|
| 1 | Dismantling tiled floors laid in mortar upto floor two level including stacking of serviceable materials and disposal of unserviceable materials within 20 metres lead (wooden / concrete joists to be measured and paid for seperately) complete as per architectural drawings and the directions of Engineer-In-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government.a) For thickness of tiles upto 25 mm |
| 2 | Providing and laying Vitrified tiles (1200*600) mm in (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufacturer, in all colours and shade, in skirting, riser of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately) as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges. The rate including of octory, royalty, malkana,toll tax, sal tax or other taxes imposed by goverment. The size shown in inicative and Engineer-in-charge decision /approval will be final. |
| 3 | Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge. |
| 4 | Applying birla wall putty two coats over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matt finish to the surface complete as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government |
| 5 | Applying priming coat with readymixed primer on new concrete/masonry/asbestos cement/plastered surfaces after and including preparing the surface by thoroughly cleaning oil,grease,dirt and other foreign matter and sand papering as required complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 6 | Painting two coats(excluding priming coat on new concrete/ masonry/plaster surfaces with readymixed paint of approved brand and manufacture for use on floors to give an even shade including cleaning the surface of all dirt,dust and other foreign matter and sand papering as required with Paint other than white complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge |
| 7 | Painting two coats (excluding priming cost on new steel and other metal surfaces with enamel paint white brushing to give an even shade including cleaning the surface of all dirt,dust and other foregin matter paint complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 8 | Finishing wall with weather proof exterior grade emulsion of approved design (Apexultima) of Asian paints/Nerolac paints or its equarlied brand and manufacture of approved shade on undecorated concrete / stone / plastered wall surfaces with two coats to give an even shade and final finish after thoroughly cleaning / brushing the surfaces free from all dirt , dust mortar dropping and other foreign matter and sand papered smooth including applying of putty as required for making the surfaces upto all floor level complete as per HP.PWD. Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the govt. |
| 9 | Painting two coats (excluding priming costs) on new wood and wood based surfaces with enamel paint white to give an even shade including cleaning the surfaces of all dirt, dust and other foreign matters sand papering and stopping for all floor including carriage of materials through all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. Please Enable Macros to View BoQ information |