| 1 | Clearing jungle including uprooting of rank vegetations grass, bush, wood trees and saplings of grith upto 30 cm. Measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 50 metres outside the periphery of area cleared. SI. No. 259 |
| 2 | Excavation in foundation in ordinary soil(Loam clay or sand).including lift upto 1.5 metre (5 fts.) and lead upto 30 m (100 fts) & including filling, watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 m. (100 fts) from the foundation trenches. S.I no - 251 |
| 3 | Cement concrete with 4cm gauge approved stone ballast, approved coarse sand, cement in the proportion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work.PCC SI No.281 |
| 4 | RCC work with cement approved coarse sand, and 2cm (3/4\\") gauge, approved stone ballast in the proportion 1:1.5:3 in Plinth Beam/Slab beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. s.i no- 286-1st |
| 5 | RCC work with cement approved coarse sand, and 2cm (3/4\\") gauge, approved stone ballast in the proportion 1:1.5:3 in lintels of doors and windows, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. SI. No. 283 (1) |
| 6 | RCC work with cement approved coarse sand, and 2cm (3/4\\") gauge, approved stone ballast in the proportion 1:1.5:3 in Slab and shelf, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. SI. No. 284 (I) |
| 7 | Mild steel or iron work in plain work such as reinforced concrete/brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks, and authorized over lapping shall be measured.SI. No. 504 |
| 8 | Class-150 brick work in 1:6 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. required for proper completion of the work. (Si. N0. 303) |
| 9 | Class-150 brick work in 1:6 cement and fine sand of 1.25 fineness modulus mortar in super structure including supply of all materials, labour and tools and plants etc. required for proper completion of the work.SI No. 303+309+310 |
| 10 | Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in super structure including supply of all materials, labour and tools and plants etc. required for proper completion of the work.SI No. 305+309+310A |
| 11 | Supply of M.S. Angle iron door, windows ventilation frame made of approved M.S. angle iron wroght to required form including drilling hole, welding and recetting where necessary and also including supply of all material, such as steel hinges of required size, nut & bolts etc. and also including all taxes, wastage and one coat of red oxide paint complete in all respect as per direction of Engineer-in-charge for proper completion of work at site of work. |
| 12 | Earth work cutting/ filling in plinth in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 1/2 metre (20\\") in depth and earthwork in embankment to be in 20 cm(8\\") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5fts) lifts and 30 m. (100') lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 metres (100 fts) distance as directed by Engineer-in-charge. SI. No. 253 |
| 13 | 12 mm thick plaster on brick work minimum thickness not less than 10 mm with cement mortar in proportion of 1:6 cement and fine sand of 1.25 fineness modulus including supply of all materials, labour and tools and plants etc required for proper completion of the work.SI No.17.58(III) |
| 14 | 15 mm thick plaster on rough side brick work minimum thickness not less than 10 mm with cement mortar in proportion of 1:6 cement and fine sand of 1.25 fineness modulus including supply of all materials, labour and tools and plants etc required for proper completion of the work.SI No.17.59(III) |
| 15 | P/L (white/coloured) Kajaria tiles, Ramano tiles flooring over 20 mm(av.) thick base of cement mortar 1:4:(1 cement : 4 coarse sand) laid and jointed with white cement (with pigment) slurry including rubbing and polishing complete. |
| 16 | 25 mm cement concrete flooring 1:2:4 (1 cement: 2 course sand: 4 graded stone aggregate of size 12.5mm and above) by laid over base concrete finished with floating coat of neat cement ( base concrete to be paid separetely) including fixing of glass strips.(Excluding cost of glass strips) Page-49 Si no-14.69 |
| 17 | Fixing panes of 4 mm thick glass with and including Atul or equivalent ISI mark quality putty and brads and spring and including supply of all materials labour and tools & plants, etc. required for proper completion of the work but excluding cost of glass.SI No.812(b) |
| 18 | One priming coat and two coat oil distemper on new work including supply of all materials, labour and T&P etc. required for proper completion of work.SI No.649+650 |
| 19 | Supply and fixing the Steel railling in the ramp with fixing of hold fast including supply of materials T&p etc complete. |
| 20 | RCC work with cement approved coarse sand, and 2cm (3/4\\") gauge, approved stone ballast in the proportion 1:1.5:3 in footing, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. SI. No. 283 (1) |
| 21 | RCC work with cement approved coarse sand, and 2cm (3/4\\") gauge, approved stone ballast in the proportion 1:1.5:3 in Column, excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.I. binding wire, an including necessary cantering and shuttering etc and also including supply of all materials, labour and tools and plants etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. SI. No. 283 (1) |
| 22 | Providing and applying white cement based putty of average thickness 1mm of approved brand and manufacturer over the plastered wall surface to prepare the surface even and smooth complete. SI No-13.26. |
| 23 | Internal electrification Work |
| 24 | Add Gst @ 18 % Please Enable Macros to View BoQ information |