|
| 1 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductor in rolls |
| 2 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductor in rolls |
| 3 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 4 | Providing WP support with PSC pole incl.digging &backfilling pit |
| 5 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays strut etc and stacking the same |
| 6 | Providing Stay for LT poles incl. digging & back filling pit. |
| 7 | Providing Strut using LT PSC Pole incl. digging & backfilling pit |
| 8 | Renewal of existing damaged/broken old LT stay with existing stay rod |
| 9 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 10 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 11 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 12 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles(Running km) |
| 13 | Dismantling and reconnecting Sph service connection from the OH line incl.lowering down the WP portion |
| 14 | Dismantling and reconnecting 3ph service connection from the OH line incl.lowering down the WP portion |
| 15 | Erecting one LT PSC pole in position incl.digging &backfilling pit |
| 16 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Rock |
| 17 | Replacing/inserting LT stay insulator on the existing stay |
| 18 | Straighting one slanted LT pole after unbinding the line and rebinding the line after work |
| 19 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole. |
| 20 | Reshackling one span LT Sph 2 wire OH line ,replacing insulators,tightening stay,cutting tree branches incl.conveyance |
| 21 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 22 | Transporting LT ABC by hired vehicle to a distance up to 5km and carring upto 2 drum including loading and unloading using crane |
| 23 | Stringing of 1.1 kV Aerial bunched cable of size 3x70+1x16+1x50 sqmm with bare/insulated Messenger through existing poles |
| 24 | Erection of Suspension clamp for LT ABC of any size |
| 25 | Erection of Anchor clamp/dead end clamp for LT ABC of any size |
| 26 | Installation of insulation piercing connector for main to service line main:16-95sqmm,Tap 4-35sqmm |
| 27 | Installing One No.4 way satellite connector of size Main 16 to 95 Tap 4 to 35 sqmm to the LT AB cable of standard size |
| 28 | Fitting one No.Section fuse on LT line with dropping cables,crimping sockets,connecting with bolt&nut etc |
| 29 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 30 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 31 | Providing End Caps |
| 32 | Providing Cable Tie |
| 33 | Fitting of One No pole top service connection box of standard size(upto 4 way) using SS strap/B&N of suitable size in to the PSC/ A pole at the standard height excluding giving connectings |
| 34 | Installing one No 4 way satellite connector of size Main 16 to 95 Tap 4 to 35 sqmm to the LT AB cable of standard size |
| 35 | Quoted Amount of BOQ1 in figures |
| 36 | GST Rate in percentage Please Enable Macros to View BoQ information |