Name of Work:- Provn for Accn of 10 X WMP with attached bathroom at P-198 under GE (P) No 1 Jabalpur
Sl. No.
Item Description
1
SCHEDULE \\"A\\"
2
SCHEDULE \\"A\\" PART-I (Building Work)Lump sum price worked out by the contractor for 'Building Work' as listed in Schedule 'A' Part-I against the lump sum price inserted by the MES.
3
Sch 'A' Part-II (Internal Water Supply) Lump sum price worked out by the contractor for 'Internal Water Supply' as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES.
4
Sch 'A' Part-III (Internal Electric Supply) Lump sum price worked out by the contractor for 'Internal Electric Supply' as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES.
5
Sch 'A' Part-IV (External Water supply) Lump sum price worked out by the contractor for 'External Water supply' as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES.
6
Sch 'A' Part-V (External Electric supply) Lump sum price worked out by the contractor for 'External Electric supply' as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES.
7
Sch 'A' Part-VI (PATH ) Lump sum price worked out by the contractor for 'Road & Hard standing' as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES.
8
Sch 'A' Part-VII (Sewage Disposal) Lump sum price worked out by the contractor for 'Sewage Disposal' as listed in Schedule 'A' Part-VII against the lump sum price inserted by the MES.
9
Sch 'A' Part-VIII (Summer & Cooling Appliances) Lump sum price worked out by the contractor for 'Summer & Cooling Appliances' as listed in Schedule 'A' Part-VIII against the lump sum price inserted by the MES.
10
Sch 'A' Part-IX (Site clearance, excavation & earth works for external services) Lump sum price worked out by the contractor for 'Site clearance, excavation & earth works' as listed in Schedule 'A' Part-IX against the lump sum price inserted by the MES.
11
Note for Srl No 02 to 10The percentage above / below the SSR -2020 (part-II) rates shall be derived from the amount quoted by the contractor against Srl No. 02 to 09 by comparing it with the amount inserted / pre- priced by the department and the same shall be applicable for the items of respective schedule
12
Schedule 'A' Part-X (Miscellaneous works)
13
Item No 01 : M&L for construction of masonry valve pit with the following specification:- Brick work in CM (1:4) with sub class 'B' bricks,15mm thick plastering in CM (1:4), PCC (1:4:8) type D-2 in foundation, chamber of internal size 600mmx600mmx600mm,150mm thick copping on top in PCC (1:3:6), type C-1, 3mm thick MS sheet for cover, angle iron 50cmx50cmx6mm for frame all around with suitable handle with locking arrangement including two coats of synthetic enamel paint over a coat of red oxide primed on MS work and three coats of white wash and preparation of surfaces complete all as specified .
14
Item No 02 : Supplying and laying and jointing for (SN 8) DWCPE 180mm (OD)/ 163 (ID) conforning to IS-16098:2013 part -I with and incl jointing materials complete complete all as specified and as directed. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.