| 1 | Dismantling G.C.I. or A.C. sheet roofing after carefully removing the bolts and nuts including stacking of he materials for reuse and removing the debris within 50m lead |
| 2 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse andremoving the debris within 50m lead |
| 3 | Dismantling and removing Grading Plaster from roof slab cleaning the surface lowering and removing the debris within 50m lead |
| 4 | Dismantling and removing 2.5 cm AS Flooring cleaning the surface lowering and removing the debris within 50m lead |
| 5 | Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead |
| 6 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead |
| 7 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead |
| 8 | Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead |
| 9 | Earth work in excavation of foundation in Stony Earth within initial lead and lift including rough dressing and breaking clods etc. complete. |
| 10 | Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge |
| 11 | C.C. of prop (1:3:6)) using 4mm size H.G.C.B metal for approved quality & from approved quarry including lowering, laying the concrete, watering and curing etc. complete to required levels laid in layers including cost conveyance, royalities & taxes of all mateirals & cost of all labour with T & P etc all complete in all respect as per Direction of the Engineer in charge. |
| 12 | R.C.C work of M-20 grade with 20mm and down grade C.B chips including hoisting & laying including Centaring Shutring,cost,carriage and royalty , tax of materials s including all cost and Centering, Shuttrering etc., complete GROUND FLOOR |
| 13 | Plinth Bend |
| 14 | Column and Beam |
| 15 | Stair |
| 16 | Slab and Chajja |
| 17 | FIRST FLOOR Column and Beam |
| 18 | Lintel |
| 19 | Roof slab and chajja |
| 20 | Providing HYSD Bar reinforcement for R.C.C work including straighting, cutting, binding, welding, tying the grills,laying and placeing the proper position as per approved design and drawing including cost,conveyancye of 18 to 20 gauge binding wire cost and conveyance HYSD bars complete in all respect as per specification for road and bridge and direction of engineers in charge. GRPOND Floor |
| 21 | FIRST FLOOR |
| 22 | Fly Ash brick masonry in cm(1:6) for foundation and plinth with all cost, Carriage, Royality etc. complete. |
| 23 | Fly Ash brick masonry in cm(1:6) in Super Structure with all cost, Carriage, Royality etc. complete. GROUND FLOOR |
| 24 | FIRST FLOOR |
| 25 | 16mm thick C.P in cm (1:6) over Brick work with all cost, carriage,Royality etc. complete. |
| 26 | FIRST FLOOR |
| 27 | 12mm thick C.P in cm (1:6) over Brick work with all cost, carriage,Royality etc. complete. GROUND FLOOR |
| 28 | FIRST FLOOR |
| 29 | 6mm thick C.P in cm (1:4) over R.c.c works to make surface smoot with all cost, carriage,Royality etc. complete. GROUND FLOOR |
| 30 | FIRST FLOOR |
| 31 | Iron work wrought and put up in grated doors, windows and cage latrines |
| 32 | Painting 2 coats with synthetic enamal paint on new wood work or steel work including all cost etc. complete. |
| 33 | FIRST FLOOR Window |
| 34 | Supplying all materials, labour, T&P and Wall painting two coats with Distemper with one coat of primer of approved shade on new work to give an even shade including all cost etc complete. GROUND FLOOR |
| 35 | FIRST FLOOR |
| 36 | Supplying all materials, labour, T&P and finishing walls with water proofing weather coat of approved shade on new work two coats to give an even shade etc all complete as per specification and direction of the E.I.C |
| 37 | FIRST FLOOR |
| 38 | Providing fitting fixing of GI sheet on roof etc. complete but excluding cost of fitting including drilling holes in wind tiles. |
| 39 | Labour for fixing of AC sheet in roof including all cost etc complete. |
| 40 | 4cm grading concrete (1:2:4) on roof slab with 12 |
| 41 | 2.5cm grading concrete (1:2:2) on roof slab with 6mm chips Ground Floor |
| 42 | First Floor |
| 43 | 2.5cm artificial stone flooring with cementconcrete (1:2:4) including punning using 12mm size broken granites chips including all cost etc conplete. |
| 44 | FIRST FLOOR |
| 45 | Cement Punning |
| 46 | Fixing Vetrified tiles in Floors,treads and Landing on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tiles. |
| 47 | Fixing Vetrified tiles in dados,skirting and in rises of step on 25mm thick bed of cement mortar (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tiles. |
| 48 | Supplying fitting fixing of Stainless Steel of 304 garde in hand Railing using 50 mm dia 2mm thick circular Pipe with Balustrade of size 32mm x 32mm x 2mm in 3row in stair case ae per approved design and sprcification , blufing ,polishing etc with cost conveyance taxes of all materials labour T&P etc required for all complete in all respect. Please Enable Macros to View BoQ information |