| 1 | Yatri Pratikshalaya |
| 2 | Clearing jungle including uprooting of rank vegetations grass,buss,Wood trees and sapling of girth upto 30 cm . Measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 50 meters outside the periphery of area cleared. |
| 3 | Boring with hydraulic piling rigs with power unit ,providing and ininstalling cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete ,to carry of safe working load not less than specified .excluding the cost of steel reinforcement bul including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete (length of pile for payment shall be measured upto to the bottom of pile cap)-250MM DIA |
| 4 | Excavation in foundation in black cotton soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation (Drain/Edging). |
| 5 | Cement concrete with 40 mm gauge stone ballast, approved coarse sand and cement in proportion of 1:5:10 i/c all required for proper completion of work as per directed by Engineer in charge. |
| 6 | R.C.C Work 1:1.5:3 Cement ,coarse Sand and Stone Grit mortar in foundation and footing |
| 7 | R.C.C Work 1:1.5:3 Cement ,coarse Sand and Stone Grit mortar in Column |
| 8 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrougth to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping and hooks.(Roof) |
| 9 | M.s iron work in heavy size such as Truss & Purlin i/c all complete as dircted by Engineer in charge as in |
| 10 | One Coat Primer Two Coat Enamel Paint i/c Labour t&p Complete |
| 11 | S/F Tata Durshine 0.63 mm thick Colour coated sheat i/c Labour t&p Complete |
| 12 | M.s. or Iron work in heavy size such as truss |
| 13 | Providing and fixing of Ridge As per Design and Drawing |
| 14 | Earth work in filling in sub grade ,earth transported from 1.00 km distance & mechanically compacting with road roller or iron hammer I/c hire and fuel charges of roller and I/c all materials, labour , T&P , all taxes etc all complete as per directed by Engineer in charge. |
| 15 | Construction of granular sub base by providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with roatvator at OMC and compacting with smooth wheel roller to achieve the desiersd density, complete as per technical specification Clause 401 |
| 16 | Providing laying spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screening to fill up the interstices of coarse aggregate,watering and compacting to the required density, Grading-3 as per technical specification class 405 |
| 17 | Laying of 80 mm thick cement concrete paver block (interlock bricks) with 40 mm thick stone dust including preaparation of base and joint filling all complete. |
| 18 | Earth work in excavation in foundation in B.C. soil Lead up to 30m and lift up to 1.50 m i/c all complete as per directed by Engineer in charge. |
| 19 | Filling of Stone Dust /Sand having P.I. less than 5 in Foundation or for Stabilization of Sub grade i/c all materials ,labour, Sprinkling of water as required , T&P ,royalty, all taxes etc. required for proper completion of Work. |
| 20 | Cement concrete with 40 mm gauge stone ballast, approved coarse sand and cement in proportion of 1:5:10 i/c all required for proper completion of work as per directed by Engineer in charge. |
| 21 | Class-150 brick work in 1:4 cement and Fine sand mortar in foundation and plinth I/c all compelete chapter- 6 S.I. No. 305 |
| 22 | C.C. work in 1:2:4 cement, coarse sand and 20mm gauge stone grit I/c all required for proper completion of work as directed by engineer in charge, chapter 5 S.I. NO. New item - (a) |
| 23 | Supply and fixing of Granit Black Stone sign board including painting and lettering as directed by Engineer-in-charge. |
| 24 | Add for Photography etc. Please Enable Macros to View BoQ information |