|
| 1 | E/W excavation for foundation in Hard soil with an initial lead and lift including rough,dressing & levelling complete. |
| 2 | Sand filling in found. & plinth with well watered and rammed with all cost,conveyance,royalty etc. complete. |
| 3 | PCC (1:3:6) with 40 mm HG(hb) metal in found & plinth all etc. complete. |
| 4 | Plain cement concrete (1:2:4) nominal mix in foundation as per Drawing and Technical Specification |
| 5 | Brick work with Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in plinth and foundation including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete |
| 6 | Brick work with Fly ash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in Superstructure including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete |
| 7 | RCC M20 grade with 20mm & down graded 10mm chips with all cost,conveyance royalty etc. complete. (A). Grade Beam |
| 8 | Column Base |
| 9 | Column |
| 10 | Lintel |
| 11 | Wall Beam |
| 12 | Roof slab |
| 13 | CHAJJA |
| 14 | Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. |
| 15 | 16 mm thick C.P in C.M(1:6) over brick work with all cost,conveyance royalty etc. complete. |
| 16 | 12 mm thick C.P in C.M(1:6) over brick work with all cost,conveyance royalty etc. complete. |
| 17 | 6 mm thick C.P in C.M(1:4) to RCC surface etc. complete. |
| 18 | 12 mm thick cement plaster (1:4) finished smooth with cemenmt punning in Ground Floor |
| 19 | 20 mm thick cement plaster (1:4) finished smooth in Ground Floor |
| 20 | 2.5 cm thick AS Flooring (1:2:4) with 12mm & down grades size hard granite crusher broken chips on new work in Ground Floor |
| 21 | Supplying ,fitting and fixing vertrifed tiles in floors,treads or steps of size 600mm x 600mm of approved make conforming to IS: 13755 laid on 20mm thick cement mortar (1:4) (1 cement : 4 cource sand) and filling joints with white cement of approved quality including cost of materials, labour T&P etc required for the work all complete |
| 22 | Supplying ,fitting and fixing vertrifed tiles in floors,treads or steps of size 600mm x 600mm of approved make conforming to IS: 13755 laid on 20mm thick cement mortar (1:4) (1 cement : 4 cource sand) and filling joints with white cement of approved quality including cost of materials, labour T&P etc required for the work all complete |
| 23 | Fixing glazzed tiles (30cmx30cm / 40cm x 40cm special plain/printed series ceramic tiles of premium grade having thickness 7 mm to 8mm confirming to IS 13755) in floors treads or steps and landing on 20 mm thick bed of cement mortar 1:4 (1cement : 4sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost of tiles.conveyance, taxes & royalties of all materials, labour with T&P complete in all respect.(Data for 10 Sqm ) |
| 24 | Fixing glazzed tiles (20cmx30cm / 20cm x 20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shades of the tiles including cost of tiles. |
| 25 | Supplying, fitting and fixing of MS shutter Door & Window |
| 26 | Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials labour T & P etc. as per direction of Engineer -In -charge. in Ground Floor |
| 27 | Priming one coat with wall based primer including cost of primer etc complete. |
| 28 | Wall painting 2 coats with plastic emulation paintof approved shade on old work 2 coat to give an even shade including cost of paint. |
| 29 | Wall painting 2 coats with Weather Coat paintof approved shade on old work 2 coat to give an even shade including cost of paint. |
| 30 | Painting 2 coats with any approved paint in iron works including sand papering, polishing surfaces, cost of paints, cost of all labour, T&P, etc complete |
| 31 | Supplying Fitting, fixing up fully glazed aluminium framed window (sliding type) made up aluminium section 9778 as window frame, section 4095, 4096 and 9777, 3994 as shutter frame with 5mm black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of all materials, all taxes, labour, T&P excluding cost of glass etc. complete as per direction of the Engineer-in-charge |
| 32 | Cost , supplying, fitting & fixing of bathroom fiber door of approved make including fibre choukatha all GI fitting all cost conveyance etc complete Please Enable Macros to View BoQ information |