|
| 1 | Dismantling and removing old tiled flooring including stacking the useful materials for reuse and removing the debris within 50m lead.Per 1 sqm |
| 2 | Dismantling and removing old tiled cladding from walls including racking out joints 12mm deep stacking the useful materials for reuse and removing the debris within 50m lead. Per 1 sqm |
| 3 | Dismantling G.C.I. or A.C. sheet roofing after carefully removing the bolts and nuts including stacking the useful materials for reuse and removing the debris within 50m lead. Per 1 sqm |
| 4 | Dismantling brick or stone masonry in clay under 3mtr height including stacking the useful materials for reuse and removing the debris within 50m lead. Per 1 cum |
| 5 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge |
| 6 | Filling foundation and plinth with sand and wel watered &rammedetc . Complete including cost of sand . |
| 7 | Cement Concrete (1:4:8) by using 4cm. Size C.H.G. metal including cost, conveyance etc. complete. |
| 8 | RCC work of M 20 grade with 20 mm and down grade black hard granite (Crusher broken) stone chips including hoisting and laying. Column |
| 9 | RCC work of M 20 grade with 20 mm and down grade black hard granite (Crusher broken) stone chips including hoisting and laying. Plinth Beam |
| 10 | RCC work of M 20 grade with 20 mm and down grade black hard granite (Crusher broken) stone chips including hoisting and laying. Column |
| 11 | RCC work of M 20 grade with 20 mm and down grade black hard granite (Crusher broken) stone chips including hoisting and laying. Roof beam |
| 12 | RCC work of M 20 grade with 20 mm and down grade black hard granite (Crusher broken) stone chips including hoisting and laying. Slab |
| 13 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. |
| 14 | Fly ash Brick masonary in cement mortar (1:6) by using 9\\" size Bricks including all cost, conveyance etc. complete. Sub Structure |
| 15 | Fly ash Brick masonary in cement mortar (1:6) by using 9\\" size Bricks including all cost, conveyance etc. complete.Super Structure |
| 16 | 16mm thick cement plaster (1:6) for brick or work stone masonry. Per 1 Sqm. |
| 17 | 12mm thick cement plaster (1:6) for brick work (Per 1 Sqm.) |
| 18 | 6 mm thick Cement Plaster with cement mortar (1:4) over RCC surface including deep chiping & including all cost, conveyance, taxes, royalities etc. complete as directed by the Engineer-in-charge. |
| 19 | Providing and fixing Ceramic tiles in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. |
| 20 | Providing and fixing Ceramic tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as directed by the Engineer-in-charge. |
| 21 | Finishing wall surface of walls with cement based wall putty (Water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T&P etc complete. |
| 22 | priming walls with water based cement primer on new work one coat to give an even shade including cost of primer. |
| 23 | Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade including cost of paint. |
| 24 | Supplying, fitting and fixing of of Rajshri moulded PVC solid flush door frame with shutter having water and termite proof etc. including cost of all hardware fixtures etc. all complete. |
| 25 | Supply fitting fixing of MS Grill/ MS Door/ MS Windows including cost conveyance etc all complete. |
| 26 | 2.5 cm thick Artifical Stone Flooring with cement concrete (1:2:4) including punning using 12mm size hand broken granite chips as per direction of Engineer-in-charge. |
| 27 | Supplying, fitting and fixing of PH fittings including cost of all hardware fixtures etc. all complete. As per actual bill voucher submitted. |
| 28 | Supplying, fitting and fixing of Electrical fittings including cost of all hardware fixtures etc. all complete. As per actual bill voucher submitted. |
| 29 | Provision for construction of transparency pillar with written charges and submission of working photo graphs Please Enable Macros to View BoQ information |