| 1 | Material |
| 2 | Holding Clamp SP-33 with Nut & Bolt |
| 3 | 11 KV IPC for Covered to Covered Conductor |
| 4 | 11 KV IPC for Covered to Bare Conductor |
| 5 | 11 KV Mid Span Jointing Kit |
| 6 | IPC with Aluminium bail for earthing 11 KV |
| 7 | 11 KV Suspension Ties/ Cable ties for pin insulator |
| 8 | 11 KV Biometalic Crimping insulated lugs |
| 9 | 11 KV Polymer Pin Insulator with Pin-D |
| 10 | Disc Fitting 70KN-D |
| 11 | 11 LV AAAC AL-59 (99 sqmm) Covered Conductor (SS4240813 & SS4240814) EN 50397-1:2006 the conductor shall be stranded, round, non compacted and water tight, Non compacted shall be comply with all the requirement of EN 50397-1.2006 The stranded conductor shall be longitudionally water blocked by means of a water blocking material the semi conducting screen inner insulation and outer insulation should be extruted in one step. The outer covering insulation shall be UV stabilized tracking resistant black |
| 12 | 11 KV Tension Clamp with Bail & IPC |
| 13 | Labour |
| 14 | Chemical Earthing |
| 15 | Fabrication of Steel |
| 16 | Excavation of Pit for Pole |
| 17 | Erection of Single SP-33 Pole |
| 18 | Grouting of Pole |
| 19 | Muffing of Pole |
| 20 | Painting of SP-33 Pole |
| 21 | Construction, Installation of Danger Board/ Number Plate |
| 22 | Cartage of SP-33 Pole (0-20) km |
| 23 | Cartage of Petty Material (0-20) km |
| 24 | Head Load Cartage SP-33 Pole (0-1 km) |
| 25 | Head Load Cartage of material (0-1 km) |
| 26 | Straigthening of Tilted STP Pole |
| 27 | Back Carriage of Petty Material (0-20 km) |
| 28 | Fixing of IPC with Al. Bail for earthing |
| 29 | Fixing of 11 kV 90 KN Tension Clamp with B&IPC |
| 30 | Fixing of 11 kV suspension ties |
| 31 | Fixing of 11 kV IPC for Covered to Covered Conductor |
| 32 | Fixing of 11 kV IPC for Covered to Bare Conductor |
| 33 | Fixing of 11 kV Mid Span Jointing Kit |
| 34 | Fixing of 11 kV Biometalic Lug |
| 35 | Back Head Load Cartage of Petty Material (0-1 km) |
| 36 | Laying, Sagging of Covered Conductor for 11 KV |
| 37 | Removing of Old Conductor by Opening Jumper Fixing of Aluminium Lugs Please Enable Macros to View BoQ information |