| 1 | Dismantling and Removing cement concrete work including stacking the useful materials for reuse and removing the debris within 50m lead. |
| 2 | Earth Excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area. |
| 3 | Carriage of excavated earth by mechanical means within 5KM lead (excluding loading charges ) |
| 4 | Filling in foundation and plinth with sand, watered and rammed including cost, conveyance & royalty of materials with labour and T&P required for the work. |
| 5 | Plain Cement Concrete of proportion (1:4:8) with 40mm & down graded size hand broken H.G. metal including cost, conveyance & royalty of materials with all labour charges. |
| 6 | R.C.C. M-25 Grade using 20mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers compactingby vibrator and all leads and lifts including frame works etc complete |
| 7 | ick masonary using Fly ash bricks (230x1210x80) in CM (1:4) in Superstructure and plinth with cost of all labour and materials, etc complete. Below wall plinth stair |
| 8 | super structure |
| 9 | Supplying fitting and ucoated HYSD bar rein forcement complete as per drawing and technical specification.Use TATA/SAIL/Jindol |
| 10 | Fixing tile in floors,treads of steps & landingon 25mm thick bed of cement mortar (1:1),jointed with neat cement slury mixed withpigments to match the shades of the tilesincluding rubbing and polishing completewith cost of tiles. |
| 11 | Fixing tile in dado skirting & riser of steps on 12mm thick cement plaster (1:3) Jointed with neat cement slury mixed with pigments to match the shade of the tile including rubbing & polishing complete. |
| 12 | Suppluing fixing of Kidappa tile of 10mm thick bed of cm (1-1) width net cement slory mixing incuding fixing tiles etc. complete. |
| 13 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete.(Column 1st footing column 2nd footing column of to plinth beam) |
| 14 | column and roof beam |
| 15 | Roof slab |
| 16 | lintel beam chajja |
| 17 | Supplying & fixing MS grill ,door ,window, gate including cost & conveyance of material etc comp |
| 18 | 16 mm thick cement plaster in cement mortar (1:4) including cost, conveyance & royality of materials. |
| 19 | 12 mm thick cement plaster in cement mortar (1:4) including cost, conveyance & royality of materials. |
| 20 | Priming one coat with water based wall primer over plastered surface |
| 21 | painting two coats with any aproved colour weather seal coat to outside surface |
| 22 | Priming one coat with approved red oxide primer on steel work. |
| 23 | Painting two coat with approved enamel paint on steel work |
| 24 | Cost of Display board & Photographs Please Enable Macros to View BoQ information |