| Sl. No. | Item Description |
| 1 | Earthwork in excavation upto 1.50mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in following types of soil including moorum, hard stony earth, earth mixed with boulders, DI rocks etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. In all kinds of soil |
| 2 | In DI rock |
| 3 | Earthwork in excavation beyond 1.50mtr and upto 3.00mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in following types of soil including moorum, hard stony earth, earth mixed with boulders, DI rock etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. In all kinds of soil |
| 4 | In DI rock |
| 5 | Filling foundation trenches and plinth with excavated earth including laying the earth in layers not exceeding 23.5cm (9”) thick ramming and watering with all leads and lifts including cost of all labour, T&P etc. complete as directed by the Engineer-in-charge. |
| 6 | Supplying and filling the Foundation & Plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per direction of the Engineer-in-charge |
| 7 | Providing & laying cement concrete of prop. (1:4:8) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 100 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge. |
| 8 | R.C.C. work of M-30 for foundation having minimum compressive strength of 300kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. |
| 9 | R.C.C. work of M-25 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. |
| 10 | R.C.C. work of M-30 for column having minimum compressive strength of 300kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Ground Floor |
| 11 | First Floor |
| 12 | Second Floor |
| 13 | Third Floor |
| 14 | Fourth Floor |
| 15 | Terrace |
| 16 | R.C.C. work of M-25 for beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Ground Floor |
| 17 | First Floor |
| 18 | Second Floor |
| 19 | Third Floor |
| 20 | Fourth Floor |
| 21 | Terrace |
| 22 | R.C.C. work of M-25 for lintel having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Ground Floor |
| 23 | First Floor |
| 24 | Second Floor |
| 25 | Third Floor |
| 26 | Fourth Floor |
| 27 | R.C.C. work of M-25 for roof slab having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Ground Floor |
| 28 | First Floor |
| 29 | Second Floor |
| 30 | Third Floor |
| 31 | Fourth Floor |
| 32 | Terrace |
| 33 | R.C.C. work of M-25 for staircase having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Ground Floor |
| 34 | First Floor |
| 35 | Second Floor |
| 36 | Third Floor |
| 37 | Fourth Floor |
| 38 | R.C.C. work of M-25 for chajja having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Ground Floor |
| 39 | First Floor |
| 40 | Second Floor |
| 41 | Third Floor |
| 42 | Fourth Floor |
| 43 | Providing & fixing TOR Fe-500D grade reinforcement bars of approved makes as per DTCN for RCC work of required diameter with straightening, cutting, bending, binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost, conveyance and taxes of tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the drawing, design and direction of Engineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.) Ground Floor |
| 44 | First Floor |
| 45 | Second Floor |
| 46 | Third Floor |
| 47 | Fourth Floor |
| 48 | Terrace |
| 49 | Brick work in foundation and plinth with flyash bricks of size 20x10x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer in charge. |
| 50 | Brick work in superstructure with flyash bricks of size 20x10x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer in charge. Ground Floor |
| 51 | First Floor |
| 52 | Second Floor |
| 53 | Third Floor |
| 54 | Fourth Floor |
| 55 | Terrace |
| 56 | Brick work in superstructure with flyash bricks of size 20x10x8cm in cement mortar (1:4) with best quality bricks having crushing strength not less than 75 Kg/cm2 imersing the bricks in water for not less than 6 hours before use (the bricks shall be well burnt, free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer in charge. Ground Floor |
| 57 | First Floor |
| 58 | Second Floor |
| 59 | Third Floor |
| 60 | Fourth Floor |
| 61 | 25 mm. average thick artificial stone flooring with cement punning laid to proper slope with cement concrete of proportion (1:2:4) using and with screened and washed sharp sand for mortar with black hard crusher broken granite stone chips of approved quality and from approved quarry, washed and cleaned laid in two layers i.e. the bottom layer being 19 mm . thick and top layer of 6mm. thick with 12mm. to 20. size black hard crusher broken stone chips (20mm size chips not to exceed 25%) including chipping and chiseling and cleaning the top surface of the floor slabs in upper floors, including rounding of corners, watering and curing with cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge. Ground Floor |
| 62 | First Floor |
| 63 | Second Floor |
| 64 | Third Floor |
| 65 | Fourth Floor |
| 66 | Terrace |
| 67 | Providing 12mm. thick cement plaster with cement mortar of mix (1:4) in all floors with Portland slag cement (PSC) and with screened and washed sharp sand for mortar with neat cement punning finished smooth to brick walls in dadoes and skirting after racking out the joints including watering and curing complete with cost, conveyance, loading and unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P, scaffolding required for the work etc. complete in all respect as directed by the Engineer-in-Charge. Ground Floor |
| 68 | First Floor |
| 69 | Second Floor |
| 70 | Third Floor |
| 71 | Fourth Floor |
| 72 | Terrace |
| 73 | Providing codappa flooring of approved quality and size in floors, kitchen platform etc in all floors at all height on 25mm thick bed of cement mortar of mix (1:1) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with neat white cement slurry jointing the tile with neat white cement slurry mixed with required quantities of pigments of approved marks to match the shades of the codappa tile if required watering and curing for 21 days, including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work including rubbing mechanically and wax polishing etc. complete in all respect as per specification and direction of Engineer-in-charge. Ground Floor |
| 74 | First Floor |
| 75 | Second Floor |
| 76 | Third Floor |
| 77 | Fourth Floor |
| 78 | Supplying, fitting and fixing of stair case balustreads & hand rail made out of 16mm square bar for balustreads & 50mm dia G.I pipe for hand rail etc. including cost of all materials fabricating & fixing to steps & floors by welding at site etc. complete in all floors including cost, conveyance, taxes of all materials, labour, T&P etc.required for the complete in all respect as per direction of Engineer-in-charge. (Weight certificate way measurement will be produce at the time of bill) |
| 79 | Supplying, fitting and fixing of MS openable shutter with 40 x 40 x 6mm size M.S. angle frame as chowkath and 35x35x5mm Ms frame for shutter with 25x6mm flat fabricated to proper size of door opening with 16 gauge CR sheet including fixing clamps for door frames and hinges for fixing shutters etc. complete for all floors including cost, conveyance, taxes of all materials, labour, T&P etc.required for the work etc. complete in all respect as per direction of Engineer-in-charge. |
| 80 | Supplying, fitting & fixing of window grill to be fixed into the walls etc. made up of 30 x 30 x 5mm size M.S angle frames with internal grills of 20 x 5mm M.S flats etc. complete for all floors as per approved drawing and design, cutting to required size and welding properly, finished smooth and sand papering, painting one coat with red oxide primer, including cost, conveyance, taxes of all materials, T&P etc. as required for the work complete as per direction of the Engineer-in-charge. (Weight certificate way measurement will be produce at the time of bill) |
| 81 | Providing 25mm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of 6mm size black hard crusher broken granite chips with addition of water proofing compound of approved quality to be mixed with specified ratio including watering, curing, cost, conveyance, royalties, taxes of all materials, cost of all labour, T&P etc. complete as required for the finished item of work as directed by the Engineer-in-charge. Fourth Floor |
| 82 | Terrace |
| 83 | Providing and fixing 5mm thick glass pane of approved quality in ventilator including cost of all materials, labours, T&P etc complete as per direction of Engineer-in-charge. |
| 84 | Providing 12mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) finished smooth to outside smooth surface of brick masonry walls after racking out the joints including watering and curing, rounding of corners etc. complete with cost, coveyance, loading and unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge. Ground Floor |
| 85 | First Floor |
| 86 | Second Floor |
| 87 | Third Floor |
| 88 | Fourth Floor |
| 89 | Terrace |
| 90 | Providing 12mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) finished smooth to inside smooth surface of brick masonry walls after racking out the joints including watering and curing, rounding of corners etc. complete with cost, coveyance, loading and unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P and scaffolding required for the work etc. complete in all respect as desired by the Engineer in charge. Ground Floor |
| 91 | First Floor |
| 92 | Second Floor |
| 93 | Third Floor |
| 94 | Fourth Floor |
| 95 | Providing 16 mm. thick cement plaster in all floors at all height with cement mortar of mix (1:6) finished smooth to inside surface of brick masonry walls after racking out joints including watering and curing rounding of corners etc. complete with cost, coveyance, loading and unloading, royalties and taxes of all materials and cost of all labour, T&P, sundries and scaffolding required for the work etc. with providing grooves as directed by the Engineer in charge. Ground Floor |
| 96 | First Floor |
| 97 | Second Floor |
| 98 | Third Floor |
| 99 | Fourth Floor |
| 100 | Terrace |
| 101 | Providing 6mm thick plaster in C.M. (1:4) over ceiling, chajja, loft, staircase, column, beams and walls after removing the false if necessary and close deep chipping including rounding of the corners, recess and roughening concrete surface where necessary, watering and curing, finished smooth over R.C.C. surface, including cost, conveyance, royalty, taxes of all materials, cost of all labour, T&P etc. complete as per direction of the Engineer-in-charge. Terrace |
| 102 | Providing and painting two coats with water proofing cement paint over a coat of cement wash of approved quality and approved shade in all floors at all height by making the surface to the internal plastered surface of wall smooth including cost, coveyance, loading and unloading and taxes of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge. Ground Floor |
| 103 | First Floor |
| 104 | Second Floor |
| 105 | Third Floor |
| 106 | Fourth Floor |
| 107 | Terrace |
| 108 | Painting to external surface of building with two coats of water proofing cement paint over a coat of cement wash of approved shade and quality of approved design, after cleaning by watering & removing the dirts etc. to the surface to be painted including watering, curing, cost, conveyance and taxes of all materials, cost of all labour, brushes, T&P etc. and necessary scaffolding work complete as directed by the Engineer-in-charge. Ground Floor |
| 109 | First Floor |
| 110 | Second Floor |
| 111 | Third Floor |
| 112 | Fourth Floor |
| 113 | Terrace |
| 114 | Providing and painting two coats with synthetic enamel paint over a coat of red oxide primer of approved quality and approved shade confirmming to ISI on steel work to give an even shade in all floors at all height including sand papering and making the surface smooth with cost, coveyance, loading and unloading, and taxes of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by Engineer-in-charge. Ground Floor |
| 115 | First Floor |
| 116 | Second Floor |
| 117 | Third Floor |
| 118 | Fourth Floor |
| 119 | Terrace |
| 120 | Supplying all labour, T&P for the Carriage of excavated earth by mechanical means of transport within 5.00 K.M. lead including hire and running charges of vehicles, labour charges for loading and unloading as required for the work etc. complete as per the direction of the Engineer-in-charge. |
| 121 | INTPH Supplying all materials, labour and T&P for fitting and fixing white glazed vitreous china porcelain Orissa pattern water closet of size 580 x 440mm of approved make confirming to IS-2556 and top inlet for sinking into floor with 100mm PVC 'P' trap etc. including supply of necessary cement concrete for fitting the closet etc. complete in all respect in all floors including cost, conveyance and taxes of all materials etc. complete and as per PH specification and direction of Engineer-in-charge. |
| 122 | Supplying all material, labour T&P and fixtures for providing and fixing of white glazed vitreous chinaware corner wash hand basin of approved make with 32mm dia waste pipe, CP waste coupling nut and 15mm x 450mm PVC connection pipe of approved quality with MS bracket with wooden plugs CP screws including cost of cement, sand, labour, T&P etc. complete including testing cost, conveyance, royalty and taxes of all materials etc. complete as per PH specification and direction of Engineer-in-charge. |
| 123 | Supplying all materials, labor T&P for fitting and fixing in all floors' fixed type glass mirror of size 600mm x 450mm best INDIAN make of 5.5 mm thickness with supply of 13mm thick asbestos backing and wooden plugs C. P. Brass screw including cost, conveyance, royalty, taxes of all materials complete as per P.H. specification and direction of Engineering-in-charge. |
| 124 | Supplying all materials, labour, T&P and fixing standard sized Bib cock of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. Short Body |
| 125 | Long Body |
| 126 | Supplying all materials, labour, T&P and fixing standard sized 15mm dia Angular Stop cock of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. |
| 127 | Supplying all materials, labour, T&P and fixing standard sized 15mm dia concealed Stop cock of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. |
| 128 | Supplying all materials, labour, T&P and fixing standard sized CP Soap case of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. |
| 129 | Supplying all materials, labour, T&P and fixing standard sized CP towel ring of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. |
| 130 | Supplying all materials, labour, T&P and fixing of 150x150mm CP overhead shower with arm of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. |
| 131 | Supplying all materials, labour, T&P and fixing standard sized pillar cock of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. |
| 132 | Supplying all materials, labour, T&P and fixing standard sized push cock of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. |
| 133 | Supplying all material, labour T&P and fixtures for providing and fixing of stain less steel sink of size 535x460mm of approved make with its components like 40mm CP waste, 40mm waste pipe etc, including all requisite fixing materials complete as per the PH specification and direction of Engineer-in-charge |
| 134 | Supplying all materials, labour, T&P and fixing standard sized sink cock of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. |
| 135 | Providing and fixing circular type stainless steel jalli (grating) with hole for floor /nahani trap etc complete as per PH specification and direction of the engineer in charge |
| 136 | Supplying all materials, labours, T&P and fitting and fixing of the following size of CPVC pipe confirming to IS 15778 certification mark with socket and screw joints in walls and floors including supplying of required number of fittings of approved make including cutting threads to pipes and pipes to length, including wastage,etc for fitting to the walls with supply of holder ats, clamps, fixing wooden plugs in walls, including testing of pipe line for water tightness complete as per IS specification including cost, conveyance and taxes of all materials all complete as per PH specification and direction of Engineer-in-charge. 15 mm dia |
| 137 | 20 mm dia |
| 138 | 25 mm dia |
| 139 | 32 mm dia |
| 140 | 40mm dia |
| 141 | Supplying all materials, labours, T&P, fitting and jointing of following dia GI pipe confirming to IS 1239, medium class having IS mark of approved make with socket and screw joint including supply, fitting and fixing of required number of IS certified fitting, cutting threads to pipe and pipes to length including wastage providing necessary offsets and lay screw with extra socket and jam nut including fixing to wall and floors with supply of holder bats, clamps, fixing wooden plugs in walls complete as per PH specification and direction of Engineer-in-charge. 32mm Dia |
| 142 | 40mm Dia |
| 143 | Supplying all materials, labour, T&P, fitting and fixing UPVC SWR pipes & fittings of approved make confirming to IS-13592, both below and above ground level / floor and on walls including supply of bobbins, nains, screws, wooden cleats, pipe clips as per requirement, including earth work in excavation and fitting, including cuting walls and floor and making good the damages with cement concrete (1:2:4) with hard granite chips, incluidng scaffolding wherever necessary all complete as per the PH specification and direction of the Engineer-in-charge. 75mm dia |
| 144 | 110mm dia |
| 145 | Supplying all materials, labour, T&P, fitting and fixing 100mm dia HCI pipes & fittings of approved make confirming to IS-1729-1964, both below and above ground level / floor and on walls including supply of bobbins, nains, screws, wooden cleats, pipe clips as per requirement, including earth work in excavation and fitting, including cuting walls and floor and making good the damages with cement concrete (1:2:4) with hard granite chips, incluidng scaffolding wherever necessary all complete as per the PH specification and direction of Engineer-in-charge. |
| 146 | Supplying all materials, labour, T&P, fitting and fixing of UPVC SWR fittings of approved make with requisite testing etc complete as per PH specification and direction of Engineer-in-charge.110mm dia Single Junction with door |
| 147 | 110mm dia Cowl |
| 148 | 110mm dia Plain Bend |
| 149 | 110mm dia SWR Door Bend |
| 150 | 125mm x 110mm Gulley Trap |
| 151 | 75mm dia Plain Bend |
| 152 | Supplying all materials, labour, T&P, fitting and fixing of HCI SWR fittings of approved make with requisite testing etc complete as per PH specification and direction of Engineer-in-charge. 110mm dia Single Junction with door |
| 153 | 110mm dia Cowl |
| 154 | 110mm dia Plain Bend |
| 155 | 110mm dia SWR Door Bend |
| 156 | Supplying all materials, labour, T&P, fitting & fixing of different size brass / GM Full way Valve of approved make including supply of all necessary jointing materials such as red lead paint, yarns etc. including cost, conveyance & taxes of all materials, T&P etc. all complete as per P.H. specification and direction of the Engineer-in-charge. 25mm Dia |
| 157 | 32mm Dia |
| 158 | 40mm Dia |
| 159 | Supplying all materials,labours,T&P for cutting holes through existing brickwork including making good the damages in cement mortar (1:4) for taking GI pipes and fittings/PVC pipes and fittings etc all complete as per PH specification and direction of Engineer-in-charge. |
| 160 | Supplying all materials,labours,T&P for cutting holes through existing RCC floors & roofs including making good the damages for taking GI pipes and fittings/PVC pipes and fittings etc all complete as per PH specification and direction of Engineer-in-charge. |
| 161 | Supplying all materials,labours,T&P for cutting grooves in pucca floors and walls for taking GI/PVC pipes and making good the damages as per direction of Engineer-in-charge. |
| 162 | Supplying all materials,labours,T&P for cutting holes through existing brickwork including making good the damages in cement mortar (1:4) for taking SWR/HCI pipes and fittings/PVC pipes and fittings etc all complete as per PH specification and direction of Engineer-in-charge. |
| 163 | Supplying all materials, labour, T&P and fittings and fixing of 5000 ltr capasity Poly Propelene white double layer water storage Tank of approved make confirming to IS 12701-1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jam nuts, fixing ball valve etc including hoisting upto terrace level and placing the tank to the required position etc all complete as per PH specification and direction of Engineer-in-charge. (To provided with brick masonary guard walls which will be paid separately) |
| 164 | Providing and applying high performance torch applied APP based membrane Super Thermolay of 3mm thickness, APP Modified Waterproofing Membrane with Non Woven Polyester mat Reinforcement of 160 GSM Prefabricated& Self finished Five layered design super imposed with 20 micron Thermo fusible Film, by first applying Shalitex Primer (STP Make), Conforming to IS – 3384 @ 0.325 Kg per SQ.m (Oil based) & allowing it to dry & then torching of the membrane with the help of LPG/ Butane gas torch keeping overlapping of 4” at the side & 4” at the bottom & fusing of all the joints by gas torching & troweling with round shape smoll steel trowel & finally finishing & complete in all respect as per Manufacture specification and direction of Engineer-in-charge. |
| 165 | Supplyng all materials, labour, T&P for construction of brick masonary Gulley trap chamber of size 250mm x 250 mm with CI gulley trap, by flyash brick masonry in CM (1:4), CP (1:3) with 150mm x 150mm CI grating including labour and materials for fitting and fixing 100mm dia square mouth CI gully trap with supply of all jointing materials and encasing the gully trap with a block of CC (1:3:6) with 25mm size hard stone metal all complete with providing and fixing of 250mm x 250mm precast RCC cover slab including cost, conveyance, taxes of all materials to site complete as per the PH specification and direction of Engineer-in-charge. |
| 166 | Supplying all materials,labours,T&P for constructing inspection chamber of 900mmx800mmx450mm with cement concrete (1:3:6) on bed with hard granite metal size 40mm and flyash brickwork in cement mortar (1:4) in foundation and plinth, 100mm thick RCC M20 cover slab with supplying fitting and fixing of medium duty SFRC manhole cover, moulding and shaping the channel and benching with cement concrete (1:2:4) using 12mm size hg chips,12mm thick cement plaster in cement mortar (1:3) with punning to inside, cement plaster in CM (1:3) to outside the chamber including centring, shuttering, providing required quantity of MS rods and binding wires for reinforcement, bending, binding, tying the grills and placing in the proper position and drawing and design and PH specification including cost, conveyance, royalty, taxes etc for all materials as per the drawing, design and direction of Engineer-in-charge. |
| 167 | Extra for every additional depth of 0.10mtr or part there of inspection chamber as of previous item of size 900x800mm from 450mm to 900mm depth (data for 0.10 mtr per each) |
| 168 | Supplying all materials,labours,T&P and constructing inspection chamber/manhole of 1200mmx 900mmx900mm with cement concrete (1:3:6) on bed with hard granite metal size 40mm of 150mm thick and flyash brickwork in cement mortar (1:4) in foundation and plinth, 150mm thick RCC M20 cover slab with supplying fitting and fixing of medium duty SFRC manhole cover, moulding and shaping the channel and benching with cement concrete (1:2:4) using 12mm size hg chips,12mm thick cement plaster in cement mortar (1:3) with punning to inside, cement plaster in CM (1:3) to outside the chamber including centring, shuttering, providing required quantity of MS rods and binding wires for reinforcement, bending, binding, tying the grills and placing in the proper position and drawing and design and PH specification including cost, conveyance, royalty, taxes etc for all materials all complete as per the drawing, design and direction of Engineer-in-charge. |
| 169 | Extra for every additional depth of 0.10mtr or part there of inspection chamber as of previous item of size 1200x900mm from 900mm to 2.5mtr depth (data for 0.10 mtr per each) |
| 170 | Construction of circular brick masonary manhole chamber of size 1.20 x 0.90 mtr including cement concrete (1:3:6) in bed by using 40mm size granite metal, brickwork in CM (1:4) in foundation & plinth, cement plastering (1:3) over flyash brick, plastering in CM (1:3) with neat cement punning, CC (1:2:4) over bed for benching and channeling, RCC M20 for roof slab of 150mm thick and supply fitting and fixing SFRC medium duty type cover including cost of centring and shuttering cost of MS rod for RCC work, supplying fitting and fixing of the polypropelen step iron of required interval etc all complete with all cost, conveyance, royalties taxes etc all complete as per direction of Engineer-in-charge. |
| 171 | Extra for every additional depth of 0.10mtr or part there of manhole size 1200x900mm from 1100mm to 1650mm depth (data for 0.10 mtr per each) |
| 172 | Construction of circular brick masonary manhole chamber of size 1.20 x 1.670 mtr including cement concrete (1:3:6) in bed by using 40mm size granite metal, brickwork in CM (1:3) in foundation & plinth, cement plastering (1:3) over flyash brick, plastering in CM (1:3) with neat cement punning, CC (1:2:4) over bed for benching and channeling, RCC M20 for roof slab of 150mm thick and supply fitting and fixing SFRC medium duty type cover including cost of centring and shuttering cost of MS rod for RCC work, supplying fitting and fixing of the polypropelen step iron of required interval etc all complete with all cost, conveyance, royalties taxes etc all complete as per direction of Engineer-in-charge. |
| 173 | Extra for every additional depth of 0.10mtr or part there of manhole size 1200x1670mm from 1650mm to 2300mm depth (data for 0.10 mtr per each) |
| 174 | Supplying all materials, labour, T&P and laying of UPVC SWR pipes & fittings of approved make confirming to IS-13592,in trenches as sewer line including jointing, laying in proper gradient etc all complete as per the PH specification and direction of the Engineer-in-charge. 100mm Dia |
| 175 | 150mm Dia |
| 176 | Supplying all materials, labour, T&P and necessary materials towards laying of RCC NP2 Hume pipe push tight joint type (including cost of RCC Hume pipe) inside the pipeline trench of required size with plastic rope without damage to the pipe with all convenience the materials to site and including all taxes all complete as per direction of Engineer-in-charge. 150mm Dia |
| 177 | 200mm Dia |
| 178 | Providing and laying in trench cement concrete ( 1:4:8 ) with 40mm size hard granite metal in the following type of bedding for pvc pipes of the following internal diameter including curing complete as per specification (A1-Type Bedding) 150mm Dia |
| 179 | 200mm Dia |
| 180 | Supply of all labour, T&P towards excavation of sewage pipe line trench in following kinds of soil within 50 mtr initial lead and 1.5 mtr initial lift including rough dressing and breaching of clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30mtr in depth as per design and drawing and as per direction of Engineer-in-charge. All Kinds of Soil |
| 181 | Hard Rock |
| 182 | Supply of all labour, T&P towards excavation of sewage pipe line trench in DI rock within 50 mtr initial lead and beyond 1.5 mtr initial lift including rough dressing and breaching of clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30mtr in depth as per design and drawing and as per direction of Engineer-in-charge. |
| 183 | Supplying and filling the pipeline trench with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per direction of the Engineer-in-charge. |
| 184 | Filling pipeline trench with excavated earth including laying the earth in layers not exceeding 23.5cm (9”) thick ramming and watering with all leads and lifts including cost of all labour, T&P etc. complete as directed by the Engineer-in-charge. |
| 185 | Supplying all labour, T&P for the Carriage of excavated earth by mechanical means of transport within 5.00 K.M. lead including hire and running charges of vehicles, labour charges for loading and unloading as required for the work etc. complete as per the direction of the Engineer-in-charge. |
| 186 | Providing and laying plain cement concrete of (1:2:4) for mending of sewer line trench using 12 mm. Size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required for the work etc complete as per the instruction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail