| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T&P, leads and lift etc complete. |
| 2 | Providing and Laying M-15 (C.C. 1:2:4) cement concrete i/c cost of all material, labour, T&P etc. complete |
| 3 | Providing and Laying M-10 (C.C. 1:3:6) cement concrete including cost of all materials, labour T&P, all lifts and leads etc. complete. |
| 4 | Providing and laying C.C. blocks in 1:2:4 (M-15 grade) cement concerete including cost of all materials, labour, T&P all lifts and leads etc. complete |
| 5 | Providing and laying of Pea Gravel 20 to 40 mm size including cost of all materials, carriage, labour, T&P, all lifts and leads etc. complete. |
| 6 | Providing and laying of coarse sand including cost of all materials, carriage, labour, T&P, all lifts and leads etc. complete. |
| 7 | Providing and laying of fine sand including cost of all materials, carriage, labour, T&P, all lifts and leads etc. complete. |
| 8 | Providing and Laying M-25 C.C. (1:1:2) cement concrete including cost of all materials, labour, T&P, all lifts and leads etc. for proper completion of work. |
| 9 | Providing and Laying R.C.C. 1:1.5:3 cement concrete including cost of all materials, labour, T&P, all lifts and leads etc. for proper completion of work. |
| 10 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads, all labour and T&P etc. for proper completion of work. |
| 11 | Centering & shuttering for R.C.C. works including cost of all material, labour and T&P etc required for proper completion of work. Please Enable Macros to View BoQ information |