|
| 1 | Earth work excavation in hard soil withen 50 met initial lead and 1.5 met lift including dressing and levelling the foundation bed….etc |
| 2 | Sand filling in foundation and plinth with well watered and and ramming ..etc |
| 3 | PCC (1:3:6) using 40 mm size CBHG metal in foundation and base including cost conveyance royality ..etc |
| 4 | RCC M20 using 12mm size C.B.H.G chips etc incl cost of all materials & Labours:- Ground Floor |
| 5 | Supplying, fitting,fixing & placing Uncoated HYSD bar reinforcement complete. Ground Floor |
| 6 | Rigid and smooth centering ,shuttering for R.C.C. work including false works and dismantling them after casting. Column-Ground Floor |
| 7 | Plinth Bend- Ground Floor |
| 8 | lintel-Ground Floor |
| 9 | Wall beam-Ground Floor |
| 10 | Slab-Ground Floor |
| 11 | Brick work with FLY ASH.23x11x8 Brick having crushing strength between 35 Kg/cm^2 to 149 Kg/cm^2 in C.M. ( 1 : 6 ) in foundationin and plinth including cost, carriage and royalty etc. |
| 12 | Brick work with FLY ASH. Brick having crushing strength between 35 Kg/cm^2 to 149 Kg/cm^2 in C.M. ( 1 : 6 ) in super structure including cost, carriage and royalty etc. Ground Floor |
| 13 | 12 mm thick CP with CM (1:6) including all cost, conveyance & royalty etc all complete. Ground Floor |
| 14 | 16 mm thick Cement Plaster with CM (1:6) including all cost, conveyance & royalty etc. complete. Ground Floor |
| 15 | 12 mm thick CP with CM (1:4) including all cost, conveyance & royalty etc all complete-Ground Floor |
| 16 | Supplying fitting fixing of M S door & window ….etc-Ground Floor |
| 17 | Providing, fitting and fixing of Aluminium Door with anodized Aluminium Door section-9202 as vertical member, 9201 as top, 9200 as bottom and middle member with frame section as 9221 with tapered clip no 4660 and frame to be completed by means of jointing angle no - 1855 including all cost of labour, hire charges, drilling machine etc complete. ( Ref- Chapter XIX- Other Building Items, Sl. - (6) ) |
| 18 | Fixing Vetrified tiles in floors,treads of steps and landing on 20 mm thick bed of cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials, labours T&P, rubbing and polishing etc all complete. Ground Floor |
| 19 | Fixing Ceramic tiles in dados skirting and risers of steps on 12 mm thick bed of cement plaster (1:3) jointed with neat cement slury mixed with pigments to match the shade of the tiles including rubbing and polishing etc all complete.Ground Floor |
| 20 | Fixing Chequred tiles in floors,treads of steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigments to match the shade of the tiles including rubbing and polishing etc all complete. Ground Floor |
| 21 | Finishing surface of wall with Acrilic Wall Putty (Water based) of approved make and finished smooth and even surface to received painting including cost of puty all labour T&P etc complete. Ground Floor |
| 22 | Priming one coat of Wall cement Primer (Water bound) including cost of primer all labour T&P etc complete. Ground Floor |
| 23 | Distempering two coats to wall with distemper of approved shade on new work including all cost etc complete. Ground Floor |
| 24 | Finishing wall painting two coats with any approved weather seal coat paint including all cost, carriage,royalty etc co-Ground Floor |
| 25 | Painting two coat with any approved paint on Iron work over a coat of priming including all cost,carriage,royalty etc omplete. Ground Floor Please Enable Macros to View BoQ information |