortar , joint filled with white cemant with all complete |
| 24 | S/F of 2 ton O General AC |
| 25 | S/F of Chair |
| 26 | Add 20% for internal & Enternal Electriffication |
| 27 | Add 20% for Water Supply submersible |
| 28 | Add 18% GST Please Enable Macros to View BoQ information |