| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 2 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 3 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 4 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 5 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 6 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 7 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 8 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm),0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 9 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 10 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 11 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. |
| 12 | Dismantling one suspension clamp from 11 KV ABC |
| 13 | Dismantling one Anchor clamp /dead end clamp from 11 KV ABC |
| 14 | Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 120+ 1 x 95 sqmm with bare insulated Messenger |
| 15 | Fitting Knee bracing or suitable support on existing HT or LT post. |
| 16 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 17 | Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. |
| 18 | Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 19 | Dismantling One no MVT on existing cross arm (for One phase) of any rating for 11 kV AB Cable (Half rate of Key no. 27.1) |
| 20 | Dismantling of Anchor clamp / dead end clamp for LT AB cable |
| 21 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 22 | Erection of suspension clamp for LT ABC of any size |
| 23 | Dismantling of suspension clamp suitable for LT AB cable |
| 24 | Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 25 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 26 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 27 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 28 | Providing one Driven Earth using GI earth pipe of size38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. |
| 29 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 30 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 31 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 32 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 33 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 34 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 35 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 36 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 37 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase & Neutral and ACSR Weasel for street main, for one km LT single phase 3 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 38 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 39 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 40 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 41 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 42 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 43 | Dismantling one section fuse from structure and bringing back to section store. |
| 44 | Shifting one No. single phase service connection metering equipment with all fittings including lowering down the WP service wire, dismantling Meter Board without making damage and refitting the same at new location and redoing the WP service wire with all fittings. |
| 45 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works. |
| 46 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 47 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 48 | Dismantling of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16 (Street Light) + 1 x50 Sq.mm. (Insulated Messenger) |
| 49 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 50 | Dismantling (without damage) one HT PSC/RCC Strut pole including removal of clamps and stacking. |
| 51 | Dismantling one damaged HT PSC/RCC Strut pole including removal of clamps and stacking. |
| 52 | Dismantling one damaged LT PSC/RCC Strut pole including removal of clamps and stacking. |
| 53 | Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. |
| 54 | Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. |
| 55 | Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. |
| 56 | Providing additional HT stay on existing stay rod for Making “V” stay. |
| 57 | Providing additional HT stay insulator in existing stay. |
| 58 | Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles |
| 59 | Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 60 | Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. |
| 61 | Fitting and providing one Strut using A type pole, including digging and back filling pit in ordinary soil. |
| 62 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 63 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 64 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 65 | Dismantling (without damage) one AB switch from existing structure and bringing back to section store. |
| 66 | Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store. |
| 67 | Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. |
| 68 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). Please Enable Macros to View BoQ information |