| 1 | Item No- 1 : - Excavation in soft rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with lead up to 15 m and all lifts as directed. |
| 2 | Item No- 2 : - Excavation in Hard rock of all toughness by Breaker including boulders above 0.60 m dia. minimizing damage to side slopes of excavation and placing the excavated rock netely in approved dump area including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with lead up to 15 m and all lifts as directed. |
| 3 | Item No 3 :- Providing casing embankment using selected impervious material from approved borrow area (private land - contractors own material )in layers including cost of all materials, machinery,labour,all other operations such as collection of soil,spreading soil in layers of specified thickness, sorting out, breaking clods,,levelling ,sectioning edges/sides ,watering compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of water etc.. completewith lead up to 1 kilometer and all lifts as directed .. |
| 4 | Item No.4:- Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jack hammer as directed to specified depth for consolidation / contact grouting including cost of all materials, machinery, labour, cleaning holes, ventilation, lightening, drainage and all other ancillary operations etc complete. |
| 5 | Item No. 5 :- Providing and laying in situ cement concrete of grade M-15(40 MSA) of trap / granite / gneiss / quartzite / graded metal for PCC with or without surface reinforcement/ CC concreting requiring heavy or special type of shuttering for works of gallery, sluice, spillway crest, spillway downstream face, energy dissipating structures, intake structures, training walls, piers, abutments etc. with Concrete Mixer with shuttering and scaffolding, placing, compacting, curing with an initial lead of 1 km and all lifts etc. complete as directed (B) M-15 (40 MSA) (Cement 5.20 bags/Cum) |
| 6 | Item No.6 :- Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs,drawings and schedules. Including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete as directed. |
| 7 | Item No-7 :- Providing and fixing canal information board of 1.2 x 0.75 m prepared on 16 gauge M.S. sheet with angle iron frame of size 35 x 35 x 3 mm with cross bracing of size 25 x 25 x 3 mm including painting with one coat of zinc chromate storing primer and two coats each of green/white back ground and back side grey store enameled bonded with red retro reflective sheet Engineering grade, border / letters / numeral / arrows coated with non peal able crystal clear protective transparent coat retaining 100% reflection ncluding two angle iron post of size 50x50x5 mm of 3.65 m long inflated at bottom drilled on top and painted in white and black bonds of 30 cm with four numbers high strength of G.I. bolts and nuts of size 10 mm dia. and 20 mm long sheet and angle iron post in one piece without joints including all taxes, conveying, fixing in ground with cement concrete in M-15 block of size 60 x 60 x 75 cm as directed by Engineer-in-Charge. |
| 8 | Item No.8- Laboratory testing charges for various materials required for items of work, on the basis of testing frequency and charges fixed by Vigilence and Quality Control Circle, Pune.A) Compressive Strength for C C Cube |
| 9 | B)Murum - Liquid limit and Plastic Limit |
| 10 | Item No 09 :- Royalty charges for various building construction bonafied materials which are used for government bonafied works and for which Royalty charges are to be paid by the contractor. A) For Sand |
| 11 | B) Metal + Murum Please Enable Macros to View BoQ information |