| 1 | Providing one Earth using earth pipeof size 38.1mm dia 2.5m length including digging separate pit (0.45 x 0.45 x 2.5 m)at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 2 | Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT line |
| 3 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading charges |
| 4 | Drilling holes of various sizes on existing Channel/cross arm |
| 5 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole incl. conveyance of materials |
| 6 | Providing additional jumper from AB to line |
| 7 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 8 | Dismantling (without damage) one channel cross arm from the existing DP structure and bringing back to section store |
| 9 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 10 | Fitting and providing one HT stay for 11KV pole incl. digging and back filling pit in ordinary soil |
| 11 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 12 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the ground for earthing excluding provision of earthing |
| 13 | Stringing of one km 11 kV 3 PH 11 kV line with XLPE Insulated ACSR Racoon or equivalent (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works |
| 14 | Fitting and providing one strut using HT PSC pole incl. digging and back filling pit in ordinary soil |
| 15 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding etc complete |
| 16 | Transferring LT 3 ph 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding etc complete |
| 17 | Dismantling (without damage) one LT PSC/RCC strut pole including removal of clamps and stacking |
| 18 | Additional rate for providing one disc set,PG clamp etc complete on any type of HT pole for making cut point |
| 19 | Fitting and erecting one HT PSC single pole in position incl. fitting cross arm, digging & back filling pit in ordinary soil (as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 20 | Fitting and erecting one HT A type single pole in position incl. fitting cross arm,digging & back filling pit in ordinary soil (as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision for earthing) |
| 21 | Providing bridging at Cut points for 3 PH 11 kV line with XLPE Insulated ACSR Racoon or equivalent (1 conductors) using IPC and respective conductors |
| 22 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20x12 cm or Painting the surface of line supports where numbers are to be inscribed .Pole numbers shall be painted in circular/rectangular background using approved quality anti algal yellow paint in two coat after scrapping and cleaning the surface at a height of 2.5m above ground level.The number and letters should be in black synthetic enamel paint.The size of the number should be atleast 2 cm in height x 1.5 cm in width including cost of paint |
| 23 | Providing concrete muffing of size (0.45x0.45x1.5m) ( 0.5m above GL and 1m below GL).Excavation 0.45x0.45x1m concrete (1:3:6 20mm) 0.45x0.45x1.5m.Plastering (1:3) 12mm 0.45mx0.45mx 5 sides |
| 24 | Dismantling ( without damage ) one LT PSC/RCC pole after disconnecting stays, strut etc.attached thereon and stacking the same |
| 25 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store Please Enable Macros to View BoQ information |