| 1 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the foundation bed and depositing the excavated materials clear of work site with all leads, lifts, delifts and dewatering & shoring including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, hire and running charges of all machineries, labour cess etc. complete in all respects as per specification and direction of the Engineer-in-Charge. |
| 2 | Filling in foundation & plinth with sand well watered to saturated condition and rammed including all cost, carriage, royalty, taxes of materials with all labour charges cess etc. complete as per the direction of the Engineer-in-Charge. |
| 3 | Cement Concrete (1:3:6) with 40mm size hard granite crusher broken metal confirming to relevant BIS specifications with all cost, conveyance, royalty of all materials T&P, cess including scaffolding, walkways & properly mixing, hoisting & placing concrete to desired workability & curing for recommended period etc. complete as per the direction of the Engineer-in-Charge. |
| 4 | Brick work with Fly ash Bricks masonry in dimensional tolerance ±8 percent in cement motar (1.6) in foundation & plinth moulding & similar such type of work with all necessary projections using K.B bricks 9\\"/10\\" size having a crushing strength of 87kg / sqcm with splays cutting circular moulding chamfering & cerbelling watering & after immersing the bricks in water for six hours before using etc. complete including all cost of materials conveyance, royalty and all other taxes including watering and curring etc. complete as per the direction of the Engineer-in-Charge. |
| 5 | Brick work with Fly ash Bricks masonry in dimensional tolerance ±8 percent in cement motar (1.6) in supersrtructure moulding & similar such type of work with all necessary projections using K.B bricks 9\\"/10\\" size having a crushing strength of 87kg / sqcm with splays cutting circular moulding chamfering & cerbelling watering & after immersing the bricks in water for six hours before using etc. complete including all cost of materials conveyance, royalty and all other taxes including watering and curring etc. complete as per the direction of the Engineer-in-Charge. (Ground Floor) |
| 6 | First Floor |
| 7 | Second Floor |
| 8 | Single under reamed pile foundaiton with RCC M-30 using 20mm downgraded size black hard granite crusher broken stone chips including cost of boring but excluding cost of M/S tor steel and labour charges for cutting bending of steel with cost, conveyance, royalty of all materials, T&P and labour charges, cess etc. complete in all respects as per specification and direction of the Engineer-In-Charge. |
| 9 | Cement Concrete M-20 with 20mm and downgraded size hard granite crusher broken chips for PCC / RCC work confirming to relevant BIS specifications for all materials including scaffolding, walkways & properly mixing, hoisting & laying with desired workability with all cost, conveyance, royalty of all materials, T&P labour charges, cess etc. complete including curring for recommended period as per the direction of the Engineer-in-Charge. (R.C.C. Column Base) |
| 10 | R.C.C. Plinth band |
| 11 | R.C.C. Columns and Beams (Ground Floor) |
| 12 | R.C.C. Columns & Beams (First Floor) |
| 13 | R.C.C. Columns & Beams (Second Floor) |
| 14 | R.C.C. Roof Slab (Ground Floor) |
| 15 | R.C.C. Roof Slab (First Floor) |
| 16 | R.C.C. Roof Slab (Second Floor) |
| 17 | R.C.C. Stair Case (Ground Floor) |
| 18 | R.C.C. Stair Case (First Floor) |
| 19 | R.C.C. Lintels (Ground Floor) |
| 20 | R.C.C. Lintels (First Floor) |
| 21 | Supplying, fitting, fixing of HYSD including labour charges for straightening, cutting, bending and binding the H.Y.S.D. Bar or tor steel and tying the grills and placing in position (confirming to I.S.I specification) including jointing if necessary by lapping, welding as required for R.C.C work as per approved drawing and design & binding with binding wire 18 to 20 gauge including cost carriage and other taxes of all materials with all leads, lifts & delifts of reinforcement bars etc. complete as per the direction of the Engineer-in-charge (Foundation) |
| 22 | Ground Floor |
| 23 | First Floor |
| 24 | Second Floor |
| 25 | Providing 6mm thick cement plastering (1:4) to RCC surfaces finished smooth including closed chipping, cleaning, adding adhesive to slurry treatment etc. all cost, carriage, royalty of materials, labour and all other taxes of materials with watering, curing etc complete as per the direction of the Engineer-in-Charge. (Ground Floor) |
| 26 | First Floor |
| 27 | Providing 12 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and taxes of all materials with cost of all labour, T&P, and scaffolding required for the work etc. complete as per direction of the Engineer-in-Charge. (Ground Floor) |
| 28 | First Floor |
| 29 | Second Floor |
| 30 | Providing 16 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties and taxes of all materials with cost of all labour, T&P, and scaffolding required for the work etc. complete as per direction of the Engineer-in-Charge. (Ground Floor) |
| 31 | First Floor |
| 32 | Second Floor |
| 33 | Supplying, fitting and fixing of vitrified tiles in landing treads of stapes and floors of size 600mm x 600mm of approved make conforming to IS 13755 laid on 25mm thick cement morter bed (1:4) and the jointed with white cement of approved quality including cost, carriage, taxes all materials and royalty of sand including all labour T&P etc. required with all lead lift & delifts for all floors etc. complete in all respects as per specification and direction of the Engineer-In-Charge. (Ground) |
| 34 | First Floor |
| 35 | Supplying, fitting and fixing of vitrified tiles of size 300mm x 300mm in dadoo skirting and rises of steps on 12mm thick cement mortar (1:3) and filling joints with neat cement slorry mixed with pigment to match the shades of the tiles including cost, carriage, taxes all materials and royalty of sand including all labour T&P etc. required with all lead lift & delifts for all floors etc. complete in all respects as per specification and direction of the Engineer-In-Charge. (Ground) |
| 36 | First Floor |
| 37 | Painting two coats of synthetic enamel paind over a coat of primer with any approved paint with brush to wood/iron work including cost, conveyance, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. (Ground Floor) |
| 38 | First Floor |
| 39 | Finishing walls with plastic emulsion paint of approved colour to approved shade two coats over a coat of primer to give an even shade including cost, conveyance, taxes of all materials, labour, T&P etc. complete as per direction of Engineer-in-Charge. (Grand Floor) |
| 40 | First Floor |
| 41 | Finishing walls with water proofing weather coat of approved shade on new work two coats to give an even shade with cost, conveyance, taxes of all the materials required for the work and labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. (Ground Floor) |
| 42 | First Floor |
| 43 | Second Floor |
| 44 | Supplying, fitting and fixing of M.S. grill with M.S. Plat door & and windows shutters with frame of approved design in proper position making good to the damges of walls of R.C.C or other structural etc. including mending or cutting sizes or grooves in chaukhats with cost, conveyance, taxes of all materials required for the work, labour and T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. (Ground Floor) (Door) |
| 45 | Window (Ground Floor) |
| 46 | MS Grill (Ground Floor) |
| 47 | Door (First Floor) |
| 48 | Window (First Floor) |
| 49 | MS Grill |
| 50 | Providing and fixing MS fan hooks with box and PVC pipe wiring to fan point including all cost of all materials all other taxes etc. complete as per the direction of the Engineer-in-charge. (Ground Floor) |
| 51 | First Floor Please Enable Macros to View BoQ information |