| 1 | 63 KVA/0.4 KV, Plinth mounted Distribution Transformer, BIS Level-II Star-1 |
| 2 | Stock storage & insurance 3% (Item No.1) |
| 3 | T&P 2% (Item No.1 to 2) |
| 4 | Contigency 3% (Item No.1 to 2) |
| 5 | Transportation 7.50% (Item No.1 to 2) |
| 6 | Errection charges of Transformer/Breaker/Joist pole 5% (Item No.1 to 2) |
| 7 | Cost of 9 mtr long PSC Pole for 11 KV Line, Tapping pole and LT Line |
| 8 | Stock storage & insurance 3% (Item No.7) |
| 9 | T&P 2% (Item No.7 to 8) |
| 10 | Contigency 3% (Item No.7 to 8) |
| 11 | Transportation 7.50% (Item No.7 to 8) |
| 12 | Errection charges for PSC pole 20% (Item No.7 to 8) |
| 13 | Construction of Plinth mounted 11/0.4 KV S/S using 9 mtr long PSC pole with double disc arrangement for 63 KVA Transformer. (Excluding pole & Transformer) |
| 14 | 11 KV Cut point accessories on 9 mtr PSC pole. |
| 15 | 11 KV line DP with AB Switch using 9 mtr PSC pole. |
| 16 | Analysis of cost of materials for 11 KV line on 100 Sqmm insulated AAAC on 9 mtr PSC Pole. |
| 17 | Analysis of cost of 1 KM of 3-ph 95 Sqmm AB Cable on 9 mtr PSC Pole for LT line (30 mtr. Span). |
| 18 | PVC Cable of 25 Sqmm size (Armoured) |
| 19 | Stock storage & insurance 3% (Item No.13 to 18) |
| 20 | T&P 2% (Item No.13 to 19) |
| 21 | Contigency 3% (Item No.13 to 19) |
| 22 | Transportation 7.50% (Item No.13 to 19) |
| 23 | Errection charges for other materials for line & S/S 10% (Item No.13 to 19) |
| 24 | Plinth For 63 KVA |
| 25 | Cost of Fencing, boundary wall, metal spreading. |
| 26 | Concrete materials for stay anchor plate. |
| 27 | Padding and concreting materials for support. |
| 28 | Drawing Approval |
| 29 | Inspection fee for HT Line. Please Enable Macros to View BoQ information |