|
| 1 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc ( not exceeding 1. 5 M in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan ,depth upto 1.5 Mt including disposal of excavated earth upto 1 Mtr from cutting edges, disposed earth to be leveled and neatly dressed in . 1) All kinds of soil. |
| 2 | Earthwork in excavation by mechanical hydraulic excavator means in trenches for foundations, drains, pipes, cables etc ( not exceeding 1.5 M in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan ,depth upto 1.5 Mt including disposal of excavated earth upto 1 Mtr from cutting edges, disposed earth to be leveled and neatly dressed in . 1) All kinds of soil. |
| 3 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc ( not exceeding 1. 5 M in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan ,depth upto 1.5 Mt including disposal of excavated earth upto 1 Mtr from cutting edges, disposed earth to be leveled and neatly dressed in . 1) Hard rock (blasting prohibited) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 6 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete |
| 7 | Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level andcuring complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand)Nallah stone |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth:.2 Without bond stone Using nallah stone |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete. 40mm thick with 20 mm nominal size stone aggregate. |
| 10 | Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations. |
| 11 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 12 | Dumping stone excluding cost of stones.in Horizontal on level |
| 13 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. |
| 14 | Loading/Unloading sand/ earth filled bags in lorries; lead upto 50m. |
| 15 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry |
| 16 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet |
| 17 | Slip clearance In ordinary soils disposal lead upto 50 m and lift upto 1.5 m. |
| 18 | Slip clearance In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. |
| 19 | Slip clearance In soils; mixed with Decomposed Rocks; by blasting or any other means |
| 20 | Carriage of cement by H/L for 1st 50 mtr |
| 21 | Carriage of sand and Bajri Ist 50 Mtrs by H/L |
| 22 | Carriage of stone Ist 50 Mtrs by H/L |
| 23 | Carriage of stone by M/T for 1st 1 km |
| 24 | Carriage of sand and bajri by M/T for 1st 1 km |
| 25 | Carriage of cement by M/T for 1st 1 km |
| 26 | Mason fitter first class |
| 27 | Labour fitter second class |
| 28 | Supply of stone |
| 29 | Hydraulic excavator of 1 cubic meter bucket |
| 30 | Cost of crates |
| 31 | Carriage of crates for first 1 Km by MT |
| 32 | Carriage of crates for first 50 m by HL |
| 33 | Labour for stone shiseling,Removal of trees, boulders . Please Enable Macros to View BoQ information |