|
| 1 | (A) LABOUR COMPONENT |
| 2 | Daily cleaning with phool jhadu over mosaic, cement marbel floor, tile floor including cost of labours, T&P charges etc as per direction of Engineer-in-Charge. (except Sundays & National Holidays) |
| 3 | GM Office Floor Area (4066.79 sqft. X 260 days in a year) |
| 4 | Dispensary Floor Area (813.98 sqft. X 294 days in a year) |
| 5 | M.E. School Floor Area (2611.44 sqft. X 208 days in a year) |
| 6 | Hanger Store Office Floors & Utility Sub-II Office Floors (1210.06 sqft. X 294 days in a year) |
| 7 | Oil Hanger Store & Utility Sub-I Office Floors (251.07 sqft. X 294 days in a year) |
| 8 | Water Supply Floor Area (851.90 sqft. X 294 days in a year) |
| 9 | LWC Floor Area (2325.36 sqft. X 294 days in a year) |
| 10 | Officers Club Floor Area (1403.51 sqft. X 104 days in a year) |
| 11 | Daily cleaning with broom stick over earth/ cement/ concrete/ concrete pavor block surface including cost of labours, T&P charges etc as per direction of EIC.(except Sundays & Natioanal Holidays) |
| 12 | GM Office Front Path (1750.62 sqft. X 260 days in a year) |
| 13 | Dispensary Front Path (840.00 sqft. X 294 days in a year) |
| 14 | M.E. School Front Path (2674.58 sqft. X 208 days in a year) |
| 15 | Hanger Store Office Floors & Utility Sub-II Office Floors (6453.68 sqft. X 294 days in a year) |
| 16 | Oil Hanger Store & Utility Sub-I Office Front Path (420.00 sqft. X 294 days in a year) |
| 17 | LWC Front Path (1367.10 sqft. X 294 days in a year) |
| 18 | Officers Club Front Path & Courtyard (1575.00 sqft. X 104 days in a year) |
| 19 | Daily cleaning with long head mop soaked with scented phenyl over cement floor, mosaic floor, marbel floor, tile floor including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge (except Sunday and National Holidays). |
| 20 | GM Office Floor Area (4066.79 sqft. X 260 days in a year) |
| 21 | Utility Sub-Division-I Office (288.00 sqft. X 294 days in a year) |
| 22 | Dispensary Floor Area (813.98 sqft. X 294 days in a year) |
| 23 | Monthly cleaning with long head mop soaked with scented phenyl over cement floor, mosaic floor, marbel floor including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. |
| 24 | LWC Floor Area (2325.36 sqft. X 12 days in a year) |
| 25 | Officers Club Floor Area (1403.51 sqft. X 12 days in a year) |
| 26 | Daily cleaning of lavatory floor with brush and phenyl water including cost of labours, T&P charges etc. complete in all respect as per direction of Engineer-in-Charge. |
| 27 | GM Office 2 times per day (245.23 sqft. X 520 days in a year) |
| 28 | Dispensary (37.12 sqft. X 294 days in a year) |
| 29 | ME School (65.51 sqft. X 208 days in a year) |
| 30 | LWC (129.88 sqft. X 104 days in a year) |
| 31 | Officers Club (72.34 sqft. X 104 days) |
| 32 | Quarterly cleaning of Spider nets and other dirts of side wall and ceiling by broom stick and removing of the dust from the floor including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. |
| 33 | GM Office (15166.28 sqft. X 4 times in a year) |
| 34 | Dispensary (3399.12 sqft. X 4 times in a year) |
| 35 | ME School (5753.60 sqft. X 4 times in a year) |
| 36 | Hanger Store Office Floors & Utility Sub-II Office (1691.21 sqft. X 4 times in a year) |
| 37 | Oil Hanger Store & Utility Sub-I Office (1096.07 sqft. X 4 times in a year) |
| 38 | Water Supply Floor Area (1931.90 sqft. X 4 times in a year) |
| 39 | LWC (6177.92 sqft. X 4 times in a year) |
| 40 | Officers Club (4970.36 sqft. X 4 times in a year) |
| 41 | Half Yearly cleaning of Top roof of building including staking of waste materials and proper disposal of the same including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. |
| 42 | GM Office (6110.50 sqft. X 2 times in a year) |
| 43 | Dispensary (726.72 sqft. X 2 times in a year) |
| 44 | LWC (1153.85 sqft. X 2 times in a year) |
| 45 | Officers Club (1475.85 sqft. X 2 times in a year) |
| 46 | Quarterly disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-Charge, beyond 50 m initial lead, for all leads including all lifts involved and as per direction of Engineer-in-Charge. |
| 47 | GM Office (2.00 cum. X 4 times in a year) |
| 48 | LWC ( (2.00 cum. X 4 times in a year) |
| 49 | Officers Club (1.00 cum. X 4 times in a year) |
| 50 | Quarterly cleaning of shrub jungles, uprooting of stumps and small bushes and tree below 1 mtr girth on pre-measurement including staking of waste materials and proper disposal of the same including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. |
| 51 | GM Office back and side jungle area (588.75 sqm. X 4 times in a year) |
| 52 | Dispensary back & side Jungle area (1359.79 sqm. X 4 times in a year) |
| 53 | Hanger Store Office Floors & Utility Sub-II Office Floors (4147.06 sqm. X 4 times in a year) |
| 54 | Oil Hanger Store & Utility Sub-I Office Front and side jungle (882.27 sqm. X 4 times in a year) |
| 55 | Water Supply Floor Area Jungle (2286.81 sqm. X 4 times in a year) |
| 56 | LWC Front and back jungle area (1596.25 sqm. X 4 times in a year) |
| 57 | Officers Club side and back jungle area (69.68 sqm. X 4 times in a year) |
| 58 | Yearly Cleaning of septic tank, removal of dirt and disposal of the same away from the township areas as and when required including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. |
| 59 | GM Office (150.00 cft. X 1 times in a year) |
| 60 | Dispensary (100.00 cft. X 1 times in a year) |
| 61 | LWC (100.00 cft. X 1 times in a year) |
| 62 | Yearly Earth work excavation for temporary drainage systems in different locations in ordinary soil within 50 mtrs. initial lead and 1.5 mtrs. initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30 mtrs in depth & as per direction of Engineer-in-charge. |
| 63 | GM Office Floor Area (2.19 cum. X 1 time in a year) |
| 64 | Hanger Store Office Floors & Utility Sub-II Office Floors (3.75 cum. X 1 time in a year) |
| 65 | LWC Floor Area (1.88 cum. X 1 time in a year) |
| 66 | Officers Club Floor Area (1.25 cum. X 1 time in a year) |
| 67 | (B) COST OF MATERIALSMATERIALS PER MONTH |
| 68 | Scented Phenyl (10 ltr. X 12 months) |
| 69 | Detergent ( Surf ) (10 kg. X 12 months) |
| 70 | Coir Jhadu (5 nos. X 12 months) |
| 71 | Phul Jhadu (3 nos. X 12 months) |
| 72 | Waste cloth (15 mtr. X 12 months) |
| 73 | Naphthalene ball (1/4 kg. X 12 months) |
| 74 | Harpic (1/2 ltr. X 12 months) |
| 75 | Plastic Brush (1 no. X 12 months) |
| 76 | Purifier (5 nos. X 12 months) |
| 77 | Cotton Waste (1/4 kg. X 12 months) |
| 78 | MATERIALS PER YEAR |
| 79 | Plastic Bucket per year |
| 80 | Plastic Mug per year |
| 81 | Room Freshener |
| 82 | Hand wash Liquid Please Enable Macros to View BoQ information |