| 1 | Clearing water hyacinth (thickly grown) from canal, drainage channels and reservoir bed on premeasurement including removal of debries and depositing the same clear of work site with all leads , lifts and delifts etc. with supply of all labour and T & P required for the work etc. complete in all respect as directed by the Engineer-in-charge. |
| 2 | Excavation , loading, unloading and carriage by mechanical means in all kinds of soil including stoney earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated material away from work site with all leads, lifts and delifts including dewatering , dressing of earth, spreading , levelling in the disposal location or locations as per requirement , all labour charges, T & P , hire and running charges of all machineries B & O.C. worker's welfare cess etc.complete as per specification and as directed by the Engineer-in-charge. ( Measurement is to be taken on finished approved level section . ) |
| 3 | Excavation of any approved type of soils in approved borrow area by mechanical means loading into and transportations by mechanical means and unloading the soil within initial lead of 3.0 Km on properly prepared and scientifically approved surface, including spreading and leveling the earth in 22.5cm (9\\") layers to make ready for watering and compaction with sheep foot roller and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road adn borrow area etc,complete as per the direction of Engineer-in-charge. ( Measurement of the fill to be taken on the finished approved Level section ) |
| 4 | Ramming rolling the earth work by light H.R.R. or by hand rammed to proper section and profile with watering to all heights including cost, conveyance and hire charges of H.R.R. with all labour & T & P et.complete as directed by the Egineer-in-charge. |
| 5 | Excavation of foundation to proper profile in all kinds soil with all leads and lifts including dressing and leveling the bed to proper slope and level and making it fit for laying concrete including depositing the excavated materials clear of work site within all leads and lifts etc. including dewatering from foundation if required etc. with supply of all labour and T&P. required for the work etc. complete in all respect as directed by the Engineer in charge. |
| 6 | Cement concrete M-15 grade 20mm down graded crusher broken hard granite aggregate of approved quality from approved quarry free from weathered skin quarry rubbish and foreign materials mixing by concrete mixer including ;lifting the materials hoisting, lowering and laying the concrete to required level with all leads and lifts compacting in layers of 0.15M thick with vibrators ramming finishing to proper slope and level, finishing the exposed surface smooth including watering curing for required period etc.including cost, conveyance ;royalty and other taxes of all materials labour T&P materials required for this item including hire running charges of the machineries .complete as directed by the Engineer-in-charge |
| 7 | Providing rigid smooth centering and shuttering for R.C.C. work to all heights including false work and dismantling then after casting and curing for required time including depositing the debrices clear of work site with all leads and lifts etc.complete with all cost, conveyance, royalty and other taxes of all materials as directed by the Engineer-in-charge. (For Foundation & Plinth) |
| 8 | Providing rigid smooth centering and shuttering for R.C.C. work to all heights including false work and dismantling then after casting and curing for required time including depositing the debrices clear of work site with all leads and lifts etc.complete with all cost, conveyance, royalty and other taxes of all materials as directed by the Engineer-in-charge. (For Wall & Fins) |
| 9 | Supplying fitting and placing uncoated HYSD rod for concrete works and tying the grills and placing in position for fabrication and fixing of reinforcement & lapping where necessary & all labour and T&P required for the work including supply of binding wire with all leads, lifts from bending yard to placement spot including cost of steel bars of any reinforcement as directed by the Engineer-in-charge. |
| 10 | Removing old revetments and approns and stacking the same for reuse and repacking with the useful old stones to proper slope and level with supply of all labour and T & P required for the work etc . complete in all respect as directed by the Engineer-in-charge. |
| 11 | Rough stone dry packing in aprons & revetments to all heights & thickness using hard granite broken stones of 30cm& above size of approved quality free from weathered skin including filling the interstices with small stones by wedging & hammering to proper slope and level with cost conveyance, royalty & other taxes of all materials including labour cess , all labour , T & P materials required for this items etc. complete in all respect as directed by the Engineer-in-charge. |
| 12 | Collecting, conveying and Labour for spreading moorum and consolidation with PRR including watering cost and conveyance of moorum and including all labour, T&p, taxes royalty required to complete the item as directed by the Engineer-in-Charge. |
| 13 | Gravel or moorum backing to revetments with cost of gravel including adding water to plastic state, with supply of all labour , T&P with all incidental Charges required for the work complete in all respect as directed by the Engineer-in-Charge. etc complete and as per the direction of the Engineer-in-charge. |
| 14 | Fine dressing of earth work in slope of Dam & canal embankment including trimmed to required profile and turfing with best compacted dub grass sods with all leads and lifts including periodical watering with labour, all other taxes as per prevailing norm and T & P till survival of the turf etc. complete in all respect as directed by the Engineer-in-Charge. (Measurement and Payment will be made on survival of the turf. ) |
| 15 | Filling the foundation and plinth with Excavated Earth with watering and ramming to the required condition including all cost, conveyance, royality and other taxes of all materials and including supplying of all labour and T&P required for the item etc. complete in all respect as directed by the Engineer-in-charge. Please Enable Macros to View BoQ information |