| 1 | LT Reconductoring using LT ABC and LT CC |
| 2 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 3 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 4 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 5 | Erection of suspension clamp for LT ABC of any size |
| 6 | Transporting LT ABC by hired vehicle to a distance upto 5 km and carring up to 2 drum including loading and un loading using crane |
| 7 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 8 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 9 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 10 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 11 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 12 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 13 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 14 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 15 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 16 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 numbers of poles. (Running km) |
| 17 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 18 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 19 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 20 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 21 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arm,insulators and stacking the conductors in rolls properly |
| 22 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 23 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 24 | Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. Please Enable Macros to View BoQ information |