| 1 | Dismantling tile work in floors and roofs laid in cement mortqr including stacking of serviceable material and disposal of unserviceable material within 50 meter lead : For thickness of tiles 25 mm to 40 mm. |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 3 | Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed : All kinds of soil |
| 4 | Removal of blown sand including taking out and disposal of excavated material with lead up to 50Mtr. and lift up to 1.5 Mtr disposed soil to be levelled and neatly dressed. |
| 5 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 6 | Random Rubble stone masonry for foundation and plinth in Cement Sand mortar above 30CM thick wall in:Cement Mortar 1:6 (1 cement : 6 sand) |
| 7 | R.R. stone masonry for superstructure above plinth level one storey height above 30 cm. thick walls in: Cement Mortar 1: 6 (1 cement :6 sand) |
| 8 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix |
| 9 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. |
| 10 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code) |
| 11 | Supply and fixing Jodhpur sand stone Machine cut Dash, Coping,sill,lintel fixed in cement sand mortar 1:4 9 cm (3.5\\") thick |
| 12 | Pointing on stone masonry in cement sand mortar 1:3 (1 cement : 3 sand) : Deep groove pointing |
| 13 | Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaffolding and safety provision New Work |
| 14 | Painting exterior surface of Wall with 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty, etc complete in all respect including scaffolding and safety provision Old Work |
| 15 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide |
| 16 | Extra if square,rectangular hollow tubelar sections are used or grill made by flats only |
| 17 | Providing and fixing welded mesh/expanded metal mesh in frame work, flat iron beading 20x3mm including top cross laps inside and out sides welding, iron bolts, crews, clips etc. complete (excluding frame work) of size. Welded mesh 50 mmx 50 mm x 2.1 mm |
| 18 | Providing and fixing Stone jali 40mm thick Red/Pink sand stone throughout in cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment, matching the stone shade, jali patterns to be cut square to jali slab without any chamfers etc: |
| 19 | Supply and fixing Jodhpur sand stone Machine cut Kerb stone (10cm wide 40 cm. height) fixed in white cement sand mortar 1:4 with pigment including EarthWork. |
| 20 | 25mm thick fine dressed and machine grinded surface stone flooring over 20mm (av.) thick base in cement in CM 1:6 with joints finished flush with: White sand stone |
| 21 | Transportation or excavated earth with all leads and lifts.upto 5 Km. |
| 22 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, making of lines or groove etc complete but excluding the cost of nosing of steps etc. complete. 40mm thick with 20mm thick nominal size aggregate. |
| 23 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 20mm thick . |
| 24 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 25 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : One or more coats on old work. |
| 26 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding: New work (Two or more coats applied @ 3.84 kg/10 sqm). |
| 27 | Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 (1 cement : 4 coarse sand) Dark shade using ordinary cement. |
| 28 | Supplying and fixing Soorsagar Bhura or Equivalent ashlar sills, lintels and dassa, bearing, bed & top surface made perfenctly even, jambs, skirting steps etc. rough dressed: Upto 15 cm. thick |
| 29 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 30 | Re-fixing old ashlar stone w/o dressing White Ashlar |
| 31 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete New Plastered Surface (three or more coats) |
| 32 | Supplying and fixing in walls machine cut and polished stone shelves, tands and in CM 1:3 with machine cut edges : Sand or other approved stone 50mm thick. |
| 33 | 25mm thick fine dressed and machine grinded surface stone flooring over 20mm (av.) thick base in cement in CM 1:6 with joints finished flush with: Red sand stone |
| 34 | Demolishing cement concrete including disposal of material within 50 meter lead : 1:4:8 or leaner mix. |
| 35 | Distempering with dry distemper of approved brand and shade (two or more coats) and of required shade on new work, over and including, priming coat of whiting to give an even shade including all scaffolding. |
| 36 | Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding: Old work (One or more coats). |
| 37 | Dismantling tile work in floors and roofs laid in cement mortor including stacking of serviceable material and disposal of unserviceable material within 50 meter lead : For thickness of tiles 10 mm to 25 mm. |
| 38 | Dismantling kerb stones by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per MoRTH Specification Clause 202. |
| 39 | Removing dry or oil bound distemper by scrapping sand papering and preparing surface smooth including necessary repairs to scratches by sandla/loi and all scaffolding (for colour changing only) |
| 40 | Wall painting with Royal Play paint with various types of designs as approved of approved brand and manufacture to give an even shade including all scaffalding. Two or more coats on New work including preparation of base with primer, putty lippy etc. Complete in all respect. |
| 41 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. Please Enable Macros to View BoQ information |