| 1 | NOTE: Contractor should rate with all taxes. |
| 2 | Earth work in excavation by mechanical means over areas ( exceeding 30 cms and upto 1.5 m in width as well as 10 sqm on plan ) including disposal of excavated earth upto 1 mtr. For cutting edge, disposal earth to be leveled and neatly dressed in all kinds of soil. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering in 1:4:8 mix ( including water charges). Complete Job |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering,finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Mild steel and medium tensile steel bars |
| 6 | Providing and laying in position specified grade of cement concrete including curing but excluding the cost of centering, shuttering,finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement: 3 coarse sand) including making joints with or without grooves (thickness of the joints except at sharp curve shall not to be more than 5mm) including making drainage opening wherever required complete etc. as per direction of Engineer-incharge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 8 | Centring and shuttering including struting, propping etc. and removal of forms for: Foundations, footings, bases of columns etc. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 9 | Supplying and stacking at site Good Earth |
| 10 | Spreading of sludge, dump manure or/and good earth in required thickness as per directions of officer in-charge |
| 11 | Grassing with selection no. 1 grass including watering & maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds & fit for mowing including supplying of good earth if needed (the good earth shall be paid separately.) In rows 5 cm apart in either direction |
| 12 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface |
| 13 | Finishing walls with acrylic smooth exterior paint of required shade on New work (Two or more coats applied @ 1.67 liter/10sqm over and including priming coat of exterior primer applied @ 2.20kg/10sqm) |
| 14 | 12mm thick cement plaster in 1:4 mix ( 1 cement: 4 sand) Please Enable Macros to View BoQ information |