| 1 | SHIFTING OF 11 KV LINE ROAD CROSSINGPROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC ACSR RABBIT CONDUCTOR |
| 2 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR STP POLE 11 MTR LONG |
| 3 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR CROSS BRACING M S ANGIL |
| 4 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR BOLT & NUT |
| 5 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR STONE PAD |
| 6 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR GARURDING ANGLE 50X50X5X2500 MM |
| 7 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR DROPPER CHANNEL 100X50MM |
| 8 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR TOP CHANNEL 100X50X2240 |
| 9 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR T, DEROPER,TOP CHANNEL CLAMP |
| 10 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR 11 KV POLYMERIC DISC INSULATOR With Fitting |
| 11 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR EARTHING COMPLETE |
| 12 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR G.I.WIRE 6 SWG |
| 13 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR G.I.WIRE 8 SWG |
| 14 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR GI Barbed Wire |
| 15 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR STAY SET COMPLETE |
| 16 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR DANGER BOARD WITH CLAMP |
| 17 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR CONCREATING OF POLE/STP |
| 18 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR NUMBER PLATE With Clamp |
| 19 | SHIFTING OF 11 KV LINE DISTRIBUTION TRANSFORMERPROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC ACSR RABBIT CONDUCTOR |
| 20 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC LT CABLE XLPE AL. 3.5X120 SQ. MM |
| 21 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC PCC POLE 8.5 MTR LONG |
| 22 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC 11 KV TPМО |
| 23 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC 11 KV FUSE SET |
| 24 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC STONE PAD |
| 25 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC LT incoming panel with metering equipment & fixing arrangement (LS) |
| 26 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC TEE-OFF CHANNEL |
| 27 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC DROPPER CHANNEL 100X50мм |
| 28 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC TOP CHANNEL 100X50X2240 |
| 29 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC T, DEROPER,TOP CHANNEL CLAMP |
| 30 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC BOLT & NUT |
| 31 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC MS S/S BASE ANGIL 75X75X6X2028 |
| 32 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC 11 KV POLIMIC PIN INSULATOR |
| 33 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC 11 KV POLYMERIC DISC INSULATOR |
| 34 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC EARTHING COMPLETE |
| 35 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC STAY SET COMPLETE |
| 36 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC STAY INSULATOR |
| 37 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC DANGER BOARD WITH CLAMP |
| 38 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC CONCREATING OF POLE/STP |
| 39 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC NUMBER PLATE |
| 40 | SHIFTING OF LINE SIFFTING OF 11 KV Overhead LinePROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC ACSR RABBIT CONDUCTOR |
| 41 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC PCC POLE 8.5 MTR LONG |
| 42 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC CROSS BRACING MS ANGIL |
| 43 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC CLAMPS WITH BOLT & NUT |
| 44 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC 11 KV XLPE 3X70 |
| 45 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC 11 KV XLPE O/DCABLE JOINTING KIT 3 X70 SQ MM |
| 46 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC STONE PAD |
| 47 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC TEE-OFF CHANNEL |
| 48 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC DROPPER CHANNEL 100X50MM |
| 49 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC TOP CHANNEL 100X50X2240 |
| 50 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC T. DEROPER,TOP CHANNEL CLAMP FOR ST/PCC POLE |
| 51 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC CROSS ARMS V-TYPE 11 KV |
| 52 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC CROSS ARM HOLDING CLAMP |
| 53 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC F-CLAMP |
| 54 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC BOLT & NUT |
| 55 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC 11 KV POLIMIC PIN INSULATOR |
| 56 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC 11 KV POLYMERIC DISC INSULATOR |
| 57 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC EARTHING COMPLETE |
| 58 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC GI Barbed Wire |
| 59 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC STAY SET COMPLETE |
| 60 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC STAY INSULATOR |
| 61 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC DANGER BOARD WITH CLAMР |
| 62 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC CONCREATING OF POLE/STP |
| 63 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC NUMBER PLATE |
| 64 | SHIFTING OF LT LINE CROSSINGPROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR PCC POLE 11.00 MTR LONG |
| 65 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR STP POLE 11.00 MTR LONG |
| 66 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR STONE PAD 300X300X75MM |
| 67 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR L T AB CABLE 3X95+1X70+1X16)SQMM |
| 68 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR SUSPENSION CLAMP |
| 69 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR THREE PHASE DISTRIBUTION BOX |
| 70 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR THREE PHASE DISTRIBUTION BOX CLAMPS (LS) |
| 71 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR DEAD END CLAMP |
| 72 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR EYE-HOOK |
| 73 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR J HOOK |
| 74 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR BOLT & NUT |
| 75 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR STAY COMPLETE. |
| 76 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR EARTHING COMPLETE. |
| 77 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR CONCRETEING OF POLE / STP |
| 78 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR LT SHACKLE INSULATOR |
| 79 | SHIFTING OF LT LINE OVERHEADPROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR PCC POLE 8.50 MTR LONG |
| 80 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR STONE PAD 300X300X75MM |
| 81 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR L T AB CABLE 3X95+1X70+1X16)SQMM |
| 82 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR L T AB CABLE 3X95+1X70+1X16)SQMM |
| 83 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR ETC FOR SUSPENSION CLAMP |
| 84 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR THREE PHASE DISTRIBUTION BOX |
| 85 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR THREE PHASE DISTRIBUTION BOX CLAMPS (LS) |
| 86 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR DEAD END CLAMP |
| 87 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR EYE-HOOK |
| 88 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR J HOOK |
| 89 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR STAY COMPLETE. |
| 90 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR EARTHING COMPLETE. |
| 91 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR CONCRETEING OF POLE / STP |
| 92 | PROVIDING/FIXING/ERECTION INCLUDING ALL LABOUR FOR BOLT & NUT Please Enable Macros to View BoQ information |