| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area clearance |
| 2 | Cleaning and removal of earth, silt, sludge, kankar, boulder, building material and garbage in existing nallah/drains including construction of bye pass arrangement to byepass water with 1.5m lift from ground level and lead upto 50 m including foul & saturated condition where pumping out or bailing out of water is required, including shoring, shuttering where required and dewatering. Making access for disposal and dressing disposal side as per the directed of the Engineer.For depth above 1.50 m and upto 3.00 m |
| 3 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
| 4 | Coarse sand (zone III) |
| 5 | Supplying, Filling and stitching of empty cement bags either ofplastic or jute with earth avaiable at site of wieght not less than 40 kg including stacking and removing. |
| 6 | Carriage of materials by mechanical means including loading,unloading and stacking of Earth, Sand, Lime, Morrum manure or sludge Upto 5 km |
| 7 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:In cement mortar. |
| 8 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 9 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40mm nominal size). |
| 10 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in :Cement Mortar 1:4 ( 1-Cement : 4-Sand). |
| 11 | Extra for laying stone work in or under foul position. |
| 12 | Pointing on stone masonry in cement sand mortar 1:3 (1 cement : 3 sand) : Flush / Ruled/ Struck or weathered pointing. |
| 13 | Providing and laying damp-proof course with cement concrete grade M-150 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification .50 mm thick |
| 14 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide Extra if square,rectangular hollow tubelar sections are used or grill made by flats only |
| 15 | Supplying and fixing Soorsagar Bhura or Equivalent ashlar sills, lintels and dassa, bearing, bed & top surface made perfenctly even, jambs, skirting steps etc. rough dressed: Above 15 cm. and upto 20 cm. thick |
| 16 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level- M20 grade Nominal Mix.1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). Please Enable Macros to View BoQ information |