|
| 1 | Daily cleaning with broom stick over earth, cement concrete road surface including cost of labours, T&P charges etc as per direction of Engineer-in-Charge. (except Sunday and National holidays). (5153.60 Sqft. X 294 days in a year) |
| 2 | Weekly cleaning with broom stick over earth, cement concrete road surface including cost of labours, T&P charges etc as per direction of Engineer-in-Charge. (except Sunday and National holidays). (75878.50 Sqft. X 52 times in a year) |
| 3 | Bi-monthly disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-Charge, beyond 50 m initial lead, for all leads including all lifts involved. (151.74 Cum X 6 times in a year) |
| 4 | Quarterly cleaning of shrub jungles, uprooting of stumps and small bushes and tree below 1 mtr grith on pre-measurement including staking of waste materials and proper disposal of the same including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. (28713.17 Sqm X 4 times in a year) |
| 5 | Bi-Monthly Cleaning maintenance of old sewerage lines and manholes with disposal of Malba includes complete dewatering and cleaning, flushing of inter connecting pipes, equipment, channels, bottom sludge cleaning, properly disposal of sludge as per direction of engineering-in-charge upto a suitable distance including all machinary, manpower and complete to the satisfactry of Engineer-in-Charge. (1402.50 Rmtr. X 6 times in a year) |
| 6 | Yearly Cleaning of septic tank removal of dirt and disposal of the same away from the township areas as and when required including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. (9142.11 Cft. X 1 time in a year) |
| 7 | Yearly Earth work excavation for temporary drainage systems in different locations in ordinary soil within 50 mtrs. initial lead and 1.5 mtrs. initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30 mtrs in depth & as per direction of Engineer-in-charge. (19.25 Cum X 1 time in a year) |
| 8 | Quarterly cleaning of top roof of building including staking of waste materials and proper disposal of the same including cost of labours, T & P Charges etc. complete in all respect as per direction of Engineer-in-Charge. (122532.19 Sqft. X 4 times in a year) |
| 9 | Daily cleaning with phool jhadu over mosaic, cement marbel floor, tile floor including cost of labours, T&P charges etc as per direction of Engineer-in-Charge.(3659.73 Sqft. X 294 days in a year) |
| 10 | Daily cleaning with long head mop soaked with scented phenyl over cement floor, mosaic floor, marbel floor, tile floor including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. (except Sundays & National Holidays) (3659.78 Sqft. X 294 days in a year) |
| 11 | Daily cleaning of lavatory floor with brush and phenyl water including cost of labours, T&P charges etc. complete in all respect as per direction of Engineer-in-Charge. (439.00 Sqft. X 294 days in a year) |
| 12 | Bi-Monthly cleaning of Spider nets and other dirts of side wall and ceiling by broom stick and removing of the dust from the floor including cost of labours, T&P charges etc complete in all respect as per direction of EIC. (8611.17 Sqft. X 6 times in a year) |
| 13 | Annual Maintenance Contract of landscape and garden including the man power for cutting of grass (lawns) and hedges, removal of weeds, replacing of unhealthy and dead plants, spraying of insecticides, manuaring and fertilizers, regular watering etc. at GM office and Guest House, CHEP, Chiplima complete as per direction of Engineer-in-Charge. (7639.70 Sqft. X 294 days in a year) |
| 14 | COST OF MATERIALS |
| 15 | Scented Phenyl (5 Ltrs. x 12 Months) |
| 16 | Black Phenyl (10 Ltrs. x 12 Months) |
| 17 | Coir Jhadu (12 Nos. x 12 Months) |
| 18 | Phul Jhadu (13 Nos. x 12 Months) |
| 19 | Naphthalene ball (1/4 kg. X 12 months) |
| 20 | Harpic (1 ltr. X 12 months) |
| 21 | Room Freshener (4 Nos. x 12 Months) |
| 22 | Plastic Brush (2 Nos. X 12 months) |
| 23 | Detergent (Surf Excel) (5 Kg. x 12 Months) |
| 24 | Waste Cloth (15 Mtr. x 12 Months) |
| 25 | Cotton Waste / Markin Cloth (1 Kg. x 12 Months) |
| 26 | Lifebuoy Soap (10 Nos. x 12 Months) |
| 27 | Dettol Handwash Liquid (2 Ltrs. x 12 Months) |
| 28 | Plastic Bucket (10 Nos. x 1 Year) |
| 29 | Plastic Mug (10 Nos. x 1 Year) Please Enable Macros to View BoQ information |