| 1 | Total amount of the \\"Rate Schedule\\" sheet SCHEDULE OF QUANTITY AND RATE FOR REPLACEMENT OF ACSR CONDUCTOR BY AERIAL BUNCH CABLE IN DIFFERENT AREAS OF NATHUAWALA AND TUNWALA UNDER 33/11 KV SUB-STATION, BALAWALA UNDER EDSD, BALAWALA UNDER EDD, RAIPUR AGAINST E-TENDER SPECIFICATION NO.10/EDCRDDUN/2026-27 Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Qty Rate Amount Part [A] (Supply Portion) |
| 2 | Holding Clamp J-I hook for AB cable |
| 3 | LT Clamp for PCC Pole with N&B |
| 4 | Stay Clamp for SP-21 with Nut & Bolt |
| 5 | Suspension Clamp with Eye Hook |
| 6 | LT Clamp for Distribution Box |
| 7 | Dead End Clamp with I Hook |
| 8 | Piercing Connector 16 sqmm. - 16 sqmm. |
| 9 | Insulation Piercing Connector 120-50 sqmm. |
| 10 | Bolt & Nuts off Size |
| 11 | MS Clamp 65x6 mm. with N&B |
| 12 | Heat shrink type end caps for LT AB Cable |
| 13 | LT XLPE Cable 1x50 sq.mm. |
| 14 | LT AB Cable 3x70+1x50+1x16 Sqmm. |
| 15 | LT Distribution Box 1 Phase |
| 16 | LT Distribution Box 3 Phase |
| 17 | Jointing Sleeve 4 mm. |
| 18 | Al. Lugs 50 sqmm. |
| 19 | LT Bare neutral PG Clamp Total - Part [A] 0.0 Part [B] (Labour Portion) |
| 20 | Erection of LT Stay set |
| 21 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand) block including cost of Cernent, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO Manual. |
| 22 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
| 23 | Erection of Single support poles SP-21 in proper level and alignment along with fixing of all accessories. Like top channel & clamps as per RESPO construction Manual. |
| 24 | Grouting of pole in size 0.45x0.45x1/9 of the support CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand) block including cost of Cement, Sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual |
| 25 | Muffing of poles size 0.45 cm x 0.60 cm radius with cc 1:3:6 (1 cement: 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc. |
| 26 | Dismantling of old ACSR conductor (weasel) (LT line) including Re- rolling back its conductor, wire, clamp insulator etc. including stacking & transportation of material to the UPCL store : 1 Phase 2 Wire Ckm 19.0 0.0 2 Phase 3 Wire Ckm 1.5 0.0 |
| 27 | Cartage of ST pole from store centre to construction site with loading, unloading at both points and proper stacking (0-20 Km). SP-21 Nos 5.0 0.0 |
| 28 | Cartage of other material (other than poles) by vehicle fro Store Center to nearest construction site Store including loading and unloading at both ends (0-20 Km.) Rs.Per Qtl. Qtl 345.0 0.0 |
| 29 | Head load cartage of following Poles from road to site Upto 0 to 1 Km. SP-21 Nos 5.0 0.0 |
| 30 | Head load cartage of Small material. Rates are per Km/Quintal including loading and Unloading. Upto 0 to 1 Km. Qtl 345.0 0.0 |
| 31 | Disconnection & Reconnection of Consumer |
| 32 | Laying, Stringing and Sagging of LT AB Cable 3x95+1x70 sqmm. |
| 33 | Straightening of Tilted ST Poles |
| 34 | Installation of LT DB 1 Phase for LT AB Cable |
| 35 | Installation of LT DB 3 Phase for LT AB Cable |
| 36 | Fixing of Head Shrink Cap for AB Cable |
| 37 | Fixing of Jointing Sleeves for AB Cable |
| 38 | Fixing of MS Clamp |
| 39 | Fixing of Dead End Clamp |
| 40 | Fixing of LT Clamp for PCC Pole |
| 41 | Fixing of 1x50 sqmm. XLPE Cable |
| 42 | Installation of 50 sqmm. LT Al. Lugs |
| 43 | Fixing of Suspension Clamp with I Hook |
| 44 | Fixing of IPC |
| 45 | Fixing of Piercing Connector 16 sqmm. - 16 sqmm. |
| 46 | Fixing of LT Distribution Clamp |
| 47 | Laying, Stringing and Sagging of LT AB Cable 3x70+1x50+1x16 sqmm. |
| 48 | Back Carriage of Scrap Material Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer Please Enable Macros to View BoQ information |