|
| 1 | Cleaning and Sweeping of floor of non-residence with broom, cloth etc. including wet wash with Phenyl or approved Germicide material and disposal of refused material in dustbin of beyond 50 mtr. from the area cleaned. | Cleaning and Sweeping of floor of non-residence with broom, cloth etc. including wet wash with Phenyl or approved Germicide material and disposal of refused material in dustbin of beyond 50 mtr. from the area cleaned. |
| 2 | Cleaning of roads and their side patteries including sweeping, removing garbage and vegetation from patteries, if any and its disposal to dust bins. | Cleaning of roads and their side patteries including sweeping, removing garbage and vegetation from patteries, if any and its disposal to dust bins. |
| 3 | Cleaning of toilets of non-residential buildings including cost of detergent powder, harpic phenyl and suitable acid etc. as required for proper completion of the work | Cleaning of toilets of non-residential buildings including cost of detergent powder, harpic phenyl and suitable acid etc. as required for proper completion of the work |
| 4 | Supply of Dustbin (Small size) | Supply of Dustbin (Small size) |
| 5 | Supply of Dustbin (Large Size ) | Supply of Dustbin (Large Size ) |
| 6 | Cleaning and opening of chocked W.C./bath/ kitchen pipe line including opening and refixing of chamber cover including washing etc. complete | Cleaning and opening of chocked W.C./bath/ kitchen pipe line including opening and refixing of chamber cover including washing etc. complete |
| 7 | Cleaning of septic tank including disposal of waste outside the UPPCL area as per direction of the Engineer-in-charge including cost of all labour, T&P etc. required for proper completion of the work | Cleaning of septic tank including disposal of waste outside the UPPCL area as per direction of the Engineer-in-charge including cost of all labour, T&P etc. required for proper completion of the work |
| 8 | Same as above but for inspection chamber | Same as above but for inspection chamber |
| 9 | Disposal of rubbish/ debris outside the UPPCL area as per direction of Er/ in charge including cartage, labour and materials, T&P etc. required for proper completion of the work (No. deduction for voids shall be made). | Disposal of rubbish/ debris outside the UPPCL area as per direction of Er/ in charge including cartage, labour and materials, T&P etc. required for proper completion of the work (No. deduction for voids shall be made). |
| 10 | Supply and sprinkling of lime in all drains of colony and water logged area including cost of all labour, materials, and T&P etc., as required for proper completion of the work | Supply and sprinkling of lime in all drains of colony and water logged area including cost of all labour, materials, and T&P etc., as required for proper completion of the work |
| 11 | Cleaning panes of glass with spirit of caustic soda including supply of all materials, labour and T&P etc. required for proper completion of the work | Cleaning panes of glass with spirit of caustic soda including supply of all materials, labour and T&P etc. required for proper completion of the work |
| 12 | Maintenance of Lawn area Inside scada building and adjoining area including deputation of mali for 365 days with all neccessary T&P and machine/fuel provided by contractor. work to be executed under supervision of engineer incharge | Maintenance of Lawn area Inside scada building and adjoining area including deputation of mali for 365 days with all neccessary T&P and machine/fuel provided by contractor. work to be executed under supervision of engineer incharge |
| 13 | Dress for cleaning staff | Dress for cleaning staff |