| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. |
| 2 | Lime Concrete, cement concrete grade M-10 (1:5:10) and below |
| 3 | pillers |
| 4 | Cement Concrete Grade M-15 and above and PCC blocks |
| 5 | Dismantling Stone Masonry |
| 6 | Dismantling stone slab roofing over wooden karries or R.C.C. battens (dismantling karries and battens to be paid for separately) including stacking of serviceable material and disposal of unserviceable material within 50 metres lead |
| 7 | Demolishing mud phaska in terracing and disposal of material within 50 metres lead. |
| 8 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : |
| 10 | 1:3:6 (1 Cement : 3 fine/ coarse sand : 6 graded stone aggregate 20 mm nominal size). |
| 11 | piller |
| 12 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 13 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar |
| 14 | M-20 Grade Concrete (1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) -As per design mix) |
| 15 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. |
| 16 | Thermo-Mechanically Treated bars. |
| 17 | Random rubble masonry with hard stone in foundation and plinth : |
| 18 | 1) Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 19 | Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories. |
| 20 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : |
| 21 | Suspended floors, roofs, landings, balconies and access platform. |
| 22 | Providing and fixing stone Patties (slab) on roofing including removing broken patties carefully and replacement new slab with Kharanja, ralthal and lime dhar as per traditional practice. Span about 3.30 mtr. To 5.50 mtr. 100 mm to 150 mm thick of approved stone. |
| 23 | Tuman masonry by brick bats/ stones in grinded mortar of Lime Surkhi mortar 1:2/lime sand mortar 1:2 including racking and removal of all old loose plaster and cleaning the wall surface properly as per direction of Engineer In-charge. |
| 24 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately For the purpose of measurement the entire treated surface will be measured. |
| 25 | Propping with steel to support the leaned structure ( roof and wall) using pipes, channels, angles, girders , wooden wages to prevent further leaning/ collapse ,mode of measurement( 1.the plan area of the propping shall be for payment purpose. 2. the payment will be made once only for execution of all item such work. ) |
| 26 | Providing and fixing fine dressed sand stone \\" Gardana of sand Stone \\" on top of the wall at varandha as per existing matching , fixing in grinded lime surkhi mortar 1:2 including pointing in cream and stone powder 1:1 with an admixture of pigment to match the shade of stone complete in all respect. above 100 mm to 150 mm thick plain with fine dressing. |
| 27 | P & L Lime Surkhi Plaster lime surkhi mortar 1:2 (1 Lime : 2 Surkhi) including preparation of mortar by traditional practice (by grinding) in specified course for base coarse and subsequent course & Loi, tamping, beating, curing till the shrinkage cracks are disappear. The work is to be done with all lead as the work is of restoration nature as per Jaipur practice including adding gur, methi & gugal on old walls including removal of all old loose and decade plaster, each coat to be done after 3 days of previous coat. |
| 28 | 33 mm thick in four coats |
| 29 | Khamira Colour Washing as per old traditional practice to prepare the Khamira the lime should be slaked at least for 7-10 days and regularly it should be stirred by adding cured, Gugal, for non-synthetic colour adding gum (babool gum) as per specification. Then applying prepared solution on walls three to four thin coats as desired finishing. |
| 30 | Providing & applying Lime kara 1:2 (1lime cream : 2 Zikki powder) grinding mortar with grinding mill/manually on lime base, on ceiling and all flat surface in two coats. First coat applying 3 mm to 4 mm thick and curing properly at least 7 days, second finishing coat done after 7 days of previous coat as per traditional practice.(thickness not more than 6 mm.) |
| 31 | Stucco work in lime, Surkhi, mortar (1:2) as per existing design work/ traditional practices by skilled craftsman, the stucco work should be done as per restoration nature, the mortar should be prepared by grinding mill adding gur, methi & gugal.. The thickness varies from 50 mm to 100mm as per the design (minimum rectangular surface area to be measured). |
| 32 | Providing and fixing of reinforced Ferro-Cement drain covers designed for ‘AA‘ class loading duly marked on cover with adequate steel reinforcement having thickness 75mm to 150mm anti corrosive bitumen painted M.S. plate , Rim and M.S. lifting hooks, Admixtures like plasticizer, bond improving compound, shrinkage, resistance compound, abrasion resistant complete as per approved design etc. |
| 33 | 4) Standard Size 2100x500mm (150mm thick) for span 1201 to 1500mm |
| 34 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. |
| 35 | 2) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 36 | Providing and laying un-reinforced, dowel jointed, plain cement concrete mix With Concrete Mixer & vibrator pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed as per approved mix design, laid, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures (if required) as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 37 | PCC M-20 |
| 38 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 15 mm cement plaster on the rough side of single or half brick wall of mix : |
| 39 | 2) 1:4(1 cement : 4 fine/ coarse sand) |
| 40 | 40 mm thick fine dressed stone flooring over 20 mm (average) thickbase of cement mortar 1:5 ( 1cement : 5 coarse sand) with joints finished flush. |
| 41 | Red sand stone |
| 42 | CARRIAGE OF MATERIALS (By Mechanical Means): Carriage of Materials by mechanical transport including loading, unloading and stacking :: The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under subhead \\"Carriage of Materials\\" |
| 43 | 2) Sand, bazri, ballast, kankar |
| 44 | E) 5 Km |
| 45 | F) Beyond 5 Km upto 10 Km. per Km. |
| 46 | Providing and fixing on wall face Unplasticised Rigid PVC Single socketed pipes rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion |
| 47 | 110 mm diameter |
| 48 | Providing and fixing on wall face Unplasticised - PVC moulded fittings/ accessories for Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. |
| 49 | Bend 87.5° |
| 50 | 110 mm bend |
| 51 | Finishing walls with Acrylic Smooth exterior paint of required shade : |
| 52 | New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm |
| 53 | Finishing walls with Acrylic Smooth exterior paint of required shade: Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface). |
| 54 | Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete Please Enable Macros to View BoQ information |