| 1 | Relocation of Old Shed |
| 2 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. |
| 3 | Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or partthereof beyond 5 metres. |
| 4 | Extra for marking of structural steel work required to be re-erected. |
| 5 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metreslead of: G.S. Sheet |
| 6 | Re-fixing of Iron Profile Sheet |
| 7 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 8 | Providingand laying in position cement concreteof specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6(1Cement :3 manufactured sand derived from Recycled Concrete Aggregate (RCA) :6 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA)) |
| 9 | Providingand laying in position cement concreteof specified grade excluding the cost of centeringand shuttering - All work up to plinth level: 1:2:4(1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources) |
| 10 | Covering of Motors on Pontoons |
| 11 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 12 | Providing and fixing precoated galvanised iron profile sheets (size,shape and pitch of corrugation as approved by Engineer-in-charge) 0.50mm(+0.05%) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240mpa steel grade,5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metreoras desired by Engineer- in-charge.The sheet shall be fixed using self drilling/ self tapping screws of size(5.5x55mm) with EPDM seal, complete up to any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafter sand trusses and including cutting to size and shape wherever required. |
| 13 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |